Marriott Corporate Headquarters

Slides:



Advertisements
Similar presentations
BUILDING AIR CONDITIONING
Advertisements

Federal Reserve Bank of Boston Case Study
UCSD Medical Center - Hillcrest Campus Case Study Gerry White Facilities Design & Construction University of California, San Diego.
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
Save Energy and Money PNM Energy Efficiency Programs
Overview of Collected Integrated Chiller Retrofit Case Studies Dr. Lisa Gartland (510) ,
CERT UPDATE TO GUILFORD COUNTY ENERGY AUDITS OF BELLE MEADE BUILDING BB&T BUILDING HIGH POINT COURTHOUSE & DETENTION CENTER HIGH POINT PUBLIC HEALTH BUILDING.
Learning Outcomes Upon completion of this training one should be able to: Identify open loop and closed loop campus-type hydronic water system applications.
King Fahd University of Petroleum and Minerals Mechanical Engineering Department Presented by Mohammad A. Al-Muaigel /10/2004 National Energy.
Partnership Gwinnett + Southeast Green Series- Debunking Energy Efficiency Myths: Why your bottom line depends on Energy Efficiency Property of VIS VIVA.
UTPA Energy Conservation Initiatives Oscar Villarreal Director, Facilities Management David Ortega Assistant Director, Energy Manager.
Smart Devices. Smart Buildings. Smart Business The Potential for DCx Technology Enabled HVAC Operation Scot Duncan, P.E.
Using Benchmarking to Identify Energy Efficiency Opportunity in Cleanrooms; The Labs 21 Approach William Tschudi and Peter Rumsey June 29, 2004
Branford Board of Education Conservation Report Efforts and Results 2001-Present Mark Deming Facilities Director Branford Board of Education November 19,
Denver Place North & South Towers Case Study Matt Urquhart Amerimar Realty Management Company Jack Wolpert E-Cube, Incorporated.
Worcester Polytechnic Institute Gordon Library and Fuller Laboratory B.N. Tripathi Senior Vice President CES/Way.
Energy Efficient Heating and Cooling Systems For Today Geothermal Heating, Cooing And Hot Water Systems.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Industrial Heating & Piping Co. Madawaska School Department Energy upgrades to the heating system at the Madawaska High and Middle School.
Franklin County Technical School Performance Contract Project.
Integrated Retrofits for Federal Projects Dr. Lisa Gartland.
FACILITIES AND PROPERTY MANAGEMENT – BEMS Plant and Equipment Operating Hours.
The Role of Tenant and Property Operations in Implementing Sustainable Practices Public Building Services October. 17, 2007 Om Taneja PBS Tenant and Property.
Jim Chmielewski – HVAC Sales Manager Emerson Control Techniques
Coppin State University Physical Education Complex Kaylee Damico – Mechanical Option April 12 th, 2011 Presentation Outline Project Team Project Overview.
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
PROJECT STARTED WITH V.P. OF BUSSINESS & FINANCE BOE LOOKED AT ENTIRE FREDERICKSBURG CAMPUS FOR POTENTIAL ENERGY CONVERVATION PROJECTS. 8 ENENRGY CONSERVATION.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Charles F. Hurley Building Case Study B.J. Mohammadipour Bureau of State Office Buildings.
Oklahoma City Community College Strategic Planning Approach Cuts Cost….Improves the Learning Environment Smart and Sustainable Campuses Conference Monday,
Utility Rebates Services and Funding to Help Build “Green” Restaurants and Hospitality Facilities Tom Coughlin Program Manager.
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
UAF research leads to inventions Invention Disclosures by Year.
Who Says Energy Efficiency Can’t be Sexy? About Us Energy + Environment  Since 1999  Decades of experience in energy efficiency  We create jobs, lower.
Energy Conservation Western North Carolina Recycler’s Networking Council Black Mountain, North Carolina December 9, 2004 Keyes McGee, E.I. North Carolina.
Green Building Demonstration Project Adam Saling City of San Diego.
Lawrence Livermore National Laboratory Building 111 Mike Holda Lawrence Berkeley National Laboratory (510) or (209) ,
Building Technologies Energy and Infrastructure Upgrade Program Utilizing National Grid Incentives Rensselaer County Office Building.
1 Medical Office Building. 2 Occupancy – 400 persons 8 a.m. – 5 p.m. Monday - Friday Building Characteristics Three stories 40,000 square feet (200’ x.
Cheri Cousens, P.E. – Executive Director September 15, 2010.
Managing Energy Consumption ENERGY SAVING IS ONLY GOOD IF IT SAVES YOU MONEY. ENERGY SAVING IS BETTER IF IT MAKES YOU MONEY.
Building Simulation. BMEABMEA uilding odeling nergy nalysis.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Introduction to Integrated Chiller Retrofits Dr. Lisa Gartland (510) ,
Name of Building(s) or Project Speaker(s) Organization(s)
November 2004 Low Hanging Fruit Low Cost Energy Efficiency Opportunities in Cleanrooms.
Energy Conservation Initiatives Joan Kowal Energy Manager, UMCP May 1, 2008.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
Energy and Air Quality Conference April 5, 2004 Innovative financing, support, and solutions for Implementing Energy Projects.
Whitman-Hanson Regional High School Energy Efficient Systems: HVAC All fans and pumps are VFD controlled with fully reactive controls Condensing gas-fired.
Background Information The United States uses a lot of energy – nearly a million dollars worth of energy every minute, 24 hours a day, every day of the.
Introduction to Energy Management Doty, Steve & Turner, Wayne. (2009). Energy Management Handbook. Lilburn, GA: The Fairmount Press. Jacobsen, J. (2011).
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
1 Hospital Building and Campus Piping. 2 Hospital Building Occupancy – office and patient areas Patient areas: 24 hours per day Office areas: 8 am – 5.
Kansas City International Airport Michael Glasker, P.E. George Butler Associates, Inc.
Advanced Energy Engineering Technology Modeling Building Energy Systems Session 9: Modeling heating and cooling systems.
Thermal Energy Storage Thermal energy storage (TES) systems heat or cool a storage medium and then use that hot or cold medium for heat transfer at a later.
Hawaiienergy.com Graceson Ghen. hawaiienergy.com  Hawaii’s energy conservation and efficiency program  Administered by Leidos Engineering, LLC under.
Energy Conservation Building Upgrades Alma School District.
Teach your Old Building New Tricks Carbon Lighthouse Profitable Carbon Neutral Buildings: A Palo Alto Case study Emma Bassein Palo Alto Utilities Facility.
1 December 8 th, 2010 CoreNet Global New York City Chapter Cutting edge energy practices for the Corporate end user Time Warner Real Estate & Facilities.
Changes for 2016 Moving Forward! 2016 ECM Fan Box Bright Energy Solutions! LED High Bay! Chillers! Ready for 2016.
Sustainability Best Practices
Lecture Objectives: Discuss Final Project
Energy Savings Projects
Energy Incentive Programs
INNOVATION lab MEP MECHANICAL/ELECTRICAL/PLUMBING :
Michigan Energy Summit | April 25, 2019
Presentation transcript:

Marriott Corporate Headquarters John Henderson Marriott Corporation

Marriott Headquarters 1977 construction of ~700,000 square feet 1986 addition of ~300,000 square feet 8 floors including basement Office space operates 7 am to 6:30 pm Many areas at ~10% operation 24 hours a day, 7 days a week

Marriott Headquarters HVAC & Lighting Equipment in 1989 One 900 ton & one 750 ton electric centrifugal R-11 refrigerant, 0.86 & 0.92 kW/ton efficiencies installed in 1977 with original building construction Two 450 ton chillers, 0.62 kW/ton, R-11, circa 1986 Two 1000 ton cooling towers Two 350 horsepower gas boilers, 175°F hot water ~12,000 fluorescent fixtures, two 40 watt U-tubes each ~1800 assorted incandescent lamps & spots

Marriott Headquarters Project Scenario boiler room Virtually no maintenance since 1977 Half of plant didn’t work Parts leaked, made noise Not meeting safety requirements Not providing building comfort

Marriott Headquarters “Before” Pictures air handler unit sample motor

Marriott Headquarters Project Challenges Everything needed attention at once Large budget for the wrong things Set strenuous daily goals Conserved energy wherever possible Considered many new systems Most work and analysis done in-house

Marriott Headquarters System Solutions Short term, through 1994 cleaned up boiler room rehabbed equipment - motors, boilers, piping, air handlers, etc. converted all chillers to R-123 increased cooling tower capacities to 1200 tons added heat exchanger for free cooling put electronic ballasts in lighting fixtures

Marriott Headquarters System Solutions Long term, 1994 until today two new traditional chillers, an ice chiller and a gas/oil absorber redesigned chilled water piping for more effective primary/secondary loops added window films extensive rebalancing of air handlers new motors added new control system added

Marriott Headquarters Variety of New Chillers One 670 ton electric centrifugal chiller replaced 900 ton chiller 0.53 kW/ton efficiency, R-123 refrigerant One 530 ton combination gas/oil-fueled absorber replaces 750 ton chiller, used for peak shaving

Marriott Headquarters Variety of New Chillers One ice chiller and storage system converted from 450 ton chiller 2400 tons of ice, or 350 tons of regular cooling, 0.68 kW/ton efficiency, R-123 refrigerant One 400 ton electric centrifugal chiller replaced 450 ton chiller 0.53 kW/ton efficiency, R-123 refrigerant Total of 1950 tons of total cooling capacity, versus 2550 tons previously ice chiller ice tank

Marriott Headquarters Free Cooling Condenser water from cooling towers can bypass the chillers Cooling towers have variable frequency drives Up to 500 tons of cooling provided Used during mild weather in spring and fall

Marriott Headquarters Cooling Load Reductions Replaced magnetic ballasts of fluorescent lighting with electronic ballasts Added tinted films to windows - block sunlight to reduce solar heat gain Complete balancing of air distribution system, including exhaust system EnergyStar printers - used sleep mode to reduce energy use

Marriott Headquarters Cooling System Improvements Just finished adding new motors to air handlers efficiency improved from 87-89% to 94-95% New EMS system Andover 1986 model combined with 1994 model computerized control, and help deciding what systems to run when

Marriott Headquarters Project Timeline New facility management in 1989 Plant clean-up began right away and took 18 months Plant retrofit work began in 1991 Lighting work in 1992 Window work & AHU balancing in 1994 New chillers installed in 1994 1 year of construction New AHU motors added in 1998

Marriott Headquarters Financing Structure Won 1st place ENCOMP award in 1992 for large buildings - got us noticed $1 million from Maryland Public Service Commission through Washington Gas paid for gas absorber $1 million rebate from Pepco replaced one chiller, lighting retrofits, added window films Sold one 450 ton R-123 chiller Saved money by using in-house labor Used almost no cash to finance the project

Marriott Headquarters “After” Pictures boiler room today color coded piping

Marriott Headquarters Project Results Safe, clean, highly efficient plant Remarkable system innovation & flexibility Reduced peak cooling capacity Much improved tenant/building comfort No longer using CFC refrigerants first CFC conversion to R-123 Saving 1.8 MWhrs of electricity per year