Yokogawa Electric Corporation 2-9-32 Nakacho, Musashino-shi Tokyo, 180-8750 JAPAN Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation.

Slides:



Advertisements
Similar presentations
Yokogawa Network Solutions Presents:
Advertisements

IBM SMB Software Group ® ibm.com/software/smb Maintain Hardware Platform Health An IT Services Management Infrastructure Solution.
Introduction What is the PCIMS ? PCIMS :Process Control Information Management System Each plant as an individual process area shall consist of an integrated.
Legacy Hardware and Software Upgrade Overview
Exaquantum R2.60 Enhancements
Arecibo Telescope Servo & Drive System Technical Meeting May 2004 VERTEX ANTENNENTECHNIK GmbH Arecibo Telescope Servo Drive System Ideas For Computer.
FIU Chapter 7: Input/Output Jerome Crooks Panyawat Chiamprasert
MET ONE 7000 Series Remote Airborne Particle Counters Customer Name Date Presenter Presenter Title.
Applying Wireless in Legacy Systems
Networking and Internetworking Devices Networks and Protocols Prepared by: TGK First Prepared on: Last Modified on: Quality checked by: Copyright 2009.
Integrating S into your Product Lifecycle
Distributed Control Systems Emad Ali Chemical Engineering Department King SAUD University.
Introduction What is the PCIMS ? PCIMS :Process Control Information Management System Each plant as an individual process area shall consist of an integrated.
Building an Application Server for Home Network based on Android Platform Yi-hsien Liao Supervised by : Dr. Chao-huang Wei Department of Electrical Engineering.
New Generation Automation Controller (PAC) Overview and Trend eAutomation Group Γιάννης Στάβαρης Technical Manager Ιούνιος 26, 2007.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Symmetra ® LX – redundant UPS High performance, redundant.
SCADA and Telemetry Presented By:.
1. 2 How do I verify that my plant network is OK? Manually: Watch link lights and traffic indicators… Electronically: Purchase a SNMP management software.
Hands-On Microsoft Windows Server 2008 Chapter 1 Introduction to Windows Server 2008.
Chapter 4.  Understand network connectivity.  Peer-to-Peer network & Client-Server network  Understand network topology  Star, Bus & Ring topology.
GeoVision Solutions Storage Management & Backup. ๏ RAID - Redundant Array of Independent (or Inexpensive) Disks ๏ Combines multiple disk drives into a.
Network Design Essentials
Chapter 4: Computer Networks Department of Computer Science Foundation Year Program Umm Alqura University, Makkah Computer Skills /1436.
NETWORK Topologies An Introduction.
Information Technology Lecture No 3 By: Khurram Shahid.
Yokogawa Indonesia < Document Number> Copyright © 2004, Yokogawa Indonesia Continuous Solution Support for Centum XL Centum XL Migration to CS3000 Presentation.
Network Monitoring using OPC - (OLE) for Process Control Project Advisor : Dr. Chung-E-Wang Prepared By: Bhumi Patel.
Module 7: Fundamentals of Administering Windows Server 2008.
DeviceNet Solution December, 2003
October 28, 2002 International Loran Association Modernization of Nii Jima Transmitter Control Presented by Michael Weisenbloom.
1 Product & Technology Quality Excellence Support American Global Products Product & Technology TeSysPort Ethernet Interface for TeSys June 5, 2007.
Yokogawa’s FIELDBUS solution
 AUTOMATION  PLC  SCADA  INSTRUMENTATION  DRIVES & MOTORS.
Chapter 6 – Connectivity Devices
Exaopc OPC Interface Package Presentation Material
Yokogawa Electric Corporation ISD-MASP-S03060 Rev.2 Copyright © Yokogawa Electric Corporation October 17, 2003 Solution Marketing Group International Business.
Yokogawa Electric Corporation Copyright © Yokogawa Electric Corporation DCS Software Printer Package August, 2003.
Yokogawa Electric Corporation ISD-MASP-S05010 Copyright © Yokogawa Electric Corporation February 16, 2005 Solution Marketing Group Industrial Automation.
Topics of presentation
Grounding / Earthing scheme for DCS – CS3000 R3 FIO System
Honeywell PKS R210 System overview May 2005 (Rev.1)
M340 Modbus Plus Proxy Link legacy systems to Ethernet
Yokogawa Electric Corporation ISD-MASP-S03065 Rev.2 Copyright © Yokogawa Electric Corporation December 2, 2003 Solution Marketing Group International Business.
Marketing Department Industrial Automation Business Headquarters Yokogawa Electric Corporation ISD-MASP-S05043 Copyright © Yokogawa Electric Corporation.
CPAC May 2005 John Mosher – Honeywell Sensing & Control Sensor Actuator Manager (SAM) Controller Considerations And Specification Identification.
VARAN Bus Presentation 1 / 27 The VARAN BUS.
ISD-MASP-S05026 Copyright © Yokogawa Electric Corporation May 2005 Page 1 Honeywell PKS R300 -System quick review June 2005 (Rev. 2) SAMURAI Activities,
Yokogawa Electric Corporation Copyright © Yokogawa Electric Corporation 21 CFR Part 11 Support for CS1000/3000.
CENTUM CS 3000 R3.04 PROFIBUS Interface Module
©2002 B&R Controls Technology. B&R Control Systems Always one software – Compatible with all PLCs No matter which form factor or performance Classical.
Yokogawa Electric Corporation Solution Marketing Gr., International Business Headquarters Copyright © Yokogawa Electric Corporation April 3, 2003-Rev2.
Copyright © Yokogawa Electric Corporation FDT Technology “one tool for all” September 26, 2006 Yokogawa Electric Corporation.
Systems Solution Marketing Group Industrial Automation Business Headquarters Yokogawa Electric Corporation ISD-MASP-S05011 Copyright © Yokogawa Electric.
New product introduction:
NETWORK TOPOLOGY Network topology is the study of the arrangement or mapping of the elements of a network,especially the physical.
1 Device Controller I/O units typically consist of A mechanical component: the device itself An electronic component: the device controller or adapter.
Mr. Sathish Kumar. M Department of Electronics and Communication Engineering I’ve learned that people will forget what you said, people will forget what.
By the end of this lesson you will be able to explain: 1. Identify the support categories for reported computer problems 2. Use Remote Assistance to connect.
Class Notes CS403- Internet Technology Prepared by: Gulrez Alam Khan.
Chapter Seven Network Topology [tə'p ɒ ləd ʒɪ ]. In networking, the term “topology” refers to the layout of connected devices on a network. This article.
Xxx Presentation, No 1 Copyright © TAC AB Engineering Classic Networks1.
IC3 GS3 Standard COMPUTING FUNDAMENTALS Module
How SCADA Systems Work?.
Programmable Logic Controllers (PLCs) An Overview.
The New RAPID TPM A NEW PLATFORM FOR TURBO PETROL ENGINES Leading name in the world of the additional module applied to Turbo Diesel engines for over.
PLC Hardware Components.
FIRELEC Migration Solution
Presentation transcript:

