Figure 7.1 The entire process divided in several phases with documentation delivered. © 2003 Crnkovic, Asklund, Persson Dahlqvist, ”Implementing and Integrating.

Slides:



Advertisements
Similar presentations
Cultural Heritage in REGional NETworks REGNET WP2: Implementation of the System and Preparation of Services and Product Generation Structure and deliverables.
Advertisements

Cultural Heritage in REGional NETworks REGNET. REGNET Development process.
© by cellconsult.com Application Testing & Test Management.
Test Automation Success: Choosing the Right People & Process
System Construction and Implementation Objectives:
The ADDIE Model By: Elva Juarez LEARNING THEORIES.
OHT 6.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Development plan and quality plan objectives The elements of the development.
Illinois Institute of Technology
1 McGraw-Hill/Irwin Copyright © 2004, The McGraw-Hill Companies, Inc. All rights reserved. Information Systems Development – The System Approach 1. “System.
Copyright  Larry Dribin, Ph.D. SE470_EngFlows_v1.ppt SE470 EngFlows - 1 Excellence in Software Engineering Repeatable Level Defined Level Manage.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
OHT 6.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Development plan and quality plan objectives The elements of the development.
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
Asper School of Business University of Manitoba Systems Analysis & Design Instructor: Bob Travica System implementation and deployment Updated: November.
Development plan and quality plan for your Project
Miguel Nunes Information Systems Project Management IS Project Resources.
Configuration Management Process and Environment MACS Review 1 February 5th, 2010 Roland Moser PR a-RMO, February 5 th, 2010 R. Moser 1 R. Gutleber.
12.
UML - Development Process 1 Software Development Process Using UML (2)
Roles and Responsibilities
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
What is a life cycle model?
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Systems Development Life Cycle Phases and Activities in the SDLC Variations of the SDLC models.
What is a life cycle model? Framework under which a software product is going to be developed. – Defines the phases that the product under development.
Computers Are Your Future © 2006 Prentice Hall, Inc.
Figure 8.1 The eight phases of Sun’s structured process. © 2003 Crnkovic, Asklund, Persson Dahlqvist, ”Implementing and Integrating Product Data Management.
Creator: ACSession No: 16 Slide No: 1Reviewer: SS CSE300Advanced Software EngineeringFebruary 2006 (Software Quality) Configuration Management CSE300 Advanced.
Business Solutions: business rules, principles, and best practices Applications: configuration management document management product configurators collaboration.
OHT 5.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Contract review process and stages Contract review objectives Implementation.
® IBM Software Group © 2006 IBM Corporation PRJ480 Mastering the Management of Iterative Development v2 Module 6: Phase Management -Transition.
Software Costs Hardware Costs Total Costs % Figure 1.1 Software and hardware development costs in the industrial robots.
HIGH INTENSITY DRUG TRAFFICKING AREA FINANCIAL MANAGEMENT DATABASE PROJECT.
CSI-MAXIMUS, Inc CSI Comprehensive Service & Support Implementing the CSI Way.
Figure 10.1 Development process managed by AllFusion Harvest Change Manager. © 2003 Crnkovic, Asklund, Persson Dahlqvist, ”Implementing and Integrating.
Figure 5.1 Hardware development process and information usage. © 2003 Crnkovic, Asklund, Persson Dahlqvist, ”Implementing and Integrating Product Data.
Figure 9.1 Different management tools and PDM systems. © 2003 Crnkovic, Asklund, Persson Dahlqvist, ”Implementing and Integrating Product Data Management.
© 2010 Bennett, McRobb and Farmer1 Development Process Based on Chapter 5 Bennett, McRobb and Farmer Object Oriented Systems Analysis and Design Using.
Figure 6.1 PDM and SCM integration—Common API and common repositories. © 2003 Crnkovic, Asklund, Persson Dahlqvist, ”Implementing and Integrating Product.
Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System.
INFSO-RI NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, June 2009.
Figure 3.1 Basic version control. © 2003 Crnkovic, Asklund, Persson Dahlqvist, ”Implementing and Integrating Product Data Management and Software Configuration.
Distributed Software Development QR Marks The Spot Project Plan Presentation Nicolas Jacquemoud.
Windows Vista PhotoSynth Office 2007 Xbox 360 Craft PlatformTools UX.
Figure 11.1 The overlap of DMS and PDM functions. © 2003 Crnkovic, Asklund, Persson Dahlqvist, ”Implementing and Integrating Product Data Management and.
Systems Analysis and Design in a Changing World, 6th Edition
Sage ERP X3 Standard Edition Methodology
Bina Nusantara 19 C H A P T E R SYSTEM CONSTRUCTION AND IMPLEMENTATION.
Making the System Operational Implementation & Deployment
ANALISA & PERANCANGAN SISTEM Disusun Oleh : Dr. Lily Wulandari Program Pasca Sarjana Magister Sistem Informasi Universitas Gunadarma.
V-Shaped Software Development Life Cycle Model. Introduction: Variation of water fall model. Same sequence structure as water fall model. Strong emphasis.
ISIS Project Status Report May 18, 2006 Prepared by MAXIMUS, Inc Education Systems Division for the ABT Committee.
Installation and Commisioning SE view point Romuald Duperrier ESS SE manager.
Development Process Based on Chapter 5 Bennett, McRobb and Farmer
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Roles and Responsibilities
2017/18 SIP Request Process September 2016.
InGenius Connector Enterprise Microsoft Dynamics CRM
Project management assignment, Spring 2017
DOCUMENTATION DEVELOPMENT LIFE CYCLE (DDLC)
DT249/4 Information Systems Engineering Lecture 0
BAR Program Business Team & CM Workstreams
Software Development Process
Making the System Operational Implementation & Deployment
Delivery of Solutions Information Management
Project Phases ‘98 ‘00 ‘02 ‘04 ‘06 Preparatory Phase
Epic Revenue Cycle for Research
Testing Workshop.
Tasks Task #1: Operational Plan Task #2: Specification Mapping
Our Process CMSC 345, Version 1/04.
Presentation transcript:

