October 28, 2002 International Loran Association Development of a Next Generation Transmitter Control System Presented by: Terry YetskoBCO, Inc. George.

Slides:



Advertisements
Similar presentations
Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
Advertisements

CIS 376 Bruce R. Maxim UM-Dearborn
Software Modeling SWE5441 Lecture 3 Eng. Mohammed Timraz
Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
1 ITC242 – Introduction to Data Communications Week 12 Topic 18 Chapter 19 Network Management.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
DP Cabinet.
The Technion Israeli Institute of Technology Intel Inc. A cooperation of:
 A system consisting of a number of remote terminal units (or RTUs) collecting field data connected back to a master station via a communications system.
Linac 4 LL RF Hardware Architecture and Design Status
All content in this presentation is protected – © 2008 American Power Conversion Corporation Symmetra ® LX – redundant UPS High performance, redundant.
Loran Integrity Performance Panel Integrity Fault Tree for Loran Sherman Lo Second LORIPP Meeting Portland, OR September 23-24, 2002.
V-1 TFE: The New Heartbeat of Loran T. P. Celano, Timing Solutions Corporation LT Kevin Carroll, Loran Support Unit.
Waveform 2.1 Basic Digital Waveforms 2 Measurement Paul Godin Updated October 2009.
System Elements HighPoint Broadband Delivery System Sector 1 Sector 3
Department of Electrical and Computer Engineering Lighting Tool Box Winter 2004 ECE 498 Team Members: Nick Sitarski Blaine Thompson Brandon Harris Dave.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
© 2001 Business & Information Systems 2/e1 Chapter 13 Developing and Managing Information Systems.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
Improve Control Room Monitoring…
October 29, 2002 International Loran Association Design and Test of the First Article Accufix 7500 Transmitter Presented by Mark Danieli.
October 28, 2002 International Loran Association Modernization of Nii Jima Transmitter Control Presented by Michael Weisenbloom.
Advances In Millimeter Wave Measurements Banded Differential and Pulse Measurements.
Chapter 12: Systems Investigation and Analysis. Agenda  How to Develop a CBIS?  Systems Development Life Cycle (SDLC)  Prototyping  Join Application.
The Control System for the Caltech Millimeter Array Steve Scott OVRO.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
Lab Group L2Bx EECE 380 – Electrical Engineering Design Studio (Spring 2014) 1 Spectrum Analyzer Michael Halpenny-Mason, Presenter 2, Presenter 3, Presenter.
Topics of presentation
McGraw-Hill © 2008 The McGraw-Hill Companies, Inc. All rights reserved. Principles of Electronic Communication Systems FM Circuits.
Controls-related R&D options Etienne CARLIER 18 th ABTEF meeting
September 19-20, 2007 A.Zaltsman EBIS RF Systems RF System Overview Alex Zaltsman September 19-20, 2007 DOE Annual Review.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
Issues in Accelerator Control Bob Dalesio, December 23, 2002.
The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli, Stephen Foulkes, Margaret Votava and Charles Briegel Fermi National Accelerator.
Timing Requirements for Spallation Neutron Sources Timing system clock synchronized to the storage ring’s revolution frequency. –LANSCE: MHz.
An Open Architecture for an Embedded Signal Processing Subsystem
Vidya Bharathi Institute of Technology
Present Uses of the Fermilab Digital Signal Receiver VXI Module Brian Chase,Paul Joireman, Philip Varghese RF Embedded Systems (LLRF) Group.
IMAGE DATA ACQUISITION
The recent history and current state of the linac control system Tom Himel Dec 1,
Review of Parnas’ Criteria for Decomposing Systems into Modules Zheng Wang, Yuan Zhang Michigan State University 04/19/2002.
CONTENTS: 1.Abstract. 2.Objective. 3.Block diagram. 4.Methodology. 5.Advantages and Disadvantages. 6.Applications. 7.Conclusion.
"... To design the control system that effectively matches the plant requires an understanding of the plant rivaling that of the plant's designers, operators,
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
Modernizing Loran Command and Control U.S. Coast Guard Loran Support Unit Pacific Ave. Wildwood, NJ Raymond Agostini James R. Betz International.
Pickering’s Experience of LXI Switching Applications David Owen Business Development Manager, Pickering Interfaces
Photonic Components Rob Johnson Standards Engineering Manager 10th July 2002 Rob Johnson Standards Engineering Manager 10th July 2002.
Closed Loop Temperature Control Circuit with LCD Display Mike Wooldridge ECE 4330 Embedded Systems.
BLDC Motor Speed Control with RPM Display. Introduction BLDC Motor Speed Control with RPM Display  The main objective of this.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
Copyright © Central Lincoln PUD and SEL 2015 Communications-Capable Fault Indicators Improve Outage Response for Coastal Oregon Shamus Gamache Central.
Antenna Arrays and Automotive Applications
FUNCTION GENERATOR.
AVAPS I to AVAPS II - Chassis Hardware & Flight Software Changes April 28 th & 29 th, 2009 AVAPS Users Group Meeting Dean Lauritsen.
4m. Blanco TCS Upgrade: Signals and Interfaces
System Design, Implementation and Review
4m. Blanco TCS Upgrade: Electronic Status at March/2010
Communications in Railway Centralized Traffic Control Systems
FAULT TOLERANCE TECHNIQUE USED IN SEAWOLF SUBMARINE
Redundancy Switching Components
Enclosed Parking Ventilation 1 EK Engineering (India) CO/NO2 detection, Fan Control and automation System E: Mobile:
4m. Blanco TCS Upgrade: Signals and Interfaces
Telecommunications Engineering Topic 2: Modulation and FDMA
AM-7027 Up Converter-Amplifier
SN-553 Frequency Synthesizer
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
Presentation transcript:

October 28, 2002 International Loran Association Development of a Next Generation Transmitter Control System Presented by: Terry YetskoBCO, Inc. George MukaiBCO, Inc. Erik JohannessenMegapulse, Inc.

Need for Modernized Transmitter Control Significant upgrade required both in functional capability and technology. Required as part of Loran recap effort. –Present SSX control console over 20 years old. Not supportable long term. Maintainability/reliability do not lend themselves to unattended operation. –Present SSX control console does not support required Loran enhancements. Present architecture robust but inflexible. System demands on the system are greater in the future. –Better timing. –Better envelope control.

TCS Design Philosophy Retained Existing Partitioning at System Level –GFE Loran Timer, Remote Control, Control Console and Power Distribution –XMTR Components - PGAs, Output & Coupling Networks, RF Switch Retained Existing Functionality –Replaced TOPCO, PATCO, SDA and Display Units with modernized/updated sub-assemblies Incorporated New Functionality –Support for Additional Drive Half Cycles –Dynamic Re-Assignment of HCGs –Real-Time Loran Signal Quality Analysis (SQA) Allowed for Future Capabilities –Intrapulse Frequency Modulation (IFM) –Enhanced Data Analysis

TCS Design Philosophy Rate A & B MPT, Set/Reset & 5 MHz MTS Antenna Switch Output Network (Unit 4) Coupling Network (Unit 5) Output Network (Unit 4) Coupling Network (Unit 5) RF Switch Pulse Generator (Unit 3) Antenna DHC Feedback Antenna Current Feedback FromTimer (Unit 1) Switch Control MTS Timing Signals PATCO TOPCO SDA DHC Current Pulse Switch Network (Unit 6) RF Output

