Signals from ISTP-001 April 11-13, 2005 Preliminary Assessment C Neumeyer.

Slides:



Advertisements
Similar presentations
Roger C. Ellis ECE Mechatronics Assignment #1.
Advertisements

Measuring Cosmic Ray Flux with a trigger and CAMAC readout - Page 1 Connect the Fluke 415 HV supply output to the input of the voltage distribution box.
Cooling Channel Count Recap Cooling channel components # Engineering? Absorber: temperature 8*3 yes pressure 2*3 yes He temp 2*3 level 8*3 yes length (optical)
Cable Channel tests ____________________________________________________________ 17/Apr/07 Pisa Group Four configurations of insulation has been tested.
NSTX TF Flag Joint Review ANALYSIS & DESIGN C Neumeyer 9/3/3.
MUTAC Review, 9 April MuCOOL and MICE Coupling Magnet Status Michael A. Green Lawrence Berkeley Laboratory Berkeley CA
AERSP 301 Shear of beams (Open Cross-section)
NSTX Center Stack Upgrade Workshop Brainstorming on Design Solutions for TF Joint C Neumeyer Jan 22, 2009.
MICE LH2 Absorber Instrumentation - What is necessary/ desirable? (physics calibration) Temperature inside the the absorber Temperature inside the absorber.
Spectrometer Solenoid Lead Testing Update S. Virostek and Mike Zisman Lawrence Berkeley National Lab MICO Meeting January 19, 2010.
Fasteners / Joint Design Michael Kalish NSTX TF FLAG JOINT REVIEW 4/10/03.
ENGINEERING APPLICATIONS Telecommunication Long Distance Communication Handle large number of channels Signalling purposes Computer Networks Connecting.
TF Joint Voltage Drop Instrumentation Robert Marsala (609) Hans Schneider (609) Engineering Operations August 7, 2003 TF_JOINT_Final_Design_Review.ppt.
Linac Test Area Instrumentation Update M. Haney, D. Errede, Z. Conway University of Illinois at Urbana-Champaign 14 June 2002.
Sensors are mostly electronic devices used to monitor or capture something.
Introduction to Engineering Lab 4 – 1 Basic Data Systems & Circuit Prototyping Agenda REVIEW OF LAB 3 RESULTS DEFINE a DATA SYSTEM  MAJOR TYPES  ELEMENTS.
Profile Measurement of HSX Plasma Using Thomson Scattering K. Zhai, F.S.B. Anderson, J. Canik, K. Likin, K. J. Willis, D.T. Anderson, HSX Plasma Laboratory,
NA62 GigaTracKer Working Group meeting Integration and GTK-carrier PCB design April 9, 2013 Michel Morel.
Proposed TF Joint Design C Neumeyer 2/26/9 Notes: 1)Several concepts included are based on ideas developed by R Woolley 2)No analysis has yet been performed.
Measurement of Pressure Distribution and Lift for an Airfoil  Purpose  Test design  Measurement system and Procedures  Instrumentation  Data reduction.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
NSTX TF Flag Joint Design Review INTRODUCTION C Neumeyer 8/7/3.
NSTX CSU Preliminary Assessment of PFCs Art Brooks December 8,
NSTX TF Flag Joint Design Review OVERVIEW C Neumeyer 8/7/3.
 Purpose  Test design  Measurement system and Procedures  Uncertainty Analysis.
Well Monitoring Hot Geothermal Wells Pressure, Temperature Tool based on High Temperature Electronics Developed for Commercial Aircraft Engine Control.
ARIES AT Project Meeting - Princeton, NJ 18 Sept 00 1 ARIES-AT Toroidal Field (TF) and Poloidal Field (PF) Coils Tom Brown, Fred Dahlgren, Phil Heitzenroeder.
Transient Thermal Analysis Winter Semester
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
Flows, Turbulence, and the Edge Plasma in NSTX C.E. Bush, S. Zweben, R. Maqueda, W. Davis, D. Johnson, R. Kaita, H. Kugel, L. Roquemore, G. Wurden and.
NSTXU-CALC TF Flex Joint and TF Bundle Stub
November 18, 2002Richard Talaga1 Target Hall Instrumentation NuMI Neutrino Beam Devices Instrumentation Review Instrumentation &Communication Overview.
NSTX dynamic structural responses to disruptions could be measured by expanding the existing TFJ_FISO system R. Woolley 13 January 2010.
Failure of Original TF Inner Leg Assembly C Neumeyer 4/10/3.
1 NSTX Upgrade Progress Report May 7 th, 2013 Ron Strykowsky, Erik Perry, Tim Stevenson, Larry Dudek, Steve Langish, Tom Egebo, Mike Williams and the NSTXU.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
TF Joint Operations Review Introduction C Neumeyer 2/10/05 Scope and Outline of Review Summary of Findings from 2004 Run Review of Joint Force, Pressure.
1 [10001] Time-delay Information Blockette (18 bytes) Name: Blockette Type: Time-delay Information Blockette NoteField nameTypeLengthMask or Flags.
Peer Review NSTX TF Hub Assembly Friction Coating C Neumeyer 10/27/04 Requirements Testing Calculation Update Implementation.
Figure 1 – NSTX Upper Umbrella Assembly Upgrade Design: Version 3.
NSTX TF Flag Joint Torque Collar Chit Review C Neumeyer 9/11/3.
NSTX Supported by NSTX Centerstack Upgrade Project Meeting P. Titus April 14, 2010 PF4/5 Terminal Stress Existing PF4/5 Support Weld Algorythm Moment Influence.
PSI-21-january-2004MEG Drift chambers1 1)Hardware Foils Hood Inner cathode Prints and preamps 2)Calibration Malte‘s Garfield isochronal Lines and drift.
TF Joint Operations Review Commissioning Plan C Neumeyer 2/10/05 Test Shots Instrumentation Benchmarking.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
NSTX TF Flag Joint Design Review SUMMARY C Neumeyer 8/7/3.
TF Joint Operations Review Simplified Modeling & Protection C Neumeyer 2/10/05 IP and OOP Load Modeling Linear Model of IP and OOP pressure at Joint FEMLAB.
NSTX NSTX TF, PF and umbrella Upgrade Internal ReviewFeb 24, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
Proposed TF Joint Design Concept #1 C Neumeyer 3/23/9 Notes: 1)Several concepts included are based on ideas developed by R Woolley 2)No analysis has yet.
NSTX TF Flag Joint Status of Design, Analysis, Test Activities & Design Review Preparations C Neumeyer NSTX Team Meeting 7/24/3.
AWB NSTX TF Flag Joint Design Review April 10, 2003 Art Brooks.
REQUIREMENTS & ASSUMPTIONS C Neumeyer 4/10/3. FIELD AND CURRENT Base GRD requirement: 3kG at R 0 =0.854m with 4.5 sec flat top, once every 300s
Analysis of TF Load Paths and Vacuum Vessel Loading H. M. Fan Jan. 22, 2009.
Engineering Operations Outage Schedule The vessel & beamline are under vacuum. 1st Bake-out complete. Air leaks found and fixed. The OH coil will be installed.
HT-7 The Calibration factors of ECE in HT-7 Exp2006(Spring) 微波组.
Engineering Operations TF Commissioning Mechanical testing of TF flag/box assemblies complete, inner bundle installed, and all joints made up. Joint resistance.
K. Luchini LCLS Lehman Review - Controls Breakout, May 11th 2005 Magnet Power Supplies K. Luchini Overview Hardware Software.
Preliminary Analysis of TF Joint Behavior* C Neumeyer NSTX Team Meeting 2/12/4 *Summary from 1/29/4 Presentation.
Chapter 2 Overview 1.
Formative Assessment. question practice problems.
TF Joint Testing Data Acquisition Special Test Equipment Hans Schneider with Robert Marsala (609) Engineering Operations April.
NSTX TF Flag Joint Design Review OVERVIEW C Neumeyer 8/7/3.
Performance of B-sensor types EUDET NIKHEF VS F. Bergsma 12/9/2007.
Instrumentation for status monitoring of SST-1 superconducting magnets
Feather_0.4: 4-run test report
ENGINEERING MEASUREMENTS
Robotics Sensors and Vision
MuCool Test Facility Instrumentation Update
TOPIC- Load cell A load cell is a transducer that is used to create an electrical signal whose magnitude is directly proportional to the force being.
Magnetic measurements at ambient temperature on the MQXFBP1
Presentation transcript:

