1 LIGO-G1001030-V2 LLO CDS Electronics Rack Naming Scheme CDS racks are named according to site, IFO designation, subsystem use, station (location) and.

Slides:



Advertisements
Similar presentations
1 LIGO-D V3 LLO X-End CERX VEAX PVC – 6 x 10 PVC – 6 Cap ¾ QuickEdge 5/8 QuickEdge 6+ hole centered 24 up, 39 over.
Advertisements

LLO Addendum to Basic Laser Safety Training
LIGO-G V8 1 aLIGO DC Power Distribution Contents.
1 LIGO-D V2 LLO X-End CERX VEAX PVC – 6” x 10 PVC – 6” Cap ¾” QuickEdge 5/8” QuickEdge 6+” hole centered 24” up, 39” over.
LIGO-G D Comments: Staged implementation of Advanced LIGO Adv LIGO Systems 17 may02 dhs Nifty idea: a way to soften the shock, spread cost, allow.
LAE Access Discussion 1 LIGO-G V2 LAE Access Discussion – by David Kinzel and Richard McCarthy, with input from Peter King and Michael.
LIGO-G v2 Form F v1 Advanced LIGO1 PROVISION OF SPACE FOR LHO aLIGO OPLEV & PHOTCAL INSTALLATIONS Abstract: The purpose of this document.
LIGO- G M State of the LIGO Lab Stan Whitcomb LSC meeting Hanford 17 August 2004.
Status of Electronics and Control System P J Smith University of Sheffield 20 th August 2009.
LIGO-G9900XX-00-M LIGO R&D1 ITM Cooldown Spot Size Measurements at LLO, Jan Valera Frolov Doug Lormand Antonio Luchianetti Sam Waldman Phil Willems.
Investigation of the influence of suspended optic’s motion on LIGO detector sensitivity Sanichiro Yoshida Southeastern Louisiana University.
Department of Meteorology Schools Met Day Welcome to the University of Reading Meteorology Day 2014 “How do we predict the weather?”
G D Tasks After S3 Commissioning Meeting, Oct 6., 2003 Peter Fritschel, Daniel Sigg.
0 024 October 2003 Systems for process automation and product controls in the fields of industrial, power, heating and conditioning, medical and domestic.
LIGO and Advanced LIGO: Technical Issues Dave Ottaway (for LIGO Scientific Community) LIGO Lab Kavli Institute for Astrophysics and Space Research, Massachusetts.
1 LIGO-G D LIGO Commissioning PAC Meeting, 18 May 2005, LIGO Livingston Joe Giaime, LSU & LLO, for the entire commissioning team. PAC Meeting,
G D Initial LIGO improvements & Advanced LIGO P Fritschel PAC Meeting LLO, 18 May 2005.
LIGO-G v5 1 Pre-stabilized Laser System (PSL) Technical Status NSF Review of Advanced LIGO Project Benno Willke, AEI Hannover and the AdvLIGO PSL.
4/25/11 G v3 1 Facility Modifications and Preparations (FMP) Technical Status Annual NSF Review of Advanced LIGO Project April , 2011 John.
LIGO-G Z LIGO Commissioning Report LSC Meeting, Hanover August 19, 2003 Peter Fritschel, MIT.
Measuring the Current and Voltage of a 820 Ω Resistor Setting for Multimeter = 200 mA DC Measure Voltage in 2 V increments up to 20 V.
High Current Stabilization Circuit for Ultracold Atom Trap
computer
1 LIGO-D V5 LLO Y-End CERY VEAY PVC – 6” x 10 PVC – 6” Cap ¾” QuickEdge 5/8” QuickEdge 6+” hole centered 24” up, 39” over.
Amaldi conference, June Lock acquisition scheme for the Advanced LIGO optical configuration Amaldi conference June24, 2005 O. Miyakawa, Caltech.
1 LIGO-G V5 LLO CDS Components Front End Computer Timing Master 18VDC18VDC I/O Extension Timing Fanout 24VDC24VDC Chassis DC Power AC VoltageAC.
LIGO-G v3 March 30, aLIGO BSC ISI Electronics aLIGO BSC ISI Electronics FDR 3/30/2010 LIGO-G Ben Abbott, Brian Lantz.
How to use Remote Desktop and Remote Support. What is remote desktop? Remotely control your computer from another office, from home, or while traveling.
1 Environmental Coupling During S5 Robert Schofield (University of Oregon) I. PEM injection overview II.Acoustic/seismic coupling III.Seismic upconversion.
E v3 aLIGO SEI Testing and Commissioning Overall Plan
LIGO- G R Amaldi7 July 14 th, 2007 R. Ward, Caltech 1 DC Readout Experiment at the Caltech 40m Laboratory Robert Ward Caltech Amaldi 7 July 14.
LIGO-G D LIGO II1 AUX OPTICS SUPPORT Michael Smith, 6/11/03 STRAY LIGHT CONTROL ACTIVE OPTICS COMPENSATION OUTPUT MODE CLEANER PO MIRROR AND PO.
G TCS installation & results at LLO Update: Systems Telecon 8 th Jan 2014 Aidan Brooks (for the TCS Team) G v1.
Supervised Agriculture Experience (SAE) Ms. Marlin Advanced Animal Science.
40m AOS DRD, G R1 40m Auxiliary Optics Support Design Requirements Document & Conceptual Design Michael Smith 10/18/01 Stray Light Control Initial.
WOMAN (Work-Oriented Mobile Autonomous Neat-freak) University of Florida Department of Electrical and Computer Engineering Intelligent Machines Design.
LIGO- G R 40m Progress, LSC meeting, 8/021 40m Laboratory Upgrade Progress Report Dennis Ugolini, Caltech 40m Technical Advisory Committee LIGO-G R.
LIGO- G R 40mAdvLIGO R&D program, 10/8/ Meter Lab program for AdvLIGO R&D Alan Weinstein, Caltech AdvLIGO R&D Technical Review, 10/8/02.
Hiro Yamamoto GWADW Girdwood, Alaska LIGO-G Beam Splitter in aLIGO Hiro Yamamoto LIGO/Caltech BS02 to BS05? larger BS? BS in aLIGO IFO for.
TCS and IFO Properties Dave Ottaway For a lot of people !!!!!! LIGO Lab Kavli Institute for Astrophysics and Space Research, Massachusetts Institute of.
DPCL Solid State Device Discrete Control Lecture.
G D LIGO Commissioning Update LSC Meeting, Nov. 11, 2003 Daniel Sigg.
LIGO- G R 40m weekly meeting, Jan 05, Explore demodulation phase for DDM on 40m RSE prototype Osamu Miyakawa, Caltech LIGO-G R.
1 Electrical Fundamentals We need some understanding of electrical fundamentals to do the lab exercises. Electric Circuit Consists of: –Power Source: Battery,
IC-CAP Modeling Configuration Agilent Technologies November 01, 2005 Page 1 Agilent IC-CAP Modeling Configuration - Block Diagram ( GHz) GPIB.
Introduction to live CDs Leon Lee. What are live CDs? “Live” because it can run an operating system existing on the disc without installation Functions.
G I Enhanced LIGO Update Rana Adhikari July ’07 LSC Meeting.
LIGO- G R Amaldi7 July 14 th, 2007 R. Ward, Caltech 1 Prototyping for eLIGO: Power Recycled Fabry Perot Michelson DARM RF ITMy ITMx BS PRM SRM.
Data Acquisition, Diagnostics & Controls (DAQ)
Friendly Power Shutdown for LLO Corner Buildings
Main Interferometer Subsystem
Main Interferometer Subsystem
First Lessons from the Advanced LIGO Integration Testing
Further AC Charging Systems
Summary of IFO Spatial Mode Workshop
A Proposed Capacitive Position Sensor Timing Synchronization and Distribution Solution Ben Abbott May 9, 2014 G v1.
PLC Hardware Components.
Thermal Compensation Installation at LHO
LO/IF Switches Doug Scott
Detection Of High Frequency Gravitational Waves At LIGO W. Butler , A
FERRO Warehouse under Model 4A
B904 Status Report by Fred B.
Advanced LIGO optical configuration investigated in 40meter prototype
All about Robotics Robotics Junior.
500 nm WRITE VOLTAGE 0 V.
November 2006 ITM Heating Measurements at LLO
Around the room Orders of operations.
Lecture No# 6 Prepared by: Engr. Qurban Memon
- '1:- bs? a ' I.
Rectifiers.
Presentation transcript:

1 LIGO-G V2 LLO CDS Electronics Rack Naming Scheme CDS racks are named according to site, IFO designation, subsystem use, station (location) and sequence. SiteDescriptionIFOSubsystemDescriptionStationDescription Rack Number LLivingston1AOSAuxiliary OpticsC[Corner] Common1 HHanford2DAQData AcquisitionMSMass Storage2 MMIT ETRElectronics Test RackR[Corner] Remote (Field)3 CCIT FACFacilities and InfrastructureXCX-End Common4 ISCIFO Sensing and ControlXRX-End Remote [Field]5 LDRLaser Diode RoomYCY-End Common6 PEMPhysical Environment MonitoringYRY-End Remote [Field]7 PSLPre-stabilized Laser 8 SEISeismic Isolation 9 SUSSuspensions 10 TCSThermal Compensation System 11 VACVacuum 12 VDCVoltage - DC etc.

2 LIGO-G V2 LLO CDS Electronics Rack Naes RackRack DesignatorSubsystemLocationComment 1L1-TCS-C1AOSCommon Electronics Room 2L1-TCS-R1AOSRemote Electronics Rack 3L1-TCS-R2AOSRemote Electronics Rack 4L1-TCS-XC1AOSX End Remote Electronics Rack 5L1-TCS-XR1AOSX End Remote Electronics Rack 6L1-TCS-YC1AOSY End Common Electronics Rack 7L1-TCS-YR1AOSY End Remote Electronics Rack 8L1-PEM-C1DAQCommon Electronics Room 9L1-ETR-01DAQDAQ Electronics Test Rack 10L1-PEM-XC1DAQ/ISCX End Common Electronics Rack 11L1-PEM-YC1DAQ/ISCY End Common Electronics Rack 12L1-ISC-C1ISCCommon Electronics Room 13L1-ISC-C2ISCCommon Electronics Room 14L1-ISC-C3ISCCommon Electronics Room 15L1-ISC-R1ISCRemote Electronics Rack 16L1-ISC-R2ISCRemote Electronics Rack 17L1-ISC-R3ISCRemote Electronics Rack 18L1-ISC-XR1ISCX End Remote Electronics Rack 19L1-ISC-YR1ISCY End Remote Electronics Rack 20L1-ETR-04OPTICSOptics Electronics Lab Rack 21L1-LDR-C1PSLLaser Diode Room Rack 22L1-LDR-C2PSLLaser Diode Room Rack 23L1-PSL-C1PSLCommon Electronics Room 24L1-PSL-R1PSLRemote Electronics Rack 25L1-PSL-R2PSLRemote Electronics Rack 26L1-SEI-C1SEICommon Electronics RoomSEI HAM 1 and HAM 6 27L1-SEI-C2SEICommon Electronics RoomSEI HAM 2 and HAM 3 28L1-SEI-C3SEICommon Electronics RoomSEI HAM 4 and HAM 5 29L1-SEI-C4SEICommon Electronics RoomSEI BCS1 30L1-SEI-C5SEICommon Electronics RoomSEI BCS2 31L1-SEI-C6SEICommon Electronics RoomSEI BCS3 32L1-SEI-XC1SEIX End Common Electronics RackSEI BCS4 33L1-SEI-YC1SEIY End Common Electronics RackSEI BCS5 34L1-ETR-05SEIHAM ISI Electronics Test Rack 35L1-ETR-07SEITriple Electronics Test Rack 36L1-SUS-C1SUSCommon Electronics RoomSUS ITM, FM, and BS (1 of 2) 37L1-SUS-C2SUSCommon Electronics RoomSUS ITM, FM, and BS (2 of 2) 38L1-SUS-C3SUSCommon Electronics RoomSUS HAM 2 (1 of 2) 39L1-SUS-C4SUSCommon Electronics RoomSUS HAM 2 (2 of 2) 40L1-SUS-C5SUSCommon Electronics RoomSUS ITMX, ITMY, and BS (1 of 2) 41L1-SUS-C6SUSCommon Electronics RoomSUS ITMX, ITMY, and BS (2 of 2) 42L1-SUS-C7SUSCommon Electronics RoomSUS HAM 5 and HAM 6 (1 of 2) 43L1-SUS-C8SUSCommon Electronics RoomSUS HAM 5 and HAM 6 (2 of 2) 44L1-SUS-R1SUSRemote Electronics Rack 45L1-SUS-R2SUSRemote Electronics Rack 46L1-SUS-R3SUSRemote Electronics Rack 47L1-SUS-R4SUSRemote Electronics Rack 48L1-SUS-R5SUSRemote Electronics Rack 49L1-SUS-R6SUSRemote Electronics Rack 50L1-SUS-XC1SUSX End Common Electronics Rack 51L1-SUS-XC2SUSX End Common Electronics Rack 52L1-SUS-XR1SUSX End Remote Electronics Rack 53L1-SUS-YC1SUSY End Common Electronics Rack 54L1-SUS-YC2SUSY End Common Electronics Rack 55L1-SUS-YR1SUSY End Remote Electronics Rack 56L1-ETR-02SUSBSC Electronics Test Rack 57L1-ETR-03SUSRM Electronics Test Rack 58L1-ETR-06SUSSTS Huddle Electronics Test Rack 59L1-VAC-R1VACRemote Electronics Rack 60L1-VAC-R2VACRemote Electronics Rack 61L1-VAC-R3VACRemote Electronics Rack 62L1-VAC-XR1VACX End Remote Electronics Rack 63L1-VAC-YR1VACY End Remote Electronics Rack 64L1-VDC-C1VDCDC Voltage Rack - CPR 65L1-VDC-C2VDCDC Voltage Rack - CPR 66L1-VDC-C3VDCDC Voltage Rack - CPR 67L1-VDC-C4VDCDC Voltage Rack - CPR 68L1-VDC-C5VDCDC Voltage Rack - CPR 69L1-VDC-C6VDCDC Voltage Rack - CPR 70L1-VDC-C6VDCDC Voltage Rack - CPR 71L1-VDC-XC1VDCDC Voltage Rack - VEAX 72L1-VDC-XC2VDCDC Voltage Rack - VEAX 73L1-VDC-YC1VDCDC Voltage Rack - VEAY 74L1-VDC-YC2VDCDC Voltage Rack - VEAY 75L1-MS1 76L1-MS2 77L1-MS3 78L1-MS4 79L1-MS5 80L1-MS6 81L1-DAQ-MS7DAQFront end computers 82L1-DAQ-MS8DAQFront end computers 83L1-DAQ-MS9DAQFront end computers 84L1-MS10 85L1-MS11 86L1-MS12 87L1-MS13 88L1-FAC-XC1DAQFacilities - VEAX 89L1-FAC-YC1DAQFacilities - VEAY