Figure 7.1 The entire process divided in several phases with documentation delivered. © 2003 Crnkovic, Asklund, Persson Dahlqvist, ”Implementing and Integrating Product Data Management and Software Configuration Management” Evaluation process planning Tool selection Verification of the tool Deployment process analysis Identification of needs Requirements identification The processesDeliverables Requirement Specification of Process Improvements Evaluation project plan Requirements Specification Evaluation Report Project plan Other deliverables (see 7.3) Analysis report Verification report Evaluation project Tool deployment Deployment project Preparation The new tool in full use

Figure 7.2 Distribution of internal and external cotst. © 2003 Crnkovic, Asklund, Persson Dahlqvist, ”Implementing and Integrating Product Data Management and Software Configuration Management” Initial costs Year one Year two Total costs Tool A Tool B Tool A Tool B Tool A Tool B External costs Internal costs

Figure 7.3 Estimated investments and return on investment. © 2003 Crnkovic, Asklund, Persson Dahlqvist, ”Implementing and Integrating Product Data Management and Software Configuration Management” Tool A – a more advanced tool Tool B – a simpler tool Tool C – in-house developed tool Functionality Time Efforts Time Return on investment Time A B C A B C A B C t0t0 t1t1 t2t2

Figure 7.4 Graphical presentation of the fulfillment on functional requirements. © 2003 Crnkovic, Asklund, Persson Dahlqvist, ”Implementing and Integrating Product Data Management and Software Configuration Management” Adm VM CM BM ChM DD PD Int UI Gen Adm VM CM BM ChM DD PD Int UI Gen Adm VM CM BM ChM DD PD Int UI Gen Tool A Tool B Tool C Adm – Administration VM – Version Management CM – Configuration Management BM – Build Management ChM – Change Management DD – Distributed Development PD – Parallel Development Int – Interoperability UI – User Interface Gen – General

Figure 7.5 Deployment project resources and activities. © 2003 Crnkovic, Asklund, Persson Dahlqvist, ”Implementing and Integrating Product Data Management and Software Configuration Management” Resources Project Timeline RequirementsData Model development Software Development Process Implementation Project Planning Planning Data conversion and installation Training Deployment Team Core Team Training Team