Signals from ISTP-001 April 11-13, 2005 Preliminary Assessment C Neumeyer

98 Shots Performed for ISTP and for Magnetics Calibration Final Shots were 50% and 100% daily test shots Hold Point

Voltage Probes Same as last run except 8 channels have A&B monitoring Allows monitoring of out-of-plane loading Web page developed to archive probe vs. channel assignments (instead of reliance on notebook records)

Fiber Optic Temperature, Strain, and Displacement Flags (inner, outer/top, bottom) 4 flags x 3 strain/flag = 12 strain 4 flags x 1 temp/flag = 4 temp Hub and Flag twist angle (top, bottom) 2 displacement Flag end ∆Z & ∆  motion (top, bottom) 4 displacement Hub (top only) 1 displacement FISO Technologies, Inc. Total 23 transducers8 conditioner channels New

FISO Joint Res Meas System CAMAC FISO TF Joint Inst Rack Top Voltage Probe Cable Tray + 8 f/o extension cables Top Voltage Probe Cable Tray + 8 f/o extension cables Bottom Voltage Probe Cable Tray + 8 f/o extension cables Bottom Voltage Probe Cable Tray + 8 f/o extension cables Max 8 signals at a time from Top or bottom Max 8 signals at a time from Top or bottom

Joint Voltage for 4.5KG TF-Only and Combined 100% Field Shots mV 21L Meas

Joint Voltage for 4.5KG TF-Only and Combined 100% Field Shots mV 21L Meas

Flag Probe Temperature During TF-Only Shots degC 21U First Evidence of Liftoff at 4.5kG

Flag Probe Temperature During TF-Only Shots degC 21U

Flag Probe Temperature During TF-Only Shots & 5 degC 21U

Strain During 4.5KG TF-Only, TF+OH, and Combined 100% Field Shots microS 21L LHS 21L RHS

Strain During 4.5KG TF-Only, TF+OH, and Combined 100% Field Shots microS 21L LHS 21L RHS

Flag End Displacement During TF-Only Shots mil 21L Vert 21L Horiz mil ~ 4 mils 2005 > 20 mils 2004 ~ 4 mils 2005 > 20 mils 2004

Flag End Displacement During 4.5KG TF-Only & Combined 100% Field Shots mil 21L Vert 21L Horiz mil OH PF2

Toroidal Twist Measured by Flag End w.r.t. Umbrella TF-Only 4.5kG TF & OH, TF & PF2 deg 21U deg 21L PF2 OH

In-Plane Moment to Joint from PSRTC

Out-Of-Plane Moment to Joint from PSRTC

Peak Pressure at Joint from PSRTC

Hub/Box Shear Load from PSRTC

Voltage Drop Measurements vs. Model

Benchmarking Procedure Fit Structural Coefficients to Measurements Identify Worst Case Joint Re-Run Engineering models Re-Assess 6kG Performance