Mountains-to-Sounds Phase 1 Trail Extension. What is this Mountains-to-Sounds Greenway ? 100 miles of trail along I-90 from central Washington to Seattle.

Slides:



Advertisements
Similar presentations
4 Process Mapped and documented current conditions and trail use patterns Community outreach Seven initial public meetings were held at locations.
Advertisements

Preserve Sudbury Vote NO to the Rail Trail Articles
The Virginia Capital Trail
ROUTE 27 (PARK STREET) CORRIDOR SEWER EVALUATION Mark J. Thompson, P.E. Gus O’Leary Kleinfelder / S E A Consultants Inc.
Octoraro Rail Trail. Intro  DCTMA formed Bike/Ped Committee in 2012  Mission is to support implementation of Delco Bike Plan  Selected Octoraro Rail-Trail.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Annual General Meeting Community Development Updates April 13 th, :00 pm – 4:30 pm.
Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014.
Examples of Context Sensitive Solutions in an Urban Environment ITD Project Development Conference April 7, 2005 Doug Camenisch, P.E. Parametrix.
December 6, 2012 Public Meeting. AZ Canal Multiuse Path  Construct a 10-foot concrete path along one side of the Arizona Canal from Chaparral Road to.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
Virginia Street Corridor Plan. From our Tier One University, world renowned recreation and our Midtown entertainment area to abundant cutting edge business.
Contact: Beth Morris
Bring the Trail to Sudbury: Vision & Offer Friends of the Bruce Freeman Rail Trail September 22, 2011 Rail Trail Conversion Advisory Committee Meeting.
Space Coast Loop Trail - Brevard County
Central Business District Study Area 1500 acres along Peachtree Pkwy.
Public Location/Design Hearings November 17, 2010 Laughlin, Nevada November 18, 2010 Bullhead City, Arizona.
Town of New Hartford Southern Area GEIS Summary Presentation Planning Board Meeting Monday, June :30 pm.
Phase Difference = Phase Difference = 0.05.
HOOSIER HEARTLAND HIGHWAY Public Information Meeting – August 27, 2009 STATE ROAD 25, SEGMENT 2 From 0.42 mile east of Tippecanoe/Carroll County line to.
1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development.
Bicycle and Pedestrian Planning May City of Ellsworth Bike-Ped Planning May 2009 Accomplishments: POLICY and ADMINISTRATION The City Council adopted.
August 2004 Hickory by Choice Linking Land Use and Air Quality Planning.
Application of SHRP2 Decision Support Tool to SR 509 Corridor Planning The 14th TRB National Transportation Planning Applications Conference May 8, 2013.
MECKLENBURG COUNTY PARK AND RECREATION DEPARTMENT CAPITAL NEEDS ASSESSMENT PROCESSES Citizens Capital Budget Advisory Committee Presentation November 1,
Trail Funding Sources & General Information
Grand Canalscape Phase I: Phoenix Uptown and Gateway North Update Kerry Wilcoxon City of Phoenix Street Transportation Department Safety and Neighborhood.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Land Chapter 14.
Initial Applications for Automated Vehicles on Exclusive Roadways Advanced Transit Association Annual Technical Meeting January 11, 2009 Washington, DC.
Public Space and Recreation Uses at the Baylands With: Michael Tymoff, City of San Francisco Dave Gould, California State Parks Michael Boland, The Presidio.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Spokane River Riparian Enhancement Project at State Line.
Community Development Department Construction Phase.
Making the Most of a Linear Park Hugh Morris Rails-to-Trails Conservancy
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2011/12 – 2015/16 Presentation to Board of County.
Bus to town centers at 5 p.m. for $2 At the Y Monday’s 2-5 In the Y room.
RANCHO PALOS VERDES WELCOME Vision Plan and Public Use Master Plan Visioning Workshop June 3 rd, 2006.
This is Arches National Park Located in southeast Utah, USA : 5 miles north of Moab, Utah 236 miles south of Salt Lake City Most visits to Arches involve.
Public Information Meeting
NATIONAL ASSOCIATION OF COUNTY ENGINEERS Timothy Hens, PE NACE State Director – New York County Engineer, Genesee County, NY.
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
SUNSET BEATTIES FORD COMPREHENSIVE NEIGHBORHOOD IMPROVEMENT PROGRAM September 29, 2015.
Viewed from Pillar Point Bluff preserve and CA Coastal Trail, the Big Wave site lies between Pillar Point Marsh and the open farmed fields of Half Moon.
Lake Marion / South Creek Greenway Project Introduction December 2012 Lake Marion / South Creek Greenway Project Introduction December 2012.
Mendota / Lebanon Hills Greenway Project Introduction November 2012 Mendota / Lebanon Hills Greenway Project Introduction November 2012.
Tonight’s Schedule Introduction Presentation Question and Answer Session Open House Staff at displays to answer questions Complete comment cards and/or.
Union Park District Council Ayd Mill Road Task Force St. Paul Capital Improvement Budget Proposal
Courtesy Corbis Images.  Given:  Seattle’s Environmentally Friendly Population  Good Public Opinion of Low Impact Commuting  Largely Fragmented Bike.
Parrish Design Principles A Community-Based Planning Project Sponsored by Manatee County What’s Your Opinion? Responses to October 2003 Newsletter.
Introductions Army Corps of Engineers Metro Parks Mayor’s Office HDR Engineering, Inc.
Chapel Hill Parks and Recreation. “Networks of natural spaces which provide corridors connecting areas such as neighborhoods, parks, and schools.
Phoenix Grand Canalscape Kerry Wilcoxon, P.E., PTOE City of Phoenix Street Transportation Department 65 th Arizona Roads and Streets Conference March 24,
Open Space, Trails, and Greenways Planning Study Pleasant Valley Recreation and Park District March 28, 2013.
Public Input Meeting April 16, Meeting Schedule Housekeeping Meeting Schedule – Open House – 6:00-6:30 pm – Presentation – 6:30-7:00 pm – Q&A –
Est. Begin Construction
Jeremy Area Transportation Plan
City Council Meeting November 7, 2016
Ideal Locations for Wind Power Generation in Washington State
The City of Colorado Springs Recognized a Unique and Powerful Window of Opportunity: Linking Expansion of its Knowledge and Innovation Capacity (UCCS)
Center City Connector 101.
Planning Commission November 4, 2010
Land Chapter 14.
Fred George Basin Greenway
Ellsworth Library Trail
Lake Apopka North Shore Update
Seattle Bike Routes: Establishing a Central Link
Source Document: Analyst: Date:
Land Chapter 14.
Engineering Department
Presentation transcript:

Mountains-to-Sounds Phase 1 Trail Extension

What is this Mountains-to-Sounds Greenway ? 100 miles of trail along I-90 from central Washington to Seattle Preserves open spaces and wildlife habitat

What is this Project? Project Objective : - Extend the multi-use trail to connect with transit, other trails, and eventually the waterfront How we are going to meet Objective : Phases 1 – Extend trail to Holgate 2 – Connect trail to waterfront via Airport Way

Phases - Overall I-5 I-90 Jose Rizal Park FHWA RoW Start of Phase 1 End of Phase 1 Start of Phase 2 End of Phase 2

Phase 1 Schedule

Phase 1 Budget

Design Features Multiuse Trail LandscapingLighting Wayfinding Fencing

Phase 1

Currently Under Jose Rizal Bridge Future Trail Under Jose Rizal Bridge

Phase 1

Current Jose Rizal Park Future Trail Jose Rizal Park

Phase 1

Current WSDOT Access Road Future Trail WSDOT Access Road

Phase 1

Current WSDOT Access Road Terminus at Holgate Future Trail WSDOT Access Road Terminus at Holgate

Example of trailhead treatment Trail Phase 1 Current Holgate and WSDOT Access Road Intersection

SDOT Project Manager [PM] Brian Holloway Ph: SDOT Public Information Officer [PIO] George Frost Ph: Questions ? SDOT Project Engineer [PE] Esther Chinn Ph: WSDOT Project Manager [PM] Bruce Nebbitt Ph: