201 MHz Cavity Status and Test Plans at MTA MICE Collaboration Meeting at RAL, UK October 22 ~ 24, 2005 Derun Li Center for Beam Physics Lawrence Berkeley.

Slides:



Advertisements
Similar presentations
MICE RF Cavities and RFCC Module Update Derun Li Lawrence Berkeley National Laboratory MICE RF Workshop Daresbury Laboratory, UK April 17, 2012 April 17,
Advertisements

RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
MICE RF Cavity Measurements Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory March 26, 2010 University of California, Riverside,
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Status of 201 MHz Prototype Cavity and Curved Be Windows Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting.
201 MHz Cavity Studies Derun Li Lawrence Berkeley National Laboratory MuCool RF Workshop (Fermilab) July 7 and 8, 2009.
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
Proposed Button Design for a Series of High Power Button Tests Arash Zarrebini-Esfahani 22 nd August 2007.
D. Li and R. Rimmer, RF Workshop, Fermilab, MHz Cavity Refurbishment and suggestions on future tests Derun Li and Robert Rimmer* Lawrence.
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
Report from RF Session (1:30-5:40 PM, 3/30/2004) H. Haseroth and Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration.
201 MHz NC RF Cavity R&D Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory WG3 at NuFact 2004 July 28, 2004.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
201-MHz NCRF Cavity Program Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MUTAC Review at Fermilab March 16, 2006.
Status of the MuCool Cavity Prototype Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 21, 2005.
RF Cavity / Coupling Coil Module
Allan DeMello Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008 RFCC Module and Subcomponents Mechanical Design.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
Single-Cavity Module Installation at MuCool Test Area Yağmur Torun MICE Collaboration Meeting February 15, 2013.
Status of 325MHz coupler S. Kazakov 11/29/ MHz coupler structure.
NCRF R&D Programs and Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MUTAC Review at BNL April 28, 2004.
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
MUCOOL RF Program Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MUTAC Review at BNL April 18, 2007.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
201 MHz NC RF Cavity R&D for Muon Cooling Channels
RFCC Module Design Update  automatic tuners  cavity suspension  cavity installation Steve Virostek Lawrence Berkeley National Lab MICE Collaboration.
201-MHz RF Cavity Construction (Plan) for MICE Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory NFMCC Meeting March 17, 2008.
MICE RFCC Module Derun Li Lawrence Berkeley National Laboratory MICE Schedule Review RAL, UK May 24, 2011 May 24, 2011.
Normal Conducting RF Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory March 5-6, 2013.
201 MHz Cavity Fabrication Update Derun Li Lawrence Berkeley National Lab MICE CM24 at RAL, UK June 1, 2009.
1.3GHz Input Coupler for ILC
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Summary of the RF Parallel Session Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting 18 June 16, 2007.
MICE RFCC Module Status Derun Li Lawrence Berkeley National Lab NFMCC-MCTF Collaboration Meeting LBNL, Berkeley, CA January 25, 2009.
MICE RF Cavities and RFCC Module Update Allan DeMello and Derun Li Lawrence Berkeley National Laboratory MICE CM32 at RAL, UK February 9, 2012 February.
1 Al Moretti, APC, Fermilab MAP- Winter Meeting February 28 - March 4, 2011 TJNAF Newport News, VA.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
MICE RF Cavity Measurements Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory July 8, 2010 Rutherford Appleton Laboratory, UK.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
Update on 201-MHz RF Cavity Construction (Plan) for MICE
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM25 at RAL, UK November 6, 2009.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
Progress on MICE RFCC Module for the MICE Experiment * Allan DeMello, Nord Andresen, Michael Green, Derun Li, Heng Pan, Steve Virostek, Michael Zisman.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
Power couplers Timergali Khabiboulline (FNAL) FNAL-LBNL meeting on NGLS April 13, 2012.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
RFCC Engineering Status and Plans Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Meeting March 6, 2012 March 6, 2012.
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
Fabrication of Remaining Components Allan DeMello Lawrence Berkeley National Laboratory MICE RF Workshop Fermilab June 2, 2014.
704 MHz cavity design based on 704MHZ_v7.stp C. Pai
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
RF R&D (Issues) for Muon Ionization Cooling Channels
Completion of the MICE-US construction project
Overview of the RFCC Module and 201-MHz Cavity Design
Presentation transcript:

201 MHz Cavity Status and Test Plans at MTA MICE Collaboration Meeting at RAL, UK October 22 ~ 24, 2005 Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory

MICE Collaboration Meeting at RAL October 22 ~ 24, MHz Cavity Status Derun Li Center for Beam Physics LBNL Page 2 Cavity Last Meeting MICE Collaboration meeting last June at NuFact-2005 in Frascati  Cavity fabrication: in collaboration with J-Lab, University of Mississippi, Oxford University  Cavity parts fabrication at Mississippi; e-beam welding, EP and cleaning at J-Lab  Power couplers: assembly and high power tests at SNS  Vacuum assembly and tests at J-Lab, …, shipping  Curved Be windows: in collaboration with Oxford University  In MTA, FNAL  Preparation for accepting the cavity: installation, baking, vacuum, RF transmission lines, …  Cleaning room purchased and will allow us for in situ assembly of  Couplers  Window replacement  Inspection of cavity  Low power measurement: frequency and coupling

MICE Collaboration Meeting at RAL October 22 ~ 24, MHz Cavity Status Derun Li Center for Beam Physics LBNL Page 3 Cavity Progress Since Last MICE Meeting Cavity fabrication: in collaboration with J-Lab, University of Mississippi, Oxford University Cavity parts fabrication at Mississippi; e-beam welding, EPs and cleaning at J-Lab Power couplers: assembly and high power tests at SNS Vacuum assembly and tests at J-Lab, …, shipping Curved Be windows: in collaboration with Oxford University: three curved Be windows, one with Ti-N coating Cavity shipped in early September, and now at MTA FNAL Strong supports and helps from FNAL: Preparation for accepting the cavity: installation, baking, vacuum, RF transmission lines, … Cleaning room was ready for in situ assembly of Couplers Window replacement Inspection of cavity Cavity installation Vacuum leak tight Low power measurement: frequency and coupling

MICE Collaboration Meeting at RAL October 22 ~ 24, MHz Cavity Status Derun Li Center for Beam Physics LBNL Page 4 Final interior buffing of cavity is performed to ensure the surfaces are ready for electropolishing Less buffing needed near equator where fields are lower An automated process of buffing was developed using a rotary buffing wheel and a cavity rotation fixture Some local hand work required to clean up some areas A series of pads with graduated coarseness was used Goal was scratch depth shallow enough for EP removal Final Interior Buffing

MICE Collaboration Meeting at RAL October 22 ~ 24, MHz Cavity Status Derun Li Center for Beam Physics LBNL Page 5 After buffing, cavity underwent a chemical cleaning process Test bars with various degrees of buffing were run through an electropolish process Cavity was rotated with a U-shaped electrode fixed in place Initial polish failed due to depletion of the solution, and rebuffing was required 2nd EP successfully removed scratches in high field regions Final process is a high pressure water rinse of cavity surface Interior Surface Electropolish

MICE Collaboration Meeting at RAL October 22 ~ 24, MHz Cavity Status Derun Li Center for Beam Physics LBNL Page 6 Coupling loops were fabricated using standard copper co-ax Most coupler parts were joined by torch brazing – vacuum leaks were found in two of the outer conductor joints Coupling loop contains an integrated cooling tube The coupler was designed to mate with an SNS style RF window manufactured by Toshiba High power conditioning performed at SNS (ORNL) The MICE coupler will require a bellows connection interface with the outer vacuum vessel ports Cavity RF Couplers

MICE Collaboration Meeting at RAL October 22 ~ 24, MHz Cavity Status Derun Li Center for Beam Physics LBNL Page 7 Shipment to the MTA at FNAL System assembly included: tuner plates, port blank-offs, diagnostic spool, window cover plates, gate valve and window pump-out tubes Final leak check conducted prior to shipping Cavity was back-filled with nitrogen in its assembled state and packaged in a custom made crate for shipping to the MTA

MICE Collaboration Meeting at RAL October 22 ~ 24, MHz Cavity Status Derun Li Center for Beam Physics LBNL Page 8 Final Assembly at the MTA Cavity assembly was mounted on the support and couplers were installed in a portable clean room Dummy copper windows (flat) are used initially Couplers were set and frequency was measured Bakeout system hardware was installed System is now leak tight and ready for bake

MICE Collaboration Meeting at RAL October 22 ~ 24, MHz Cavity Status Derun Li Center for Beam Physics LBNL Page 9 Cavity Installation at MTA

MICE Collaboration Meeting at RAL October 22 ~ 24, MHz Cavity Status Derun Li Center for Beam Physics LBNL Page 10 Cavity Installation at MTA

MICE Collaboration Meeting at RAL October 22 ~ 24, MHz Cavity Status Derun Li Center for Beam Physics LBNL Page 11 Cavity Inspection Iris Area Couplers

MICE Collaboration Meeting at RAL October 22 ~ 24, MHz Cavity Status Derun Li Center for Beam Physics LBNL Page 12 Last Low Power Measurements E-beam welding Ports Water cooling lines Couplers assembled first time (mid-April-2005) First low power measurement frequency ~ MHz coupling ~ 5 (max) Q ~ 5000

MICE Collaboration Meeting at RAL October 22 ~ 24, MHz Cavity Status Derun Li Center for Beam Physics LBNL Page 13 Low Power Measurements f = MHz Q 0 = 49,000 ~ 51,000 Better than 90% of design value Two couplers balanced coupling adjustments

MICE Collaboration Meeting at RAL October 22 ~ 24, MHz Cavity Status Derun Li Center for Beam Physics LBNL Page 14 Tuner Measurements Mechanical tuning plates at four locations Dial indicators to measure displacement between Al plates Tuning measurement in air –Equivalent to MICE cavity under vacuum Adjusted up to 2-mm with 8 steps of 0.25-mm each Measured tuner sensitivity –~ 78 kHz/mm Calculated tuner sensitivity –115 kHz/mm –Disagreements may be due to deflection of the Al plates

MICE Collaboration Meeting at RAL October 22 ~ 24, MHz Cavity Status Derun Li Center for Beam Physics LBNL Page 15 Curved Be windows Each cavity will require a pair of 0.38 mm thick pre- curved beryllium windows with Ti-N coating Double-curved shape prevents buckling caused by thermal expansion due to RF heating Thermally induced deflections are predictable A die is applied at high temperature to form window Copper frames are brazed to beryllium windows in a subsequent process

MICE Collaboration Meeting at RAL October 22 ~ 24, MHz Cavity Status Derun Li Center for Beam Physics LBNL Page 16 RF Power Two couplers Load Two Couplers ─ Critical coupling ─ Ceramic windows are integrated in the couplers ─ Design and built at LBNL ─ Conditioning started using 805 MHz RF power at the SNS ─ Good vacuum ~ low T ─ Achieved 600 kW in TW mode (matched load) ─ Achieved 10 kW average power (~ 9 kW average for nominal NF parameters) ─ Achieved 2.4 MW peak power in SW mode (at variable short positions) ─ Ceramic windows work fine during two weeks of the RF conditioning ─ Shipped to MTA for final assembly Couplers Tests at SNS

MICE Collaboration Meeting at RAL October 22 ~ 24, MHz Cavity Status Derun Li Center for Beam Physics LBNL Page 17 Bake-out and Vacuum Hot water bake-out system installed at MTA –Safety –Control and operation Electric heating system Two vacuum leaks found before and after bake-out –Bottom port –Top port Vacuum leaks fixed and now cavity is leak tight –3.3x10 -8 Torr at latest Two RF probes calibrated –-55, -54 dB (at maximum) Pumping time (hours) Vacuum (Torr)

MICE Collaboration Meeting at RAL October 22 ~ 24, MHz Cavity Status Derun Li Center for Beam Physics LBNL Page 18 High Power Test at MTA Plans underway –Coordination among LBNL, FNAL, J-Lab and ANL >Weekly video meetings >MUCOOL Friday meetings –Diagnostics (RF probes, dark current, x-ray, vacuum, … ) –Near term plan >Purchase high power RF components –Power splitter (matched Tee) at 6” coaxial transmission line –Transitions to 4” coaxial lines with elbows to the couplers –Directional couplers –High power test plans being developed >Expect to have RF power (up to ~ 5 MW) in 6 ~ 8 weeks >Test with Ti-N coated flat copper windows (installed) first –Double check coupling balance and adjustment before high power –Double check calibration of RF probes >Conditioning without magnetic field first –Combinations of short pulse and high RF powers >Curved Be windows + magnetic fields later –Suggestions are always very welcome

MICE Collaboration Meeting at RAL October 22 ~ 24, MHz Cavity Status Derun Li Center for Beam Physics LBNL Page 19 Summary Cavity assembly at MTA, FNAL is complete –Cavity is vacuum leak tight, now at ~ 3.3x10 -8 Torr –More RF components need to be ordered –Two couplers have been balanced and adjusted –Two RF probes calibrated Curved Be windows with Ti-N coatings (one is ready now, two are underway) will be ready for high power tests High power test plans being developed Problems we had with cavity ports are not an issue for MICE