1 The Louisville - Southern Indiana Ohio River Bridges Project (LSIORBP) 01-30-2014 Real Estate Economic Forecast Two New Bridges, One Project.

Slides:



Advertisements
Similar presentations
March 1, Why an interchange at this location? TH 15 Corridor Study 2007 Nine Signalized intersections Six in Top 50 High Crash Cost Study outcome.
Advertisements

Caltrans District 4 EMERGENCY REPLACEMENT STATE ROUTE 128 RUSSIAN RIVER BRIDGE COMMUNITY INFORMATIONAL MEETING March 9,
Public Meeting Presentation March 15, Project Location Project Purpose –Traffic reliever to I-95 –Integrate road with the Northwest Sector Plan.
Ohio Department of Transportation District 9 I RONTON -R USSELL B RIDGE R EPLACEMENT
Mid-Bay Bridge Connector Phase II and III December 2011 Project Update.
October 9, 2014 Glenn's Bay Road Widening and Interchange Project.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5 The Slow Uphill Climb Matt Bullock, P.E. Chief District Engineer.
West Contra Costa Unified School District
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
Santa Maria River Bridges Widening. Project Location.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
Riverside County Transportation Commission 91 Project Update California Transportation Commission December 10, 2014.
U.S. 33 Northern Connector Alternative
Update of Downtown Rail Improvements DFWI & Chamber Stakeholders February 26, 2014 Alonzo Liñán, PE, PTOE City of Fort Worth.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
I-65 Added Travel Lanes Project in Tippecanoe County
From Island Estates Parkway to St. Johns County Line.
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Poplar Street Bridge City Arch River Consultant Presentation December 16, 2011 Room 160, St. Louis District Office.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Public Involvement Meeting June 11,  Introduce the project  Provide history and current status of the project  Explain the benefits of the project.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Road To Success US 41 WIS 441 Tri-County. Road To Success DBE Workshop and Secretary’s Golden Shovel Awards February 18, 2015.
Illinois state line to Madison Dane and Rock County
Page Avenue What has it done for the region? A comparison of traffic volumes from Fall 2003 to Fall 2004 What has it done for the region? A comparison.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
The Miami Intermodal Center September 23, 2009 Is Becoming a Reality!
CEAL January 31, Existing Alternative (Preferred Align) Objectives SR-76 Corridor Expand Mobility Improve Safety Enhance natural resources Synergy.
TRANSPORTATION AND ECONOMIC DEVELOPMENT LINKAGES PRESENTED BY DEBRA M. SIMMONS WILSON PARSONS BRINCKERHOFF.
Ministry of Transportation Ontario Road Builder’s Association October 20, 2011 Central Region Highway Program.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
Ohio River Bridges Project
DRAFT 1 Significant Changes for the 2006 Constrained Long-Range Plan March 3, 2006.
International Partnership Day.  An SPMT is used for transporting massive structures that are too large or heavy for normal trucks  The SPMT consists.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Presented by: Department of Transportation - Toll Bridge Program New Benicia-Martinez Bridge Project.
Southern Bridge Project Brown County Executive
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Project Update: Airport Freeway, I-820 and I-35W Townhall Meeting for State Representatives Stephanie Klick and Jonathan Stickland Monday, May 12.
Park Lane ZOM Location Map. Park Lane ZOM Aerial.
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project.
Metro Highway Program Presentation to CMAA Abdollah Ansari
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
Federal Project No. BRLO 5951 (151) Bonita School Road Bridge Replacement September XX, 2013 Applicant: Santa Barbara County Public Works Transportation.
MED SR 18 Corridor Project MED PID October 13, 2015.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
Asphalt Pavement Association of Indiana Annual Winter Conference Michael B. Cline Commissioner, INDOT December 14, 2010.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
U.S. ROUTE 202 – SECTION 300 IMPROVEMENT PROJECT East Whiteland Township – Tredyffrin Township Chester County TMACC Information Session January 24, 2011.
DFW Connector Project Main Street Bridge Starting in March 2010 Subject to Change.
Morelli Park Reconstruction and Expansion Project Public Hearing and Award of Construction Contract Stockton City Council and Stockton Redevelopment Agency.
1 CPA Request to expand the Oaks Mall Activity Center and change land use to Mixed Use 87 acres 8000 Block of W Newberry Rd.
Fordham at Columbia as a Grade-Separated Intersection
DICKINSON AVENUE RECONSTRUCTION
Project Overview Multimodal improvements to 22.5 miles of I-66
River to Sea TPO Meeting US 92/International Speedway Boulevard
Highway 169 Bridge Replacement & Pavement Resurfacing
SE 12th Street Roadway Improvements February 8, 2005.
Contract 60X10 Informational Meeting Weber I-55
Southern Bridge Project Brown County Executive
Fordham at Columbia as a Grade-Separated Intersection
Greater Pittsburgh Airport Area Property
Presentation transcript:

1 The Louisville - Southern Indiana Ohio River Bridges Project (LSIORBP) Real Estate Economic Forecast Two New Bridges, One Project

2 Area Map Two New Bridges, One Project

3 The Bridges Project

4 Bottom line: Improve cross-river mobility Safety problems Traffic congestion Inefficient mobility Inadequate system linkage Planning consistency Purpose and Need

5 Downtown Crossing Date (go to View, Header & Footer to edit) Two New Bridges, One Project

6 Existing Kennedy Interchange

7 Proposed Kennedy Interchange

8 New I-65 Downtown Bridge Six lanes of NB I-65 traffic Located East of the Existing Kennedy Bridge 99 Feet wide 2,114 feet long with 3 towers 71 feet above water

9 Deck Reconfiguration  Convert to SB Only  Deck Reconstruction New SB Approach Spans Section 2 – Downtown Bridge Existing JFK Bridge Rehab

10 Downtown Crossing - Indiana Reconstructs I-65 to add additional lanes Reconstructs approaches to the Clark Memorial Bridge to permit more direct access to I-65 Two New Bridges, One Project

11 East End Crossing 4B Kentucky Approach: reconstruction and new terrain road on KY 841 Section 4A: from the southern limit of Section 4 to the northerly abutment of the proposed Harrods Creek/River Road bridge; this section includes the Drumanard Tunnel Section 4B: from the north end of Section 4A to the new East End Ohio River Bridge 4 4 A B 4A 11

12 East End Crossing East End Bridge: A new four-lane Ohio River bridge with a pedestrian walkway and bikeway, opening to traffic in late 2016 (capable of being expanded to six lanes with only striping) 5 12

13 East End Crossing Indiana Approach: Construction of a new roadway from the existing SR 265/SR62/Port Road Interchange to the new East End Bridge New interchange at Salem Road 6 13

14 Project Schedule Downtown Crossing December 28, 2012 – Contract Awarded To Walsh December 2016 – Construction Completion East End Crossing December 27, 2012 – Commercial Close to the Walsh – Vinci – Bilfinger (WVB) Team March 28, 2013 – Commercial Close October 2016 – Construction Completion Date (go to View, Header & Footer to edit) Two New Bridges, One Project

15 Web Page Two New Bridges, One Project