Yokogawa Electric Corporation Nakacho, Musashino-shi Tokyo, JAPAN Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation DCS with long life Yokogawa’s Migration Path October 22, 2015

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… Important issues for long life DCS. Using DCS for a long time, the following items become more and more important. –System Deterioration Due to Aging. –Out-of-date Functions. –Increasing System Maintenance Cost. You cannot avoid to renew your DCS to make your total cost lower. HOWEVER......

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… System Deterioration Due to Aging. System deterioration can be generally predicted below. Time Failure rate Required reliability (allowable failure rate) End-of-life cycle Shift toward deterioration cycle Coincident failure cycle Deterioration curve To minimize the fall in plant operation rate (business loss) caused by aging, costly spare parts and maintenance checks are necessary. System failure rate =  i x N i : Parts failure rate N: Number of Parts Based on environmental condition, becomes more due to aging.

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… Out-of-date Functions. New technologies are established after introducing the existing systems. –OPC, Fieldbus, Network of MS-Windows, etc. For production systems, there are the increasing requirements, such as below. –Hot link with business domain, such as ERP, PIMS, MES. –Improvement manual operation with AOA software. –Optimization with Fieldbus system and total asset management. –Remote solution for control, operation, and maintenance. To remain in competitive market, it is necessary to catch up with the technology innovation.

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… Increasing System Maintenance Cost. Because of the quick innovation of parts, parts manufacturers tend to discontinue supplying. –It occurs frequently especially for DCS basic parts, such as CPU, HDD, IC, etc. The longer time pasts after the release, it becomes more and more difficult to provide the parts of the DCS with reasonable cost. For long term steady DCS operation, it is necessary to consider the supplement ability of maintenance parts.

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… In case of “Scrap & Build”, Advantages: –The latest technologies can be used. –System life becomes longer. Disadvantages: –Full installation cost is necessary at once. –You need to consider your application assets. –How to use is changed suddenly, so particularly operators may feel uncomfortable, at first. Yokogawa’s MIGRATION solution is to minimize disadvantages without missing advantages.

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… Key points of Yokogawa's Migration Step by step –Only the portion with shorter life parts can be renewed with remaining other portion. –Divide renewing cost. Reuse the existing assets. –Field cable wiring. –Field devices. –Application database. Shorten stopping time for migration work. –Longer stopping time directly leads to larger loss of your business chance.

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… Yokogawa’s Migration Path. CENTUM CS Micro-XL CENTUM V CENTUM-XL

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… Yokogawa’s Migration Path. CENTUM V, CENTUM-XL –Migrate to the latest CS3000 R3 system with 3 steps. Step 1 : HMI migration Step 2 : Controller migration Step 3 : I/O portion migration

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… Solution with Migration step 1 Ethernet Vnet HIS COPSV, EOPS are no longer necessary. It is not necessary to modify FCS and I/O. HISs works instead of COPSV, EOPS All tag data of the existing FCSs can be operated from HIS. (Read/Write is OK.) Operators need not recognize whether the tag is the existing FCSs’ or CS3000 FCSs’. Operation keyboard and touch panel are available. OPC server All process data is handled as CS3000 data. Operation improvement with AOA function. Seamless connection with PIMS. Audit trail Remote operation Bus converter

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… How to connect. Ethernet Vnet HIS FCSs do not be affected at all. As HF bus is redundant, the communication does not stop when connecting Vnet -- HF bus. Tags are registered in CS3000 builder. Builder Download tag information to each HIS. Process operation is not stopped when connecting HISs.

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… Connection without communication stop Terminator HF bus line-1 HF bus line-2 FCS Vnet Bus converter (1) 1 set of HF bus are connected to a bus converter. (2) Remove a terminator of the existing HF bus. (In this case, HF bus line-1 is still working.) (3) Connect the HF bus cable from the bus converter. (4) Remove the other terminator of the existing HF bus. (In this case, HF bus line-2 is still working.) (5) Connect the HF bus cable from the bus converter.

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… What are benefit at Step 1 ? Step 1: HMI Migration –Dramatically reduced the anxiety of parts supplement. HMI includes the shorter life parts, such as CRT, HDD. As CS3000 HMI is based on generic PC, it is easy to supply these parts. –You can utilize the latest Windows technologies. Because CS3000 R3 works on MS-Windows2000 and will be able to work on WindowsXP. –Seamless connectivity with various kinds of the latest business domain systems. HIS (R3 HMI) has OPC interface. Most of MES, PIMS, and CMMS have OPC interface. –Operation improvement with AOA software in HIS. AOA (Advanced Operation Assistance) can improve your manual operation.

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… Solution with Migration step 2 Ethernet Vnet HIS It is not need to modify I/O nests, signal conditioners, and field wiring at all. CS3000 FCU has the interface for the I/O bus of CENTUM-XL and V. You can connect the existing I/O nests to CS3000 FCU. Field wiring cables need not changed at all. CS3000 control logics can be connected to XL, V I/O. OPC server FCU is used instead of SCN. Control logics (Loop, sequence) works as CS3000 control function. Much more availablity with Pair&Spare technology. Connected on Vnet.

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… Solution with migration Step2 Existing CENTUM-XL (Front)(Rear) (Field) Internal bus

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… Solution with migration Step2 (Field) (Front)(Rear) CS3000 XL SCN Internal bus

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… Solution with migration Step2 Same Interface connector SI31SI301 (Field) (Front)(Rear) CS3000 Internal bus XL SCN

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… Solution with migration Step2 (Field) (Front)(Rear) CS3000 Internal bus ESB bus CS3000 FIO subsystem

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… How to connect. Ethernet Vnet HIS You can change FCUs one by one without affecting other FCSs at all. Builder Download control logics to each FCS. Process operation by other FCUs is not stopped when replacing an FCU. Control loops, Sequence, etc. Control logics Converted as CS3000 application. Control Logics Save

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… What are benefit at Step 2 ? Step 2: Controller Migration –Much Larger application capacity. –Much quicker processing. Short turn around to improve control ability. More control logics can be used. –The batch system complied with ISA S88. –Much more reliability. Pair & Spare mechanism to detect not only the hardware abnormalities, but also software abnormalities, such as the error by transient noise. –Much more number of I/O point. FIO subsystems can be additionally connected. –Much more visualized control logics. Not only decision tables, but logic chart, SFC, are available. The work status of these logics can be displayed on HIS.

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… Solution with Migration step 3 Ethernet Vnet HISOPC server Renew I/O portion to R3 FIO subsystem. Front connector of FIO modules is same as existing I/O cards. Field wiring can be remain.

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… Hardware continuity (Front)(Rear) Same connector is available. Field wiring is NO CHANGE Field wiring Compatible modules with the existing. Same size as the existing. Controller hardware can be renewed to R3 without changing field wiring. In case of CENTUM V, CENTUM-XL

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… What are benefit at Step 3 ? Step 3: I/O portion Migration –Much more reliability. All modules can be redundant. –Much more number of I/O point. –You can extend the functionality with new technologies. FOUNDATION Fieldbus solution. Remote I/O installation. Connectivity with various types of 3’rd party subsystems. Even at Step 3, you need not rewire the field cables. –Yokogawa will continue supplying the signal conditioners. Migration story completes !

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… Yokogawa’s Migration Path. CENTUM CS –Migrate to the latest CS3000 R3 system with 2 steps. Step 1 : HMI migration Step 2 : Controller migration –Integrate with the latest CS3000 R3 system

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… Solution with Migration step 1 Ethernet Vnet HIS ICSs are no longer necessary. It is not necessary to modify FCS and I/O. HISs works instead of ICS All tag data of the existing FCSs can be operated from HIS. (Read/Write is OK.) Operators need not recognize whether the tag is the existing FCSs’ or CS3000 FCSs’. Operation keyboard and touch panel are available. OPC server All process data is handled as CS3000 data. Operation improvement with AOA function. Seamless connection with PIMS. Audit trail Remote operation CS FCS EWS

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… How to connect. Ethernet Vnet HISOPC server CS FCS EWS Builder FCSs are not affected at all. Process operation is not stopped when connecting HISs. As Vnet is redundant, the communication does not stop when connecting replacing ICS to HIS. The ICS graphics can be imported into CS3000 HIS Tags are equalized in CS3000 builder.

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… What are benefit at Step 1 ? Step 1: HMI Migration –Dramatically reduced the anxiety of parts supplement. HMI includes the shorter life parts, such as CRT, HDD. As CS3000 HMI is based on generic PC, it is easy to supply these parts. –You can utilize the latest Windows technologies. Because CS3000 R3 works on MS-Windows2000 and will be able to work on WindowsXP. –Seamless connectivity with various kinds of the latest business domain systems. HIS (R3 HMI) has OPC interface without any gateways. Most of MES, PIMS, and CMMS have OPC interface. –Operation improvement with AOA software in HIS. AOA (Advanced Operation Assistance) can improve your manual operation.

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… Solution with Migration step 2 Ethernet Vnet HIS As RIO can be used also in CS3000, it is not necessary to modify I/O portion, and field wiring at all. CS3000 FCU has the interface for RIO. You can connect the existing I/O nests to CS3000 FCU. Field wiring cables need not changed at all. OPC server FCU is migrated to the latest one. Control logics (Loop, sequence) works as CS3000 control function.

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… How to connect. Ethernet Vnet HIS You can change FCUs one by one without affecting other FCSs at all. Builder Download control logics to each FCS. Process operation by other FCUs is not stopped when replacing an FCU. Control loops, Sequence, etc. Control logics Converted as CS3000 application. Control Logics Save

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… What are benefit at Step 2 ? Step 2: Controller Migration –Much Larger application capacity. –Much quicker processing. Short turn around to improve control ability. –Much more number of I/O point. –You can extend the functionality with new technologies. FOUNDATION Fieldbus solution.

