Beaver Dam Wash Bridge Project Introduction Nick Hont, P.E. Mohave County Flood Control District Engineer.

Slides:



Advertisements
Similar presentations
State Aid Programs An Introduction to: Local Bridge Replacement Program Local Road Improvement.
Advertisements

State Aid Programs Legislative Issues - Bonding Local Bridge Replacement Program Local Road Improvement Township Sign Replacement Program.
Flooding in San Diego County Deserts Designed 11/99 by Rand Allan Flood Control Hydrology.
A section has been added regarding Stream Restoration Design Criteria: A. Designs for stream restoration try to mimic natural conditions present in stable.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
NDACo Conference County Needs for Long Term Highway and Bridge Funding Jason Benson Cass County Engineer.
Duane Hill, District Engineer
Watershed Dams in Georgia 1. –357 Total –195 High Hazard (NRCS) –NRCS constructed – owned by local sponsors –Most built between 1950s-1970s for flood.
TRE ANNUAL MEETING Grant Levi, NDDOT Director November 26,
VIII. 1 VIII. Overview Of Design Guidelines See these resources: Various City/County Design Manuals and CCDC-01 (5.4), CCDM-99 (1005), CTDM-89 (9.5), FITD.
City of Fargo Meadow Creek Area Flood Risk Management – Project 5944 Public Information Meeting June 21, 2010.
1 FEMA Flood Insurance Rate Map Update FEMA Public Meeting October 22, 2009.
Kick Off Meeting City of Pensacola April 18, 2011.
Agricultural Pond Private Engineering Resources & Costs Agricultural Water Resource Development Workshops Presented by: Cavanaugh & Associates P.A. 530.
Design of Open Channels and Culverts CE453 Lecture 26
Design of Open Channels and Culverts
ESCAMBIA COUNTY FLOOD RECOVERY 1-Year Anniversary Report Escambia County Board of County Commissioners Office of Public Information & Communication 221.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
Nicholas Finch Local Programs Engineer Federal Highway Administration Preview of Federal-aid 101 Authorization Overview: Where we are! Where are we headed?
Public Location/Design Hearings November 17, 2010 Laughlin, Nevada November 18, 2010 Bullhead City, Arizona.
CHARACTER OF RIVER CHANNELS
AGENDA  PROJECT HISTORY  NORTHERN SECTION UPDATE  SOUTHERN SECTION OVERVIEW  INTERCHANGES  PROJECT SCHEDULE  UPCOMING ACTIVITIES  OPEN DISCUSSION.
Bridging the Finance Gap Terri Smith Environmental Liability Management, Inc.
Route CC bridge replacement over Caulk’s Creek. What is the problem? Large debris consistently collects on the upstream end of the bridge. This causes.
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
By George C. Lee University at Buffalo
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
Navajo County Public Works Major Capital Improvement Projects Porter Mountain Road - $2.7 Million Realign, Replace and Reconstruct 1.7Miles of Existing.