TCS Block Diagram

Transmitter Control Subsystem (TCS) Alarm/Status Panel Thinview-15-SS9-RM-SP410 15” Touchscreen Display Retractable Keyboard Tray Kontron(ICS) RMX-EKB104 TCA (Transmitter Control Assembly) APC SU042-2 Redundant Switch APC Smart-UPS 3000 RM 5U Rear Mount Fan Assemblies Control Connector Assembly(s) TCC (Transmitter Control Console) #1 TCC (Transmitter Control Console) #2 Redundant Transmitter Control Consoles Fire Detect Assys

TCA – Block Diagram

TCA – VME Chassis 20 Slot Chassis Five COTS (Commercial-Off- The-Shelf) 6U VME Cards Three COTS PMC (PCI Mezzanine Card) Modules Two Custom VME Cards: One Custom PCI Daughter Card for HCG Control One Custom VME Card for Signal Conditioning, Qty 4 A B C DE Five Functional Groups

HCG/Serial Data Stream Control Group (HCG/SDSC) Majority of PATCO, TOPCO and Signal Distribution Assembly (SDA) functionality combined into one (1) custom VME Card married to: Motorola MVME MHz PPC Processor ICS MHz Dual Channel Data Acquisition Module. PATCO functions: timing and triggering, failsafe blanking, DHC feedback analysis, MTS data stream generation, polarity control, antenna feedback analysis and antenna tuning TOPCO functions: fault monitoring and analysis SDA functions: MTS data stream multiplexing PATCO TOPCO SDA

HCG/SDSC Block Diagram

TCS – Main Station Control Screen

TCS – Station Configuration Screen

TCS – Loop Maintenance Screen

TCS – Engineering Screens

Control Loop Algorithm - Amplitude Current system uses ratios to a reference voltage to control all 4 DHC amplitudes –Both ratios and reference voltages are thumbwheel selectable. –Adjustments to the reference voltage controls output power. Ratios still utilized for DHC 2, 3 & 4. –Ratios are contained in ECD table. Measurements made on 6 th pulse in group (like current system). –Potential expansion to analyze all pulses (droop compensation). DHC 1 adjusted based on power indication from antenna feedback. –Control loop is now closed based on system output as opposed to interim feedback (DHC feedback). –Control loops now compensate for variability in network cabinets.

Control Loop Algorithm - Timing Original timing loops utilized hardware implementation based on 60 % points. –Software algorithm currently maintains that approach but could be enhanced to be less sensitive to pulse shape. Configurable items provide flexibility. –Averaging period and adjustment step size –DHC Timing Position Currently set to offset DHC 2,3,4 150nsec, 100 nsec and 100 nsec respectively to improve phase modulation. –Potential expansion to base offsets either on ECD selection or analysis of antenna feedback. Fixed offsets added to DHC timing for individual pulses in each group. –Potential enhancement to base offset on feedback analysis of individual pulses.

Control Loop Algorithm - Tuning Original antenna tuning based on 5 th to 12 th 0-crossing. Analysis showed more accurate measurement achieved starting at 6 th 0-crossing. Algorithm modified to tune based on 6 th to 12th crossing. –Crossings are configurable to provide flexibility. –Similar slope crossings chosen to minimize error caused by feedback offset. Averaging period and adjustment time also configurable.

SQA Functionality Hardware implementation using 65 MHz Data Acquisition Module provided capability for detailed analysis of antenna feedback. –Amplitude control loops are partially based on antenna feedback. –Lordac functionality is embedded in the control system software. –Analysis of signal quality is used in redundancy and failure analysis decisions. Potential enhancements involve analysis of antenna feedback being applied to: –Pulse to pulse timing and amplitude control. –ECD control.

MVME 2400 Data Processing – Dual Rate

MVME 2400 Data Processing – Single GRI

Summary High utilization of COTS components. –Open system architecture. Partitioning and functional capability provides: –Performance required for the new system. –Allows easy integration into legacy systems. Remote/unattended operation. Graphical user interface provides: –Ease of use. –High visibility into system operation. –Flexible control. Enhanced data analysis and control. –Horsepower for expansion/enhancement.