“Get in, do it right, get out, and stay out.”

Slides:



Advertisements
Similar presentations
1 Roadway User Costs Nathaniel D. Coley Jr. Prefabricated Bridge Elements and Systems Work Zone User Costs Nathaniel D. Coley Jr. Federal Highway Administration.
Advertisements

RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E.
Moving transportation into the future Strategic Highway Research Program.
Work Zone Safety Using Accelerated Bridge Construction (ABC) Rukhsana Lindsey, UDOT Presented by Jim McMinimee Principal Engineer, Applied Research Associates.
ACCELERATED BRIDGE CONSTRUCTION (ABC): THE KEYS TO SUCCESS FROM AN OWNERS PERSPECTIVE Presented by James McMinimee, P.E., P.S.E. UDOT Chief Engineer, Director.
AASHTOTECHNOLOGY IMPLEMENTATION GROUP 1 TIG: Driving Innovation for Transportation Keith Platte, P.E. Program Manager AAASHTO.
1 Roadway User Costs Nathaniel D. Coley Jr. Prefabricated Bridge Elements and Systems Work Zone User Costs Nathaniel D. Coley Jr. Federal Highway Administration.
Project Scheduling for Load Testing Bridges for ENCE 667 Course Project Spring 2001 Justin Myers.
SOUTHEAST PBES/ABC REGIONAL PEER EXCHANGE ARKANSAS STATE HIGHWAY & TRANSPORTATION DEPARTMENT FEBRUARY 26,
Innovative Contracting Techniques that Consider Driver Impacts Use of A+B Bidding Presented by: David L. Kent P.E. New York State Department of Transportation.
Nothing too heavy, nothing too high BRIDGES ON THE MOVE Sean Poynter, LEED-AP Senior ABC Estimator.
SUMMARY REPORT OF THE NCHRP 20-68A – US Domestic Scan Program Scan 11-02: Best Practices Regarding Performance of Accelerated Bridge Construction (ABC)
Chapter 34 Bridge Construction.
6TH ANNUAL CONFERENCE. The Use of Temporary Steel Barriers in Construction Zones By Don Pyde Product Manager Trinity Highway Products.
PREFABRICATED BRIDGE ELEMENTS & SYSTEMS (PBES), DECISION- MAKING FRAMEWORK Claude Napier Sr. Structural Engineer Resource Center - Structures TST.
Totally Precast Concrete Bridges
Welcome to Webinar on Accelerated Bridge Construction Featured Presentation: ABC Short-Span Low-Volume Bridge Types & Lessons Learned – Part 2: Composites.
SR-528 (Beach Line)/ SR-3 (Courtenay Blvd) Emergency Bridge Repair January 21, 2011.
 Project Delivery  Design Considerations  Lessons Learned.
Welcome to Webinar on Accelerated Bridge Construction Featured Presentation: Economical Details over Piers Using Simple-for- Dead-Load & Continuous-for-Live-Load.
Illinois Department of Transportation Weigh In Motion Study
3/10/2010 March 2010 ABC Pooled Fund Study TAC Teleconference 1.
Module 1 What are Prefabricated Bridge Elements & Systems for Accelerated Bridge Construction (ABC/PBES)? Module 1 What are Prefabricated Bridge Elements.
M AKE E VERY DAY COUNT A CCELERATING B RIDGE C ONSTRUCTION WITH P REFABRICATED B RIDGE E LEMENTS & S YSTEMS.
What is a Hallmark Modular Home? A Hallmark Modular Home is designed, engineered and built in the controlled environment of a modern factory. It is computer.
Schematic Design of an Accelerated Bridge Construction Project Michael P. Culmo, P.E. Vice President of Transportation and Structures CME Associates, Inc.,
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.
ODOT Policy for Deck/Slab Closure Pours Sean Meddles, P.E. Assistant Administrator ODOT Office of Structural Engineering.
Welcome to Webinar on Accelerated Bridge Construction Featured Presentation: ABC Short-Span Low-Volume Bridge Types & Lessons Learned – Part 3: Concrete.
ABC/PBES COSTS by Mary Lou Ralls, P.E., Principal Ralls Newman, LLC (formerly Texas State Bridge Engineer)
There are many types of bridges including:
Route CC bridge replacement over Caulk’s Creek. What is the problem? Large debris consistently collects on the upstream end of the bridge. This causes.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
1 P H I L L I P S T O N Route 2 Over Route 2A SPMT Heavy Lift September 8, 2015| Leading the Nation in Transportation Excellence |
GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013.
WVDOH Accelerated Construction Concepts Benjamin Beerman, PE.
SHRP 2 - FIRST DEMO PROJECT KEG CREEK, IOWA R04 – “BRIDGE DESIGNS FOR RAPID RENEWAL” Sandra Larson, P.E. Iowa Department of Transportation Research and.
Civil Engineering By: Chris Gregory Ms.Chapman Marine Science II HONS 15 May, 00.
WORK ZONE SAFETY & MOBILITY Meeting the Federal Rule Jim Allen Safety Implementation Engineer ATSSA Illinois Chapter Meeting.
International Partnership Day.  An SPMT is used for transporting massive structures that are too large or heavy for normal trucks  The SPMT consists.
Planning and Design in Rockford: Morgan Street Bridge Project 315 North Main Street · Rockford IL
AASHTO TIG Ananth Prasad Chief Engineer, Florida DOT.
Materials, Pavements & Transportation Operations CONCEPTS FOR ENHANCING THE EFFECTIVENESS OF TRAFFIC CONTROL PLANS Stuart Anderson Gerald Ullman Making.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
AASHTO TIG Ananth Prasad Chief Engineer, Florida DOT.
Bridget Malinowski February 2013 ROADWAY TRAFFIC CONTROL & COMMUNICATIONS MANUAL 1.
Rapid Bridge Construction: Prefabricated Substructure Elements AASHTO RAC High Value Research Workshop July 27, 2011.
Re-Do It -- Faster, Cheaper, Greener Pavement Renewal Solutions.
Transportation Operations Group Designing for Speed, Congestion, and Delay in the Work Zone Gerald Ullman Research Engineer Texas Transportation Institute.
Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges.
Kansas DOT Research Project Implementation Presented By Rick Kreider (Chief of Research) Created By Susan Barker (T 2 Engineer)
VT 100 over the Mad River Bridge Replacement July 13, 2015.
Construction zones and traffic control Objective Review extent of problem Identify contractor responsibilites Identify control plan components.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
Public Meeting August 19, 2015 Williams Cr (Shoup Bridge) Replacement Project.
Delmar Boulevard bridge replacement over Interstate 170.
A CCELERATING B RIDGE C ONSTRUCTION (ABC) WITH P REFABRICATED B RIDGE E LEMENTS & S YSTEMS (PBES)
Construction of the Route 460 Connector Phase 1 Breaks, Virginia Timothy Barry, PE Robert Bennett, EI June 10-13, 2012 Pittsburgh, PA.
Totally Precast Concrete Bridges
Aaron Crowley, Ph.D. KSWA Travis Smith, P.E. TDOT Biloxi, Mississippi
New Bridge Construction
Work Zone Safety Review – District 1 - Duluth
Wave of the Future Trendy Novelty?
Totally Precast Concrete Bridges
Safety by Design & Engineering – Florida Footbridge
Update on AASHTO’s Comments Jim McDonnell, P.E. AASHTO
WisTMP 2.0 Update Andy Heidtke, PE Statewide Work Zone Design Engineer
Presentation transcript:

Keep America Moving During Bridge Construction AASHTO TIG SPMT Bridge Moves Lead States Team 2008

“Get in, do it right, get out, and stay out.” …has become a rallying cry for new technologies that accelerate construction, minimize negative impacts on motorists, and improve worker and motorist safety. Keep America Moving During Bridge Construction Jugesh Kapur, P.E. Bridge Design Engineer Washington State DOT NHI Webinar June 26, 2008

ultimate flexibility and speed SPMT technology = ultimate flexibility and speed The Federal Highway Administration (FHWA) has identified reducing construction related impacts to the traveling public as a major priority for the nation’s highway program. The use of self-propelled modular transporter (SPMT) technology provides agencies and contractors with the ultimate flexibility and speed in removing and installing bridge structures. Keep America Moving During Bridge Construction Jugesh Kapur, P.E. Bridge Design Engineer Washington State DOT NHI Webinar June 26, 2008

Rolling whole bridges spans in or out of place by remote control using SPMT’s have many highway applications. Keep America Moving During Bridge Construction Jugesh Kapur, P.E. Bridge Design Engineer Washington State DOT NHI Webinar June 26, 2008

What is an SPMT? a combination of multi-axle platforms computer-operated pivots 360 degrees lifts, carries, sets large/heavy loads moves at walking speed A Self-Propelled Modular Transporter is a combination of multi-axle platforms operated through a state-of-the-art computer-controlled system that is capable of pivoting 360 degrees as needed to lift, carry, and set very large and heavy loads of many types. SPMTs are motorized vehicles that move at walking speed and are capable of carrying large structures, such as bridges, from offsite locations, positioning them precisely into final position. The SPMT then exits the site, returning the area to traffic use within minutes or hours. Keep America Moving During Bridge Construction Jugesh Kapur, P.E. Bridge Design Engineer Washington State DOT NHI Webinar June 26, 2008

Why SPMT? Why Now? Significantly Reduce Traffic Disruption NHI Webinar SPMTs allow workers to remove or place whole bridge structures on busy roadways in just minutes or hours. Most of the complex – and often hazardous – work of building or removing structures in the path of existing traffic occurs offsite. Roadway interruptions occur only in the very brief windows of time in which a structure is being positioned for installation or carried offsite for demolition. Keep America Moving During Bridge Construction Jugesh Kapur, P.E. Bridge Design Engineer Washington State DOT NHI Webinar June 26, 2008

Why SPMT? Why Now? Significantly Reduce Traffic Disruption Open Highways To Traffic In Hours During conventional bridge construction, traffic that travels under the bridge is typically restricted during certain types of activity to protect motorist and worker safety. SPMTs can greatly reduce the duration of such interruptions. Keep America Moving During Bridge Construction Jugesh Kapur, P.E. Bridge Design Engineer Washington State DOT NHI Webinar June 26, 2008

