Team Project: A Surveillant Robot System Little Red Team Chankyu Park (Michael) Seonah Lee (Sarah) Qingyuan Shi (Lisa) Chengzhou Li JunMei Li Kai Lin Status.

Slides:



Advertisements
Similar presentations
Developing Learner-led Knowledge Generating Online Communities
Advertisements

Problem of the Week! Max was in charge of getting the equipment for the 14 people on his baseball team. He made sure he had 8 bats and 38 baseballs. He.
1 LaCrosse PMI Chapter Meeting A discussion about the Introduction of PM within your business 4/20/2011 Jim Strong Mayo Clinic DLMP PMO Director.
Nassau Community College
Project Management of A Practical Guide to Uppsala.
Evaluation of Vista Compared to Windows XP By Heidi Parsaye Project Research Paper CS522 Computer Communications.
© 2011 Pearson Education, Inc. All Rights Reserved An Introduction to Group Work Practice, 7e Toseland and Rivas Chapter 11 Task Groups Foundation Methods.
Microsoft Baseline Security Analyzer INLS 187 Security Software Presentation by Hinár György Polczer
1 Chapter Overview Introduction to Windows XP Professional Printing Setting Up Network Printers Connecting to Network Printers Configuring Network Printers.
Team Leader Facilitates teaching team meetings Handles or delegates administrative items Makes sure that agenda items are discussed, resolved, and followed.
Team Project: A Surveillant Robot System Little Red Team Chankyu Park (Michel) Seonah Lee (Sarah) Qingyuan Shi (Lisa) Chengzhou Li JunMei Li Kai Lin System.
Spring 2008 Mark Fontenot CSE 1341 Principles of Computer Science I Note Set 1 1.
Operating Systems Networking for Home and Small Businesses – Chapter 2 – Introduction To Networking.
OSLS First Lego League Information. Overview of FLL Program FIRST = For Inspiration and Recognition of Science and Technology Inspire young people’s interest.
Adapted for STLP Camp ‘10 STLP Robotics Camp June 3 & 4.
© 2009 FP Mailing Solutions. All rights reserved. Customer Service Training Basic Computer Training.
Course Introduction Software Engineering
EE400D DOCUMENTATION INSTRUCTIONAL SERIES MEETING MINUTES.
LOGO “ Add your company slogan ” Software Measurement & Analysis Team Assignment 2.
BUS 1040: Wk. 9 Prof. Fred Pentney 1 BUS 1040 Project Management. Wk. 9 Agenda Collect Wk. 8 Home Assignment at start of class – discuss Resource allocation.
Team Project: A Surveillant Robot System Little Red Team Chankyu Park (Michael) Seonah Lee (Sarah) Qingyuan Shi (Lisa) Chengzhou Li JunMei Li Kai Lin Functional.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter Work Day Check Robot Against Budget Work on Oral Report Work.
Step 1: Build a Planning Team
Team Project: A Surveillant Robot System Little Red Team Chankyu Park (Michel) Seonah Lee (Sarah) Qingyuan Shi (Lisa) Chengzhou Li JunMei Li Kai Lin SW.
Managing Projects and People Summary Define the scope Plan the goals, milestones and deliverables Determine each person’s realm Assign work Monitor.
Scott Drucker, Systems Engineer Migrating to Microsoft Vista with WinINSTALL.
How to use Remote Desktop and Remote Support. What is remote desktop? Remotely control your computer from another office, from home, or while traveling.
Team Project Demonstration: A Surveillant Robot System Little Red Team Chankyu Park (Michael) Seonah Lee (Sarah) Qingyuan Shi (Lisa) Chengzhou Li JunMei.
Team Project: A Surveillant Robot System Little Red Team Chankyu Park (Michael) Seonah Lee (Sarah) Qingyuan Shi (Lisa) Chengzhou Li JunMei Li Kai Lin Development.
Cisco Discovery Home and Small Business Networking Chapter 2 – Operating Systems Jeopardy Review Darren Shaver – Kubasaki High School – Okinawa, Japan.
Effective School Council Meetings School Council Forums 2009.
SERVER I SLIDE: 5. Objectie 4.2 The DHCP IP address assignment process.
Tanenbaum & Van Steen, Distributed Systems: Principles and Paradigms, 2e, (c) 2007 Prentice-Hall, Inc. All rights reserved Introduction.
REMOTE LOGIN. TEAM MEMBERS AMULYA GURURAJ 1MS07IS006 AMULYA GURURAJ 1MS07IS006 BHARGAVI C.S 1MS07IS013 BHARGAVI C.S 1MS07IS013 MEGHANA N. 1MS07IS050 MEGHANA.
Kickstart Installation
LCP SWG Meeting February 28, Proposed Agenda 2 Review Use Case/ Scenario/ User Story Structure LCC Roles and the LCP role in Use Case Development.
CEN First Lecture CEN 4010 Introduction to Software Engineering Instructor: Masoud Sadjadi
Introduction to Operating Systems CCSA 125 L.Deema ALShoaibi.
How to Use GPS to Fill Out a Bid Document February 2007.
EFFECTIVE COMMUNICATION EFFECTIVE COMMUNICATION [UWB 10202] Meeting Mdm Siti Aisyah binti Akiah.
Course 2277: Implementing, Managing, and Maintaining a Microsoft ® Windows ® Server 2003 Network Infrastructure: Network Services.
Welcome to the Minnesota SharePoint User Group August 13 th, 2008 Open Panel Discussion Wes Preston, Todd Klindt, Neil Iversen,
What is a LEGO Robotic Vehicle? Made from LEGO’s Especially “Technic” pieces Controlled by an NXT or EV3 computer Programmed by kids to do missions Not.
MICROSOFT TESTS /291/293 Fairfax County Adult Education Courses 1477/1478/1479.
Team Project: A Surveillant Robot System Little Red Team Chankyu Park (Michel) Seonah Lee (Sarah) Qingyuan Shi (Lisa) Chengzhou Li JunMei Li Kai Lin SW.
1 Working as a Team Donald Heer 10/14/09 Adapted from Terri Fiez, Director, School of EECS.
Daniel Boone HS Mr. McAdams Section Designations Period 3: Section A Period 4: Section B Period 9: Section C Period 8: Section D.
Robotics Overview Eric Kapitanski. Summary Easiest Coolest Demo Hardest Wish list Secret weapon.
Team Project: A Surveillant Robot System Little Red Team Chankyu Park (Michael) Seonah Lee (Sarah) Qingyuan Shi (Lisa) Chengzhou Li JunMei Li Kai Lin Status.
Virtual Team Project and IBM Connections WRIT 340 Prof. Walker WRIT 340 Prof. Walker.
IPEmotion License Management PM (V1.2).
機器人教學成長社群 2014/10/1 Lego EV3 Compatible Software.
Welcome to CE499: 5 th Seminar We will begin class at the top of the hour. Until then please feel free to share in conversation with your classmates.
EDU 620 Week 6 Final Project Check this A+ tutorial guideline at week-6-final-project For more classes.
GALLERIA DIAMOND JSWT AGENDA
Getting Visual Studio Go to
Team Project: A Surveillant Robot System
Printers.
HCS 370 RANK Perfect Education/ hcs370rank.com.
HCS 370 Education on your terms/snaptutorial.com.
Team Project: A Surveillant Robot System
Team Project: A Surveillant Robot System
Course: Module: Lesson # & Name Instructional Material 1 of 32 Lesson Delivery Mode: Lesson Duration: Document Name: 1. Professional Diploma in ERP Systems.
Team Project: A Surveillant Robot System
Team Project: A Surveillant Robot System
Intro. To Java Programming using Lego Mindstorms
Team Project: A Surveillant Robot System
Making Meetings More Effective A leadership training lesson from The Pennsylvania State University. *This powerpoint should be used in conjunction with.
September 2006 Registration Management Committee (RMC) Closed Meeting
Presentation transcript:

Team Project: A Surveillant Robot System Little Red Team Chankyu Park (Michael) Seonah Lee (Sarah) Qingyuan Shi (Lisa) Chengzhou Li JunMei Li Kai Lin Status Report : 03/17/2005

October 22, Agenda  Problems  Team meeting minute

October 22, Problems  Lego Mindstorms and Vision Command operates on Windows 98. But, OS of our notebook computers is Windows XP professional or Home Edition. So, We need XP patch to Mindestorms and Vision command  But test is not tried, We will try it ASAP  Basically, Lego company does not provide the communication or data transfer functionality between Vision Commander and Mindstorms  Java Communication API does not support USB communication.  We directly should implement that functionality.  On behalf of remote experiment, we need some fixed IP address not automatic IP as DHCP.  I will ask walter how to get it.

October 22, Team meeting minute - 1  When : 4:00 p.m - 5:05 p.m 03/16,Wednesday  Where : MSE cave, Participant : all  Objective : Introduce all topics related to development of robot system and level up basic understanding of our scope and development issues.  Agenda Introduction of system overview & robot package How to install mindstorms and vision command How to develop our system Introduce needed technologies, various development environments Introduction of work assignment, and the way to cooperate development Introduce basic guidelines of Robot’s behavior

October 22, Team meeting minute - 2  Decision Items MSE students take charge of one robot and volunteers also take charge of another robot. Cooperation time & place will be weekly team meeting & MSE cave. Each member at least has to invest 7 hours a week to develop the system.  Action Items Status report should be reported in weekly meeting. Environment setting and installation should be done until next week meeting To study and review needed all topics, particularly volunteers Development plan should be issued until next week