INSTALLATION OF TOPSIDE USING FLOATOVER METHOD

Slides:



Advertisements
Similar presentations
Energy Conservation Energy Management.
Advertisements

Cofferdam.
FPSO Mooring Monitoring & In-service Inspection FPSO Research Forum Richard Leeuwenburgh College Station – May 1 st 2003.
Edit this text for your title
Edit this text for your title
Figures in Chapter 1. Learning objectives After studying this chapter, you should be able to; Define logistics and supply chain management. Describe logistics.
®.
Self Installing Wind Turbine (SIWT) Mark Riemers – Managing Director.
MWCC Overview, Well Containment Operations & SIMOPS Spill Control Association of America – Annual Meeting March 20, 2014 Carmine Dulisse.
Impact of Increased Modularization New Orleans, 27 October 2011 Guus Stigter.
Vedam VEDAM DESIGN & TECHNICAL CONSULTANCY PVT. LTD , Acropolis, Military Road, Marol, Andheri (E), Mumbai-59, INDIA ,
Boating is fun… we’ll show you how America’s Boating Course 3 rd Edition 1Trailering Chapter 4 Section 14 >>
THE MONOPOD BUCKET FOUNDATION Recent experience and challenges ahead Christian LeBlanc1, Kim Ahle1, Søren A. Nielsen 2, Lars B. Ibsen 3 1) DONG Energy,
ITIL: Service Transition
Modular Crane Control System (MCCS)
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
Edit this text for your title Edit this text for your sub-title Presenter name, location, date etc. MEK 4450 Marine operations Kværner ASA, UiO, Oct
©© 2013 SAP AG. All rights reserved. Scenario/Processes Make-to-Stock Scenario Overview Planning Supply Initiating Production Executing Production Processing.
PRE-FABRICATED STRUCTURES
C-Power NV is a Belgian company established for the development and implementation of a farshore wind farm on the Thorntonbank. Welcome Objective Partners.
Overview of Oil & Gas Sector The following slides are not a tutorial but merely an overview of the various phases involved in an oil & gas development.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Maryam Aljaber PBL Q2. Types of oil platforms Fixed platform. Complaint tower. Sea star Floating production system. Tension-leg platform. Spar.
1) The history of Technip 2) Range of services
Marine Coordinating - more efficient and cost saving operations.
Deepwater drilling challenges Gm, Drilling – murphy malaysia
MFP – Installation using a Jack up Rig
1. 2 Organizational Structure OSX Ownership OSX Leasing OSX Shipbuilding Unit OSX Services Free Float Integrated offshore E&P equipment and services provider.
New Technical Approach to Classification of Anchor Handling and Diving Support Vessels A. DEVADAS RINA MUMBAI.
Innovative Technologies, Creative Solutions Turret Mooring Design – Some Challenges and Solutions FPSO Forum 2004 NUS, Singapore Arun Duggal FMC SOFEC.
SEMINAR ON :. ORGANISATION Organizations are formal social units devoted to attainment of specific goals. Organizations use certain resources to produce.
Welcome to the Lassonde Design Club Promoting Design Skills and Practices.
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
1 What is Precast Concrete? Precast concrete consists of a mixture of cement, water, aggregates and admixtures. This mixture is cast into a specific shape.
Edit this text for your title Edit this text for your sub-title Presenter name, location, date etc. MEK 4450 Marine Operations Kværner ASA / DNV, UiO,
Telescope Integration and Tests Tuesday Afternoon.
TMR4225 MARINE OPERATIONS SPRING 2007 Introduction.
PHASE 7 FACILITIES ENGINEERING
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
IN MODULAR CONSTRUCTIONS
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration Installation requirements & Procedure.
Edit this text for your title Edit this text for your sub-title Presenter name, location, date etc. MEK 4450 Marine Operations Kværner ASA / DNV, Fall.
Title of Powerpoint Subhead Name of Presenter Title of Presenter, Company Date of Event Location of Event Offshore vs. Near-shore FLNG: Functional & Regulatory.
 FPSO — floating production, storage, and offloading systems; offloading of the crude oil to a shuttle tanker;  These are typically converted or newly.
COFFERDAMS.
KM3NeT deployment aspects Transportation – Deployment – Connection - Calibration Spyridon Koutsoukos.
PPM DU Sea Qualification Tests 1.General constraints & requirements 2.Preliminary tests 3.Full mechanical test.
Euromed October 2010 A Flexible Desalination Solution.
Concrete Repair presented by: Amirhossein Jodeiri Mapua Institute Of Tecnology.
Heavy Lift Offshore Conference- RINA 2008 –Float Over Method FLOATOVER.
Sub:- Fluid Power Engineering Topic :- Hydraulic crane
Concrete Repair.
ITIL: Service Transition
Make-to-Stock Scenario Overview
Structural verification and certification of two existing platforms
Renewables Capability Presentation All Energy May 2017
OFFSHORE CONSTRUCTION
New Bridge Construction
MULTI-PURPOSE DOCK GARY PAXTON INDUSTRIAL PARK | SITKA, ALASKA
Make-to-Stock Scenario Overview
Icebreaker Wind Supply Chain Open House
INSTRUCTOR © 2017, John R. Fanchi
Leading Indicators and Dashboarding for Advanced Work Packaging
Sales Order Process.
Suryoday Technologies ISO 9001:2015 Co.
TMR4225 Marine Operations, UUV/AUV definitions
Installation Binder / IRR – an example
Presentation transcript:

INSTALLATION OF TOPSIDE USING FLOATOVER METHOD Kuliah Tamu Fakultas Teknologi Kelautan - ITS 2 November 2010 By. Ir. Ice Achmad Kurniawan 1

Agenda Why Floatover Floatover Concept Design Engineering Barge Equipment and Appurtenances Floatover Sequences 6. Procurement 7. Marine Spread 2

1. WHY FLOATOVER Conventional method: LIFTING WHY FLOATOVER Unavailability of suitable vessel with crane capability to install heavy topside (>2000MT) Cost and schedule advantages of installing pre-commissioned, integrated, single-piece topsides. Desire to reduce increasingly expensive offshore hook-up and commissioning time Now more demanding due to Scarce availability of heavy-lift crane vessels for work in shallow waters 3

2. FLOATOVER CONCEPT The topside module typically is placed on a barge or heavy transport vessel positioned within (internal slot of jacket) or around the legs (external) of a pre-installed jacket The module then is settled onto the jacket legs by a combination of vessel ballasting and a mechanical lowering system. The operation of incrementally transferring the module loads from the barge to the jacket (MATING operation) Undocking, sufficient clearance, vessel move out from the jacket 4

T&I DESIGN ENGINEERING 3. FLOATOVER T&I DESIGN ENGINEERING 1. Deck Mating analysis 2. Barge Strength Check (load out & transportation condition) 3. Transportation Analysis 4. Mooring Analysis 5. Seafastening Design 6. Floatover Rapid Ballast System Design 7. Jacket Structural Analysis (allowable limit during floatover) 5

PROCESS DESIGN FLOW DIAGRAM 6

MATING ANALYSIS To simulate the barge’s motion characteristic and to identify the loading on the jacket using a time domain analysis. Multiple load cases were identified from the initial stage, docking, load transfer and undocking stage to represent the floatover method The load impact result shall be within allowable jacket design load Installation sea states criteria shall be established at up front stage as an input for the analysis. Software use MOSES or LIFSIM Seastate Input (Installation Criteria) Head/stern sea Hs = 1.00 m Tz up to 7.5 s Quartering sea Hs = 0.75 m Tz up to 7.5 s Beam sea Hs = 0.50 m Tz up to 7.5 s Output will be used to determine the flaotover workability 7

DSF-BARGE SEAFASTENING 8

TOPSIDE-DSF SEAFASTENING 9

LMU 10

DSU 11

PLAN LAYOUT LOAD OUT 12

LAY OUT FENDERING SYSTEM 13

JACKET ALLOWABLE IMPACT LOAD 14

4. FLOATOVER OPT.SEQUENCES Standby - The vessel is a safe distance from the substructure but connected to the mooring system, preparation rapid ballast system or the hydraulic jacks are under way Docking - The vessel enters the substructure and alignment Pre-Mating - When ballasting the vessel to match the leg mating units (LMU) with receptors on top of the substructure legs and removing the remaining tie downs, it is critical that the vessel motions be limited to suit the chosen LMU geometry. No weight transfer yet occurs Mating - The topsides is lowered onto the substructure by either rapid ballasting of the vessel or by contracting the hydraulic jacks. The topsides weight is transferred to the jacket completely Post-mating - A gap is created between the deck support units (DSU) and the vessel to ensure vessel motions will not cause contact between the two Exit - The vessel is removed from the jacket slot. Post Floatover - Removal of premooring system, clean up installation aids from jacket if required - Process of welding & NDT examination between topside leg with jacket transition pieces - Final Survey 15

ANCHOR PATTERN 16

ELEVATION 17

5. BARGE SYSTEM AND APPURTUNANCES Rapid Ballast System: to perform the load transfer in the available 12-hour tidal sequence, with specific rate. Can be external or internal (modified from existing barge ballast system) Fendering system was designed to ease the transition through the jacket with sufficient clearances, which reduced the sway impact loading upon docking. The surge fenders were installed to lock the barge in its final docking position. LMU (elastomer-based leg mating unit): to reduce the vertical impact forces (designed to support 50%) of the deck load during load transfer. DSU (Deck Support Unit), elastomer to reduce vertical impact between DSF and topside during the deck load transfer DSF (Deck Support Frame), structure to support topside during load out, transportation and floatover Barge Motion Monitoring System, electronic system to monitor motion of the barge (6 degree of freedom, the motion will be compared with mating analysis) Positioning System Wave Rider Buoys 18

BARGE GENERAL LAYOUT 19

6. PROCUREMENTS S45 PREPARATION AND FENDERING SYSTEM LINKBEAMs & LIGHT SKIDBEAMs FABRICATION 3RD PARTY MARINE SPREADS CHARTER (Various) 4. EXTERNAL RAPID BALLAST SYSTEM 5. SURVEY AND POSITIONING 6. WEATHER FORECAST 7. CATERING SERVICE 8. INSTALLATION AIDS 9. VSAT LINK SERVICE 10. AGENCY SERVICE 11.ROV 13. NDT

7. MARINE SPREAD 1 X TRANSPORTATION BARGE (S45) 1 X TOWING TUG 14,200BHP 2 X AHT 10,800BHP C/W KARMFORKS 1 X AHT 7000BHP 1 X AWB (Accommodation Work Barge), 120PAX CAPACITY, 120T CRANE 1 X CREW BOAT, 80 PAX CAPACITY 1 X ZODIAC BOAT

1.Project Description CPP Topside The NBCPP topside is a large, complex integrated deck with a not to exceed weight of 14,000 MT. The field is located approximately 60km east-north-east of the Belanak FPSO installed in the Belanak Field, located on the Block B of the Indonesian sector of the Natuna Field.

Topside using Floatover method 2.Project Phases Load out of CPP Topside on S45 Transportation of CPP Topside Sailaway Installation of CPP Topside using Floatover method on CPP Jacket Location: S45 mobilize to Topside Fabrication Yard Location: Block B of Natuna Sea – Indonesia The NBCPP is located in 95.2 m water depth

3. Scope of Work Main Scope of Work: Provision of expertise, manpower, plant, equipment, Contractor’s Spread, consumables and all other items necessary to transport CPP Topside components from the fabrication yard to the North Belut offshore Site and install them safely and efficiently.

4.Project Key Milestones Date Activity 11 June 2007 Contract Effective Date 3 Jan 2009 S45 transfer to Sintai for Fendering System and Preparation Work 1 May 2009 S45 mobilized to PTMI Yard 16 May 2009 CPP Topside loaded out onto S45 barge 1st June 2009 Sailaway of CPP Topside 6th June 2009 CPP Topside Installed using Floatover method 7th June 2009 All vessels demobilized from site

5.Interfaces with Other Company’s Contractor No Description PT Technip PT Mc Dermot PT Saipem 1 All loadout planning, engineering and AFC dwg R X Review + supply barge data, check barge strength and stability for load out 2 Load out operation   3 Structural Load out Analysis (Reaction load) 4 Transportaton Analysis 5 Mating Analysis 6 Installation Aids fixed by welding to jacket structures Supply material, Fabricate and pre install Design and supply AFC dwg and MTO 7 DSF Design Supply material, Fabricate 8 CPP Topside 9 LMU (OKI) Design, Fabricate Install 10 Seafastening Supply material, Fabricate and install 11 External Rapid Ballast System Floatover R, may request to use assistance Design and install R = Review X = Responsibility

Project Photos LOAD OUT

Project Photos TOWING

Project Photos PRE-MATING

Project Photos FLOATOVER

Project Photos FLOATOVER

Project Photos FLOATOVER

Project Photos FLOATOVER

Project Photos FLOATOVER

Project Photos FLOATOVER

Project Photos FLOATOVER