Jeff Shelley, P.E. Project Delivery Team Leader FHWA, Alabama Division 9500 Wynlakes Place Montgomery, AL (334) Fax: (334) Mail.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
County Reports Arizona Association of County Engineers June 2008.
October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT
Oregon Transportation Infrastructure Bank (OTIB) Prepared by: Matthew Harris, Senior Financial Analyst.
Oregon Transportation Infrastructure Bank (OTIB) Prepared by: Matthew Harris.
1000+ Year Flood Event Terry D. Leatherwood, P.E..
Fluvial Criteria in the FAHP. “ All permanent stream crossing replacements must provide for a fully functional floodplain”
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Basic Hydraulics: Solids Transport. What is sediment? Matter that settles to the bottom of a liquid Matter transported by water or wind May be particles.
HIGHWAY DEPARTMENT Tim G. Schulte, P.E. Richland County Engineer.
Riverside County Flood Control and Water Conservation District Murrieta Creek Flood Control, Environmental Restoration and Recreation Project June 2006.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Basic Hydraulics: Bridges. Definition & terminology Abutments Flow contraction.
The Schoharie Bridge Collapse, Scour By Group 18 4 th Year Civil Engineering Date: 28 th of October 2005.
Julie Skallman State Aid Division Director & State Aid Engineer.
Transportation Finance Advisory Committee May 18, 2012.
Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges.
By Jacob. Where floods typically occur. Floods usually occur on rivers, creeks and bays. Floods also occur after tsunamis and hurricanes.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
October 15 th, 2013 The City of Akron SUM – Exchange Street / Cedar Street Corridor Safety Study.
Tempe Town Lake Downstream Dam Replacement NEW DAM ALTERNATIVES SELECTION January 5, 2012.
Fairview Avenue North Bridge Replacement Project Seattle Bicycle Advisory Board MariLyn J. Yim, P.E. October 7, 2015.
WEDGEWOOD COVE HOA STREET PAVING/RESURFACING PROJECT.
Bridge Hydraulics and Geotechnical. BRIDGE HYDRAULICS AND GEOTECHNICAL TECHNICAL STANDARDS BRANCH INTRODUCTION TO BRIDGES TRANSPORTATION Slide 2 The Hydrological.
When Disaster Strikes Prior Preparation, Response, Recovery King W. Gee Associate Administrator for Infrastructure Federal Highway Administration.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
 What is EWP & How Does the Program Work? Emergency Watershed Protection Program.
FUNDING AVAILABILITY & SAFETY PROGRAMS 3//21/2013.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
2009 Sales Tax Extension Project Status Update. 2 Background Sales Tax was extended via August 26, 2008 referendum. Sales Tax was extended for an additional.
EPA Region 7 Lead Remediation Byrnes Mill Dam and Park
Fluvial Criteria in the FAHP
2016 FHWA National Hydraulic Engineers Conference
FLOOD CONTROL PROBLEMS IN SOUTHERN CALIFORNIA
Babcock Basin-Design Phase
Bridges.
Stream Crossing Replacement Policy
Sacramento Environmental Commission January 2019.
Presentation transcript:

Beaver Dam Wash Bridge Project Introduction Nick Hont, P.E. Mohave County Flood Control District Engineer

In January 2005, an extreme flood caused irreparable damages to the Beaver Dam Wash Bridge on Mohave County Highway 91.

Mohave County selected URS Corp. through quality based selection to perform an engineering evaluation of the condition of the existing bridge. The engineering study included hydrology, hydraulics, geotechnical engineering and structural engineering. The geotechnical engineering analysis determined that the existing bridge pile foundations would not provide adequate bearing capacity when excessive scouring occurs during an extreme flood event. The County has applied for Federal Emergency Relief funds to replace the damaged structure with a new bridge built to current standards.

The FHWA has determined that the project costs are eligible for reimbursement with Federal-aid Emergency Relief Program funds, and Mohave County will be reimbursed for approximately 94% of the project costs. The new bridge will be lengthened, will be designed to handle heavier traffic loads (such as the HS 20 trucks), and will include a new, separate pathway for schoolchildren and other pedestrians. The estimated total project cost is about 9 million dollars. It includes fees for the engineering evaluation, design, permitting, necessary right-of-way acquisition and construction.

To finance the project cost until reimbursement is received from FHWA through ADOT, Mohave County obtained a Highway Extension Loan, for which the interest rate will also be reimbursable. The construction is anticipated to bid later this year. Mohave County has and IGA with the ADOT Flagstaff District to bid and manage the construction. The new bridge's length and realignment with the downstream channel, along with deeper piles, will allow it to withstand heavy flows and debris, will prevent excessive erosion and scour of the banks, will provide a more stable and more hydraulically efficient bridge, and will reduce the potential for breach and overtopping of the bridge and roadways.

Questions?