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… Yokogawa’s Migration Path. MicroXL –Migrate to the latest CS3000 system with 2 steps. Step 1 : HMI migration Step 2 : Controller migration

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… Solution with Migration step 1 Ethernet Vnet HIS MOPSs are no longer necessary. It is not necessary to modify FCS and I/O. HISs works instead of MOPS All tag data of the existing FCSs can be operated from HIS. (Read/Write is OK.) Operators need not recognize whether the tag is MicroXL’s or CS3000 FCSs’. Operation keyboard and touch panel are available. OPC server All process data is handled as CS3000 data. Operation improvement with AOA function. Seamless connection with PIMS. Audit trail Remote operation Bus converter

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… How to connect. Ethernet Vnet HIS FCSs are not affected at all. If RL bus is redundant, the communication does not stop when connecting Vnet -- RL bus. Tags are registered in CS3000 builder. Builder Download tag information to each HIS. Process operation is not stopped when connecting HISs.

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… Connection without communication stop Terminator RL bus line-1 RL bus line-2 FCS Vnet Bus converter (1) 1 set of RL bus are connected to a bus converter. (2) Remove a terminator of the existing RL bus. (In this case, RL bus line-1 is still working.) (3) Connect the RL bus cable from the bus converter. (4) Remove the other terminator of the existing RL bus. (In this case, RL bus line-2 is still working.) (5) Connect the RL bus cable from the bus converter.

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… What are benefit at Step 1 ? Step 1: HMI Migration –Dramatically reduced the anxiety of parts supplement. HMI includes the shorter life parts, such as CRT, HDD. As CS3000 HMI is based on generic PC, it is easy to supply these parts. –You can utilize the latest Windows technologies. Because CS3000 R3 works on MS-Windows2000 and will be able to work on WindowsXP. –Seamless connectivity with various kinds of the latest business domain systems. HIS (R3 HMI) has OPC interface. Most of MES, PIMS, and CMMS have OPC interface. –Operation improvement with AOA software in HIS. AOA (Advanced Operation Assistance) can improve your manual operation.

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… Solution with Migration step 2 Ethernet Vnet HIS It is not need to modify most of signal conditioners, and field wiring at all. OPC server Migrate MicroXL FCS to FFCS Control logics (Loop, sequence) works as CS3000 control function. Connected on Vnet. Field wiring cables can be remain. FFCS

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… How to connect. Ethernet Vnet HIS You can change FCUs one by one without affecting other FCSs at all. Builder Download control logics to each FCS. Process operation by other FCUs is not stopped when replacing an FCU. Control loops, Sequence, etc. Control logics Converted as CS3000 application. Control Logics Save

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… Hardware continuity (Front)(Rear) Same connector is available. Field wiring is NO CHANGE Field wiring Controller hardware can be renewed to R3 without changing field wiring. Compatible modules with the existing. Same size as the existing.

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… What are benefit at Step 2 ? Step 2: Controller Migration –Much Larger application capacity. –Much quicker processing. Short turn around to improve control ability. More control logics can be used. –The batch system complied with ISA S88. –You can extend the functionality with new technologies. FOUNDATION Fieldbus solution. –Much more visualized control logics. Not only decision tables, but logic chart, SFC, are available. The work status of these logics can be displayed on HIS.

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… Operation Continuity CS3000 can provide quite similar operation environment to the existing operation. –Same kinds of screens, such as overview, trend, tuning, and graphic, are available. –Console, touch-screen are available. –Operation keyboard is available. –Operator needs not recognize that each tag belongs to CS3000 or to the existing systems. Operators can smoothly start their work HIS instead of the existing HMI.

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… Shorten Stopping Period. We have prepared application conversion procedure Yokogawa inside. –We need not RECREATE your application, such as sequence, control logic, etc. You need not wait for the delivery of FCS before starting your debugging. –Yokogawa has Virtual Test function to debug the control application only with a PC.

Yokogawa Electric Corporation Copyright © by Yokogawa Electric Corporation Proprietary info goes here… Conclusion By Yokogawa’s Migration solution, your DCS will become a dramatically longer life system with much more capability. You can reduce your TCO (Total Cost Ownership).