18 th GIST Meeting 14 th –16 th May 2003 Ground Segment (GGSPS) Report 1 Commissioning update B.C.Stewart RAL.

Slides:



Advertisements
Similar presentations
GERB SW fluxes: an update (Clear ocean SW radiances and fluxes in the reprocessed V999 June 04 data) Cédric Bertrand GIST th December, Imperial.
Advertisements

GERB Operations: Status Report J. Rufus GIST 26 Coseners House, RAL. 3 rd May 2007 © Imperial College London.
Spacecraft in normal Mission Mode, all systems nominal
Clouds and the Earth’s Radiant Energy System NASA Langley Research Center / Atmospheric Sciences Methodology to compare GERB- CERES filtered radiances.
Calibration commissioning 16/01/2003: Extended ‘Normal mode’ 282 columns 22/01/2003: TOTAL forward and reverse scans ~11:00-12:15 23/01/2003:Earth stare.
1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.
In-orbit calibration (TOTAL channel) V space -V IBB Raw Earth V (counts) Raw IBB V (counts) =
CERES-GERB Joint Science Teams The Geostationary Earth Radiation Budget (GERB) experiment GERB Status Imperial College London J E Harries (GERB.
Plans for interim data release J E Russell (Imperial)
Use of GPS RO in Operations at NCEP
Level 1.5 Processing Issues Martin Bates RAL. Level 1.5 Processing Issues Geolocation –Current Status –TSOL Jitter (CSOL-TSOL) correction –Longterm TSOL.
Level 1.5 Processing Updates Martin Bates, RAL GIST th December, 2005.
© Imperial College LondonPage 1 Operations Report/ Operational Calibration Strategy GIST 19, RAL 28th August 2003 J A Hanafin.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
Cormac Neeson Space Engineering and Technology GERB Project Status 22/03/2004.
GIST May 2007 Page 1 MSG PROGRAMME STATUS Presentation to the GIST-26 meeting.
GIST 23 DWD, 27-29th Apr 2005 GGSPS development and operations Andy Smith RAL.
MSG, GERB calibration and data status May ‘07 J E Russell Imperial College, London
GIST th -16 th Dec B.Stewart RAL Mirror Anomaly Review Board Update.
19 th GIST Meeting 27 th –29 th August 2003 GERB mirror mechanism 1 GERB mirror mechanism, pointing and repeatability (Tech Note MSG-RAL-GE-TN-2011) B.C.Stewart.
GERB 4 Instrument Status GIST 25 23rd October 2006 Presenter: N Morris.
19th GIST 27 th -29 th August 2003 E Sawyer RAL Status of GERB1,2,3 and 4 Battery issues Operations during eclipse Stray light NOT bearing life test.
Torsten Böker TIPS May 2, 2002 NICMOS post-cooldown detector performance 1) SMOV status 2) Dark current 3) Quantum efficiency 4) “First light”, focus and.
GIST 19: GGSPS status Status of GGSPS development and operations Andy Smith GGSPS software project manager.
GIST 24 Meeting GERB Hardware Status 14 th December 2005 Eric Sawyer.
PVPhotFlux PACS Photometer photometric calibration MPIA PACS Commissioning and PV Phase Plan Review 21 st – 22 nd January 2009, MPE Garching Markus Nielbock.
GIST October 2006 Page 1 MSG PROGRAMME STATUS Presentation to the GIST-25 meeting.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA SMOV4 Requirements Review Cosmic Origins Spectrograph Scott D. Friedman STScI 30 July 2003.
PSF in-flight calibration - PN IFC/CNRRingberg, April 2-4, 2002 PSF in-flight calibration for PN camera Simona Ghizzardi Silvano Molendi.
© Imperial College LondonPage 1 Calibration Commissioning Report GIST 19 RAL, 27th August 2003 GERB Instrument Team & Operations Team.
GIST-24 Meeting December MSG PROGRAMME STATUS Presentation to the GIST-24 meeting.
RMIB involvement in the Geostationary Earth Radiation Budget (GERB) and Climate Monitoring SAF projects Nicolas Clerbaux Remote sensing from Space Division.
Geolocation Tuning and Status Geolocation Accuracy of Available Data Problems –E-W, N-S Centering –Discrepancies Comparing with RGP –Axis Misalignments.
Product status and timeline Andy Smith RAL. User products The GGSPS provides user access to the following products: Level 1.5 NANRG, ARG Level 2 ARG (and.
18 th GIST Meeting 14 th –16 th May 2003 Ground Segment (GGSPS) Report 1 GERB Ground Segment B.C.Stewart RAL.
GIST th -29 th Apr B.Stewart RAL In-orbit Mirror Performance.
CALMON data 1 Use of daily CALMON data Brian Stewart RAL.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
Status of EPIC operations Pedro Calderón Riaño, ESAC Leicester BOC meeting 6-8 March 2012.
1 st post launch SCIAMACHY calibration & Verification Meeting L1b Astrium Friedrichshafen – Germany 24 July 2002 First level 1b Leakage current analysis.
18th GIST 14 th -16 th May 2003 E Sawyer RAL Status of GERB1,2,3 and 4 Descan mirror bearing life tests Battery issues Operations during eclipse.
HP SURVEY INSTRUMENT CALIBRATION AND SELECTION PRINCIPLES OF RADIATION DETECTION AND QUANTIFICATION January 13 – 15, 2016 TECHNICAL MANAGEMENT SERVICES.
GIST, Boulder, 31/03/2004 RMIB GERB Processing: overview and status S. Dewitte Royal Meteorological Institute of Belgium.
GIST-21 Meeting 31 March-02 April MSG PROGRAMME STATUS Presentation to the GIST-21 meeting.
GERB in-flight calibration Monitoring Instrument Gain.
Level 1.5 Processing Updates Martin Bates, RAL GIST th April, 2005.
GIST Meeting 5 February MSG-1 - PROGRAMME STATUS Presentation to the GERB GIST/PSG meeting.
03-May-2007GIST 26: Abingdon GGSPS status Andy Smith RAL.
GIST-19 Meeting August MSG-1 - PROGRAMME STATUS Presentation to the GIST-19 meeting.
Page 1 NPOESS Preparatory Project (NPP) VIIRS Calibration Maneuvers May 15, 2008 Ocean PEATE Team.
GERB Ground Calibration Overview and Status J. Rufus
The HXMT in-flight calibration plan Shaolin XIONG, Shijie ZHENG, Liming SONG On behalf of HXMT SGS team Institue of High Energy Physics, China 11th.
PLEIADES Lunar Observations Sophie Lachérade, Bertrand Fougnie
Dec 2002 Jan 2003 Feb 2003 March 2003 April 2003.
NOAA VIIRS Team GIRO Implementation Updates
Calibration Event Logging GSICS meeting, March 2013, Williamsburg USA
VIRTIS Operations at Lutetia
Calibration Status for the GOME Instrument
GOES-16 ABI Lunar Data Preparation to GIRO
An Overview of MODIS Reflective Solar Bands Calibration and Performance Jack Xiong NASA / GSFC GRWG Web Meeting on Reference Instruments and Their Traceability.
GERB/CERES comparisons
Data Preparation for ASTER
First Assessments of EUVI Performance on STEREO SECCHI
Photos of our Solar System
Launch and On-orbit Checkout
EPIC Calibration & Operations Meeting
National Satellite Meteorological Centre
Lunar Observation Activities with a Small Satellite and a Planetary Exploration Satellite. Hodoyoshi-1 Hayabusa-2 Toru Kouyama, AIST
UVIS Calibration Update
Preliminary SCIAMACHY Lunar observations as intercalibration source
Presentation transcript:

18 th GIST Meeting 14 th –16 th May 2003 Ground Segment (GGSPS) Report 1 Commissioning update B.C.Stewart RAL

18 th GIST Meeting 14 th –16 th May 2003 Ground Segment (GGSPS) Report 2 Topics History Functional tests Calibration tests

18 th GIST Meeting 14 th –16 th May 2003 Ground Segment (GGSPS) Report 3 History 11 th Dec SUNBLOCK –Torque level 4 12 th Dec 16:01 – 13 th Dec 09:48 NORMAL (262) –Earth view centered 16 th Dec 13: th Dec 16:35 NORMAL (262) 15 th Jan 16:41 – 16 th Jan 13:08 NORMAL (262) 16 th Jan 13:40 – 22 nd Jan 10:55 NORMAL (282) –Extended Earth scan, Torque Level 3, SEVERI ON/OFF 22 nd Jan 11:14 – 22 nd Jan 12:09 NORMAL (262) –TOT + TOT, asymmetries

18 th GIST Meeting 14 th –16 th May 2003 Ground Segment (GGSPS) Report 4 History(2) 22 rd Jan 12:17 – 24 th Jan 14:15 0.0° step size ‘NORMAL’ mode –Fixed mirror angle –CALMON diode v. detector signal variation over ~48 hours –Attempt at limb observation –Moon observations 23 rd Jan 15:39 – 17:17 24 th Jan 14:23 – 30 th Jan 17:15 NORMAL (262), TL 3 –28 th Jan 10:03-12:57 TL’s 1 and 2 –2 days (25 th -26 th ) when SEVERI OFF 30 th Jan 17:26 – 31 st Jan 15:00 PSF ‘whole Earth’ at x5 resolution 31 st Jan 15:12 – 3 rd Feb 15:53 NORMAL (262) –1 st – 2 nd Feb SEVERI OFF

18 th GIST Meeting 14 th –16 th May 2003 Ground Segment (GGSPS) Report 5 History(3) 3 rd Feb 16:05 – 6 th Feb 09:45 Deep Space ( ) –Heaters 1, 2 ON/ OFF over ~2 days –Serendipitous lunar observations –Stray light 6 th Feb 09:47 – 10 th Feb 13:51 NORMAL (262) –Includes change to Earth sensor 10 th Feb 13:55 -14:08 Alpha value scan –Attempt 10 th Feb 15:10 – 15:42 SW CAL –‘serendipitous’ Earth limb in ‘dark’ observation 10 th Feb 15:47 – 28 th April SAFE mode –Sun avoidance period

18 th GIST Meeting 14 th –16 th May 2003 Ground Segment (GGSPS) Report 6 Current/ future 28 th April 11:44 – 13:30 SUNBLOCK TCF ‘null’ ON/OFF 15:23 – 16:11 SUNBLOCK TCF ‘step’ ON/OFF 28 th April 16:13 – 9 th May 14:49 NORMAL mode –1 st May 11:16 – 19:28 Sensor swaps –SW CAL 30 th April 14:53 9 th May 14:49 - SAFE mode 13 th May – MSG manoeuvre 19 th May - –Alpha values –Mirror timing Correlated observations with CERES –last 2 weeks in May, early June 6 th June – PSF

18 th GIST Meeting 14 th –16 th May 2003 Ground Segment (GGSPS) Report 7 Functional tests MSG System Commissioning [GIFRPT] GERB Instrument Functional Test Report covers (DRAFT 29/01/03) –Mode switching (OFF, ROM, SNOOZE, SAFE, SUNBLOCK, NORMAL) –Descan Mirror operation –Quartz Filter operation –Detector operation –TMTC –Scanning timing –Thermal control –Safety procedures and limit checking –Patch and dump –Torque levels + TCFs

18 th GIST Meeting 14 th –16 th May 2003 Ground Segment (GGSPS) Report 8 CalibrationsTests Verification of the on ground characterisation of the pixel time constant corrections (to be done) Characterisation of the Calibration Monitor (2 SW CAL + 48hr mirror fixed) Assessment of the deep space scan (24 hour obs) Evaluation of the lunar scan for calibration purposes (1 obs) Evaluation of each detector’s PSF (1 day whole Earth + SW CAL ‘dark’) Evaluation of the GERB calibration modes In-flight characterisation of misalignment (N.B. addressed by RMIB analysis early in the mission and after each manoeuvre throughout the mission). New Mirror face offsets (to be done) Stray light (to be done)