Why SPMT? Why Now? Significantly Reduce Traffic Disruption Open Highways To Traffic In Hours Improve Work Zone Safety SPMT technology allows the prefabrication of structures in offsite staging areas, where construction crews can perform most of their work away from traffic. This improves the safety of the work environment and reduces the exposure of motorists to roadway work zone hazards. Significant worker safety benefits are also derived from the ability to work during the day without interruptions and near ground level throughout the construction process. Keep America Moving During Bridge Construction Jugesh Kapur, P.E. Bridge Design Engineer Washington State DOT NHI Webinar June 26, 2008

Why SPMT? Why Now? Significantly Reduce Traffic Disruption Open Highways To Traffic In Hours Improve Work Zone Safety Improve Quality and Constructability Since SPMTs allow bridges to be built in the controlled environment of an off-road site, the focus remains solely on construction rather than the need to accommodate traffic. In this environment the more uniform production capability with adequate time for proper concrete curing leads to consistent overall quality and constructability of the finished product. Keep America Moving During Bridge Construction Jugesh Kapur, P.E. Bridge Design Engineer Washington State DOT NHI Webinar June 26, 2008

Why SPMT? Why Now? Significantly Reduce Traffic Disruption Open Highways To Traffic In Hours Improve Work Zone Safety Improve Quality and Constructability Increase Contractor and Owner Options SPMT technology are very versatile. They can be linked together to carry varying loads and can traverse rough terrain. Lifting the structure from below and “driving” it into (or out of) place eliminates many issues related to overhead height restrictions that impact crane lifting operations, while the supported SPMT loads provide added safety assurance relative to suspended crane loads. Offsite staging allows the contractor to work in daylight and extend work hours as needed in a safer environment. For example, onsite foundation and substructure work can occur simultaneously with superstructure fabrication, saving significant construction time. The benefits of onsite construction speed can be further increased by driving in multi-span bridges complete with substructures. SPMTs can also be used to relocate existing spans onto new foundations to accommodate mainline widening or new interchange configurations. Finally, “mom and pop” construction companies can use this technology as readily as larger companies because SPMT vendors provide engineering services that assist contractors with specialty issues. Keep America Moving During Bridge Construction Jugesh Kapur, P.E. Bridge Design Engineer Washington State DOT NHI Webinar June 26, 2008

Examples of Project and User Cost Savings less maintenance-of-traffic possibility of less night work reduced construction time reduced onsite time for engineering and inspection requirements The cost of mobilizing SPMT technology is offset by significant project savings that may include: fewer and shorter maintenance-of-traffic setups shorter hours for law enforcement officers due to fewer rolling roadblocks time savings from fewer shift changes for construction crews the elimination of temporary-detour construction and repair of long-term detours on existing roads Keep America Moving During Bridge Construction Jugesh Kapur, P.E. Bridge Design Engineer Washington State DOT NHI Webinar June 26, 2008

Examples of Project and User Cost Savings reduction in construction-related user costs lower contractor insurance premiums reduced labor costs (water projects) Additional project and cost savings include: the use of smaller owner and contractor crews reduced onsite time required for owner agency engineering and inspection requirements due to accelerated construction a vast reduction in the myriad user costs associated with construction-related delay, detour, and congestion less maintenance and repair costs associated with better long-term performance of the prefabricated structure. Keep America Moving During Bridge Construction Jugesh Kapur, P.E. Bridge Design Engineer Washington State DOT NHI Webinar June 26, 2008

Traffic Impact Comparison CONVENTIONAL BRIDGE CONSTRUCTION Work Operation Duration Traffic Control Method Bridge Demolition 2-3 days per span Detour Beam Placement 25-90 minutes per beam Rolling roadblocks or detour Form Placement Varies Lane shifts/ closure Deck Concrete Placement 1-2 days per span SPMT Complete Span Removal or Placement 25 minutes to a few hours Detour or Single Rolling roadblock Graves Avenue / I-4 SPMT technology can reduce traffic impacts from months to minutes or a few hours. For safety reasons conventional construction techniques require lane shifts or total closure of the underlying road during certain work operations. Typical items of work include girder placement, form placement, deck casting and bridge removal. The contractors work times are typically restricted to off-peak traffic, thus affect production efficiencies. For wide bridges with many beam lines, the number of rolling road block impacts to traffic can be quite large. Keep America Moving During Bridge Construction Jugesh Kapur, P.E. Bridge Design Engineer Washington State DOT NHI Webinar June 26, 2008 13

How do I learn more? http://www.fhwa.dot.gov/bridge/prefab/ For additional resources on the use of SPMTs to remove and install bridges, visit : http://www.fhwa.dot.gov/bridge/prefab/ There you’ll find everything from technical drawings and specifications, to a copy of this presentation, to news clippings on successful SPMT projects. Thank you very much. I’m happy to answer any questions. Keep America Moving During Bridge Construction Jugesh Kapur, P.E. Bridge Design Engineer Washington State DOT NHI Webinar June 26, 2008