1 Gates Center Faculty Meeting: Nov. 3, 2004. 2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about.

Slides:



Advertisements
Similar presentations
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Advertisements

WHEELOCK COLLEGE CAMPUS CENTER AND STUDENT RESIDENCE schematic lighting design anne k cheney lighting | electrical option advisor : dr. kevin houser courtesy.
Bond Program Planning Imperatives Study Session October 12, 2004.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1.
Let’s Celebrate! University of Waterloo Library Wednesday, October 12, 2005 DC 1302.
N EXISTING FACILITIES BUILDING “A” -Principal’s Office -Workroom -(9) 3 RD Grade Classrooms - (4) 4 TH Grade Classrooms -Life Skills Classroom -Title.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District August 8, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Information Technology Development Center FLAGLER COUNTY FLORIDA ENGAGING IN THE WORLD WIDE ECONOMY.
Campus Planning & Development Project Overview and Campus Update.
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
THOMAS MEMORIAL LIBRARY A NEW VISION FOR THE “LIGHTHOUSE OF KNOWLEDGE”
The HIT Innovation Hub WP5 of Tempus IDEA. Basic Requirements Wide concept Interdisciplinary Serves Engineering, Design, Sciences and MOT disciplines.
I.The Building/Remodeling/ Renovating Project NSSED North Shore Academy (NSA) and Administration Office Building/Remodeling/Renovating Project.
Engineering center oakland university lighting schematic initial design development presentation JOHNCONLEY.
Additions and Renovations to: Horace Mann School Additions and Renovations to: Horace Mann School Additions and Renovations to: Horace Mann School.
Bond Proposal May 12,  I.E.Clark Fine Arts Center – Problem – Consistent separation of walls and foundation over the years. Summary – The Fine.
From Vision to Construction: Building Fund Raising Success ALADN Conference March 24, 2003.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 14, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Finance and Administration Advisory Group June 30, 2010.
J C Charyk Hanna School: Modernization. Timelines To Project Completion The timelines shared are proposed to date and may change slightly as the project.
Phase 1 Existing SCIE I Existing SCIE II Upton Hall.
Admit Day Schedule Welcome and Overview (12:25-12:35)  Geoff Voelker, Asst. Prof. Questions and Answers (1:05-1:30)  Pat Raczka, CSE Undergrad.
The Future of the Library As Place – or No Place
An Information Commons for Graduate Social Science Students Digital Social Science Center: an Information Commons for Graduate Social Science Students.
Understanding House Plans
Chapter 1 Professional Architectural Careers, Office Practices, and Opportunities.
APRIL 2, Superintendent proposes to consider construction of new administration building to Board May 2010 Board gives approval to begin search.
Athabasca Hall - The University's First Building Part V: Computing Science Centre and Athabasca Hall Renovations:
After studying this unit, you will be able to: Interpret architectural drawings Describe how computers can assist in understanding house plans Organize.
FRANCIS MARION UNIVERSITY Report to the Commission on Higher Education I.Priorities & Plans for II.Budget Requests III.Capital Bond.
Hawthorne Hall – LEVEL 1 EXISTING. PROPOSED Hawthorne Hall – LEVEL 1.
An Alternative Proposal to Save St. Paul’s Presented to the Garden City Board of Trustees By the Committee to Save St. Paul’s & The Garden City Historical.
Universities and Centers: U.S. examples Susan E. Cozzens Technology Policy and Assessment Center Georgia Institute of Technology Atlanta, GA.
National Lab Day and the MSP Program Jan Cuny National Science Foundation National Lab Day 1/13/09 National Lab Day and the MSP Program NLD Video Jan Cuny.
ARCH – 4601 Architecture Firm Presentation Popham Walter Architects Jason B. Ashe.
Facility Design. Overall Design Process Planning committee Needs assessment Select construction process model Select architect Develop schematics Secure.
University of Georgia Foundation University Council Presentation December 2, 2004.
Shireen Abdelrahman Architecture Orientation to Engineering course.
*28. October, 1955 †  Own name William Henry Gates III.  Is currently the second richest man (60 billion USD)  Co-founder of.
Board of Trustees Meeting November 20,  On May 15, 2012 Board of Trustees authorized Administration to pursue a feasibility study and cost analysis.
A New Library Commons: Connecting to the Campus at Kalamazoo College Summer 2004 – January 2006 Kalamazoo Rotary March 29, 2004.
1 SCS Building Committee. 2 The SCS Building Committee Members: Guy Blelloch Randy Bryant Sharon Burks Peter Lee Jim Skees Manuela Veloso.
Results from the 2005 Educational Technology Surveys Cara Lane Research Scientist Catalyst Research and Development Office of Learning Technologies.
Chapter 46 Commercial Construction Projects. 2 Links for Chapter 46 Types of Drawings Floor Plans Elevations Site Plans.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District October 24, 2011 EDUCATE  ENGAGE  EMPOWER 1.
If we build it… Creating and using a flexible teaching and learning space Jennifer Thiessen & Carol Wu Brock University Ontario Library Association Super.
Classrooms of the Future: Education Building Renovation/Addition.
Inventor of microsoft. Bill gates was born on the 28 th of October He is worth almost 82 billion dollars! He along with Paul Allen invented the.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 26, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Client Senior Design Electrical and Computer Engineering Iowa State University Introduction Abstract Architectural plans are currently being developed.
1 Gates Center Faculty Lunch: Jan. 19, Outline Location, Size and Massing Architect Selection/Timeline The Interior Space : What do we want?
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 14, 2011 EDUCATE  ENGAGE  EMPOWER 1.
NORTH 40 SPECIFIC PLAN Advisory Committee Meeting #6 November 3, 2011.
State of the School Presentation Monday, March 21, 2011 Monday, March 21, 2011.
DLS Town Hall. Facilties and Transportation Update History Current Status Near Term and Medium Term Projects Questions & Answers.
The Life of Bill Gates. The Early Years William Henry Gates III William Henry Gates III Born October 28, 1955 in Seattle Washington Born October 28, 1955.
Justice Planners and Designers 212 North 25 th Street, Milwaukee, Wisconsin / Door County Architectural and Engineering.
Senate Meeting Summary
Cambrian School District March 19, 2015
Fun Facts: James M. Bennett High School
William Henry Gates III Bill Gates October 28, 1955.
SSU BUDGET 101 Financial Briefing Sonoma State University
ADDITION AND MODERNIZATION
Virginia Tech Graduate Program in Computer Science
Commercial Construction Projects
2007 Bond Issue Capital Improvement Program
House Construction Budget Plan
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
250 Catalonia Building Remarks:
The University of Tennessee at
Presentation transcript:

1 Gates Center Faculty Meeting: Nov. 3, 2004

2 Outline Preliminary designs Process/Timeline Other buildings What we need to think about

3 Preliminary Designs Almost nothing set in stone Just to give you a sense of the range of possibilities Bowlin Cywinsky and Jackson (BCJ) were the architects. BCJ did Bill Gate’s house, UCSD CS building, UIUC CS building, Pixar Headquarters Not necessarily final architect

4 Design I

5

6 Design II

7

8 Design III

9

10 Proposed Costs ($50M total) $33M building construction $220/sqft * 150,000sqft $3M underground parking (150 $3M architect $2M landscaping development $2M Project management $2M Furnishing $5M Other (demolition, …)

11 Proposed Sources $20M Gates Foundation $8M Other gifts (fundaraising) Remaining : Financing (Public Bonds)

12 Process Warner Hall picks construction management company (DONE, Oxford) University committee selects architect (representatives from SCS, FMS, (DRC) Design Review Committee., Warner Hall, trustees) Architects works with us on design (especially the interior). Also can bring in consultants on particular aspects (e.g. lighting, wireless). Many levels of design.

13 Process II Different parts are put out for bid (concrete, electricity, heating, Construction starts…we have to be diligent about quality…many decisions have to made on the fly.

14 Timeline Jan 05Jan 06Jan 07Jan 08Jan 09 architect selected schematic design construction docs groundbreaking completion our input into the design fundraising

15 Process within SCS Small committee Guy Blelloch Sharon Burks Peter Lee Manuela Veloso ??? Randy Bryant + Jim Skees (Ex.officio) Everyone is encouraged to give input.

16 Other recent CS buildings Stata Center, MIT (2004) Allen Center, UW (2003) Seibel Center, UIUC (2004) EBU3B, UCSD ( ) ACES building, UT Austin (2001) Klaus building, Georgia Tech (2006) Maxwell-Dworkin, Harvard (1999)

17 Space: 420K sqft (+ 280K garage) Cost: $350 Million (approximately) Architect: Frank Gehry Major Donors: $25M Ray Stata, $15M Alexander Dreyfoos, $20M William Gates MIT Ray and Maria Stata Center

18

19

20

21

22

23

24

25 The Paul G. Allen Center for Computer Science & Engineering Space: 168K + 22K sqft Cost: $72M Architect: LMN Architects (local) Major donations: $7.2M Microsoft, $14M Paul Allen, $6.5M Bill and Melinda Gates Foundation, 7 other $1M+ gifts

26

27

28

29

30

31 A great opportunity to rethink how we organize ourselves Need to open our minds What would improve your quality of life What is most important to us The devil is in the details

32 Issues How to organize research groups students mixed with faculty or separate students with their faculty groups are localized How to organize labs individual or group labs people in labs, or just equipment labs next to faculty

33 Issues II Types of common spaces informal sitting areas reading room food services/café atrium Connectivity and traffic flow bridge to NSH? bridge to cut?

34 Issues III Privacy vs. Openness glass windows on labs glass windows on offices open space desks (students, staff?) Boldness of architecture vanilla functional building make a statement about SCS

35 Issues IV What space gets windows offices, conference rooms, common spaces Number and sizes of conference rooms 7220 (500sqft) 4623 (900sqft) Classroom space Any special teaching labs? Any special classrooms?

36 Issues V Office space for undergraduates Office sizes for graduate students 3 students, 4, 5, ? Noise Individual heat/air control Opening windows