Eric Tweit Spring 2014 Mercer Corridor Project: West Phase Project update.

Slides:



Advertisements
Similar presentations
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
Advertisements

SR Lititz Pike Bridge Replacement Note: Dates indicated in this presentation are estimated based on the contractors current schedule and does.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
 Provide a safe crossing and maintain mobility › The bridge is identified as structurally deficient.  Meet regional traffic demands and improve mobility.
DDI Traffic Informational Session Town of Cornelius Lake Norman Chamber of Commerce June 11, 2014.
Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Titusville to Edgewater Bike Loop PD&E Study
Meeting Agenda Introduction of Project Team Connective Corridor Project Onondaga County Sewer Separation Project Civic Strip Project Syracuse University.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
WELCOME! October 28, 2013 ODOT District 1 & District 2.
In March 2015, Mayor Murray announced a proposal for a new 9-year, $900 million transportation levy to replace the Bridging the Gap levy that expires at.
Santa Maria River Bridges Widening. Project Location.
Update of Downtown Rail Improvements DFWI & Chamber Stakeholders February 26, 2014 Alonzo Liñán, PE, PTOE City of Fort Worth.
AVONDALE ROAD ITS 2006 COUNTYWIDE GRANT. AVONDALE ROAD ITS OVERVIEW OVERVIEW Location Location Avondale Road between Novelty Hill Road and NE 132 nd St.
Virginia Street Corridor Plan. From our Tier One University, world renowned recreation and our Midtown entertainment area to abundant cutting edge business.
Contact: Beth Morris
Slide 1. Slide 2 Introduction How did you get to school as a child?
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Accessible Mt. Baker Integrated Multimodal Plan Seattle Planning Commission Michael James, SDOT January 8, 2015.
Pinehurst School Traffic Safety Pinehurst School Traffic Safety Meeting January 27-28, 2015.
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
Center City Access Strategy A Transportation Vision for Growth and Access.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
Grand Canalscape Phase I: Phoenix Uptown and Gateway North Update Kerry Wilcoxon City of Phoenix Street Transportation Department Safety and Neighborhood.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
Current Construction Projects Major Projects Pinellas County.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Comprehensive Plan Update Kevin O’Neill Seattle Bicycle Advisory Board September 2, 2015.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Sustainable Transportation Design Project: Proposed Changes to Belmont/Morrison Couplet By: Bryan Blanc, Marisa DeMull, Andy Kading.
High Desert Corridor -New State Route 138/E-220 Agency coordination Meeting March 2011 “We’re here to get you there!”
ZOM A request for a minor amendment to the existing South Pointe PD (Planned Development) 110 acres West Newberry Road.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Rainier Avenue South Pilot Project Update Seattle Bicycle Advisory Board Project Manager Jim Curtin September 2, 2015.
2010 Bicycle and Pedestrian Work Program Update.  Several top projects from 2008 Work Program have been completed.  Design is ongoing on other top projects.
State Route 268 Rutherford County, TN DESIGN PUBLIC MEETING June 2, 2015.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Madison Avenue Reconstruction Department of Planning and Development.
Metro Highway Program Presentation to CMAA Abdollah Ansari
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
Fairview Avenue North Bridge Replacement Project Seattle Bicycle Advisory Board MariLyn J. Yim, P.E. October 7, 2015.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Pinehurst School Traffic Safety Pinehurst School Traffic Safety Meeting May 13-14, 2014.
MED SR 18 Corridor Project MED PID October 13, 2015.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2015 – 2019 Presentation to Board of County.
HAMILTON COUNTY SR-317 (Bonny Oaks Drive) Widening From SR-17 to I-75 January 21, 2016 Robert Rodgers - C.E. Manager 2 TDOT Region 2 Project Development.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
Phoenix Grand Canalscape Kerry Wilcoxon, P.E., PTOE City of Phoenix Street Transportation Department 65 th Arizona Roads and Streets Conference March 24,
I-80 San Pablo Dam Road Interchange Project – Phase 1.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
CITY OF GLENDALE, CA October 17, 2015 SAFE ROUTES TO SCHOOL – PHASE 3 PROGRAM IMPROVEMENT S ADJACENT TO BENJAMIIN FRANKLIN ELEMENTARY SCHOOL.
8 th Ave S 2016 Pedestrian Improvements South Park Neighborhood Association David Allen, Sue Byers, Alisa Arment April 12, 2016.
2009 Sales Tax Extension Project Status Update. 2 Background Sales Tax was extended via August 26, 2008 referendum. Sales Tax was extended for an additional.
Welcome!. OVERVIEW Limited access reconstruction/relocation of US 31 from US 30 to US 20. The project area includes the communities of LaPaz and Lakeville,
Integrity - Competence - Service Hogan Road/Exit 187 Proposed Improvements Public Informational Meeting June 9, 2016.
APTA Sustainability and Public Transportation Workshop Benjamin Smith
Center City Connector 101.
District 3 Complete Streets Projects
Highway 169 Bridge Replacement & Pavement Resurfacing
PROJ. 566(17) LOR PID MAJOR WIDENING
Coffee & Construction Developer Meeting
Presentation transcript:

Eric Tweit Spring 2014 Mercer Corridor Project: West Phase Project update

SDOT’s mission & vision Mission: delivering a first-rate transportation system for Seattle. Vision: a vibrant Seattle with connected people, places, and products.

SDOT’s values Keep it safe Focus on the basics Build healthy communities Support a thriving economy Provide great service

Presentation overview Project description Schedule Construction update Existing conditions Upcoming changes Broad St. closure

Project description

A better roadway for everyone Wider sidewalks Bicycle path Two-way traffic on Mercer and Roy streets Replace SR 99 Bridge 6

Project schedule

Existing conditions

Replaced bridge over SR 99 Updated utilities Widened Mercer St. to the south Construction Update Mercer underpass 9

New signals ADA improvements Improved sidewalks New trolley poles & wires Construction Update Queen Anne Ave. N to 5 th Ave. N 10

Coming in May and June 11 Mercer and Roy –Two-way between 5 th Ave. N and Queen Anne Ave. N Mercer –Modified two-way (two lanes each direction) between 5 th Ave. N and 9 th Ave. N Broad St. –CLOSED

Phase I Restrictions on Queen Anne Ave. N begin Restrictions on Mercer St. continue

Phase II Two-way traffic on Mercer St. west of 5 th Ave. N open Restrictions on Roy St. begin Restrictions on Queen Anne Ave. N continue

Phase III Broad St. CLOSED Two-way traffic on Mercer St. east of 5 th Ave. N open Two-way traffic on Roy St. open Two-way traffic on Queen Anne Ave. N open

Broad St. closure Fill Broad St. Demo bridge at Mercer St. and Dexter Ave. N Install utilities in Mercer St. and Dexter Ave. N Capacity restrictions at Mercer St. & Dexter Ave. N WSDOT North Access (in Broad St. right-of-way July 1, 2014) Post-closure activities 15

Traffic with Broad St. closed

Questions? | (206) m

Thanks for joining us today!