Netherlands Institute for Radio Astronomy 1 ASTRON is part of the Netherlands Organisation for Scientific Research (NWO) LOFAR Operations and Schedule.

Slides:



Advertisements
Similar presentations
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
Advertisements

A Workflow Engine with Multi-Level Parallelism Supports Qifeng Huang and Yan Huang School of Computer Science Cardiff University
Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
National Radio Astronomy Observatory June 13/14, 2005 EVLA Phase II Proposal Review EVLA Phase II Computing Development Bryan Butler (EVLA System Engineer.
Operating Systems Operating system is the “executive manager” of all hardware and software.
Lecture Roger Sutton 21: Revision 1.
Chapter 14 Network Design and Implementation. 2 Network Analysis and Design Aspects of network analysis and design Understanding the requirements for.
28.2 Functionality Application Software Provides Applications supply the high-level services that user access, and determine how users perceive the capabilities.
Summary Role of Software (1 slide) ARCS Software Architecture (4 slides) SNS -- Caltech Interactions (3 slides)
Netherlands Institute for Radio Astronomy 1 ASTRON is part of the Netherlands Organisation for Scientific Research (NWO) From LOFAR design to SKA1 System.
New DFG Information Infrastructure Projects Dr. Stefan Winkler-Nees; Birmingham, 28. March 2011 New DFG Information Infrastructure Projects.
Usability 2004 J T Burns1 Usability & Usability Engineering.
Distributed Processing of Future Radio Astronomical Observations Ger van Diepen ASTRON, Dwingeloo ATNF, Sydney.
From Olivier to commissioning team plans for the start-up of regular operations of LHCb 30/06 to 4/07 : Global commissioning week, all detectors, full.
The Software Development Cycle Defining and understanding the problem.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
Hunt for Molecules, Paris, 2005-Sep-20 Software Development for ALMA Robert LUCAS IRAM Grenoble France.
 Introduction to Operating System Introduction to Operating System  Types Of An Operating System Types Of An Operating System  Single User Single User.
EVLA Early Science: Shared Risk Observing EVLA Advisory Committee Meeting, March 19-20, 2009 Claire Chandler Deputy AD for Science, NM Ops.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
AGES: Activating and guiding the engagement of seniors Intervention Training.
District and Subordinate Courts Application Software Standardization.
Andreas Horneffer Status of MKSP LOFAR Observations.
Semantic Interoperability Berlin, 25 March 2008 Semantically Enhanced Resource Allocator Marc de Palol Jorge Ejarque, Iñigo Goiri, Ferran Julià, Jordi.
MCTS Guide to Microsoft Windows Vista Chapter 4 Managing Disks.
Scalable Web Server on Heterogeneous Cluster CHEN Ge.
LOFAR STATUS UPDATE R. F. Pizzo on behalf of LOFAR Science Support Sant’Antioco, May 13 th 2013.
Astro-WISE & Grid Fokke Dijkstra – Donald Smits Centre for Information Technology Andrey Belikov – OmegaCEN, Kapteyn institute University of Groningen.
Doug Tody E2E Perspective EVLA Advisory Committee Meeting December 14-15, 2004 EVLA Software E2E Perspective.
VLBI Storage Manager (VSM) Matteo Stagni – Mauro Nanni 0.
ELAG 2006: WS2 Report European Metadata Registry Influence Interoperability Workshop 2 Report ELAG 2006.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
Introducing Regulatory Impact Analysis into the Turkish Legal Framework “Training the Trainers” November 2008 RIA in the EU by Lydia Jørgensen, Senior.
Draft-vandevelde-v6ops-addcon-00.txt IPv6 Unicast Address Assignment Considerations Gunter Van de Velde (editor) Tim Chown Ciprian Popoviciu IETF 65, March.
Fast Crash Recovery in RAMCloud. Motivation The role of DRAM has been increasing – Facebook used 150TB of DRAM For 200TB of disk storage However, there.
Toward a Multi-State Consensus on Rural Intersection Decision Support: Objectives u Gain understanding of issues involved with national rural intersection.
Response to ASAC Report of May 2004 Response to ASAC The Atacama Large Millimeter Array Tom Wilson and Al Wootten Science IPT.
Observing Modes from a Software viewpoint Robert Lucas and Philippe Salomé (SSR)
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Neutrino Program (MINOS, MINERvA, General) Margaret Votava April 21, 2009 Tactical plan.
State of Georgia Release Management Training
CREATE THE DIFFERENCE Back ups and Recovery. CREATE THE DIFFERENCE Aims This lecture aims to cover –Back ups –Transaction logging –Security threats.
CS4315A. Berrached:CMS:UHD1 Introduction to Operating Systems Chapter 1.
1 Procurement Operations Division (POD) Guidance for Telework and Work Schedules February 2016.
HighImpactSoft 2010 Organizing a Better Future. Agenda Specify Goals ScopeDefinitions Process Model Preliminary Requirements Issues and solutions TraceabilityPrototype.
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
Waste Management Inspection Tracking System (WMITS)
Information Sharing for Integrated Care A 5 Step Blueprint.
LivePlan Best Practices in Deployment & Promotion Arlene Soto
CRISP WP18, High-speed data recording Krzysztof Wrona, European XFEL PSI, 18 March 2013.
Fermilab Cal Tech Lambda Station High-Performance Network Research PI Meeting BNL Phil DeMar September 29, 2005.
What is FABRIC? Future Arrays of Broadband Radio-telescopes on Internet Computing Huib Jan van Langevelde, JIVE Dwingeloo.
Compute and Storage For the Farm at Jlab
Andreas Horneffer for the LOFAR-CR Team
Month Year doc.: IEEE yy/xxxxr0 July 2013
Memory Management.
WP18, High-speed data recording Krzysztof Wrona, European XFEL
Information Sharing for Integrated care A 5 Step Blueprint
Database Services at CERN Status Update
LOFAR Beam Formed (BF) Data & Pipeline Overview September 9, 2010
End of Year Performance Review Meetings and objective setting for 2018/19 This briefing pack is designed to be used by line managers to brief their teams.
Gustaaf van Moorsel September 9, 2003
Radio Observatory Report
Shared Risk Science with the EVLA
CS310 Software Engineering Lecturer Dr.Doaa Sami
(60GHz New Technique Proposal)
Distributed Systems and Concurrency: Distributed Systems
a Overview of requests (including common params)
and Forecasting Resources
Presentation transcript:

Netherlands Institute for Radio Astronomy 1 ASTRON is part of the Netherlands Organisation for Scientific Research (NWO) LOFAR Operations and Schedule Antonis Polatidis

2 Rollout Status Can observe with 14 core, 6 remote and 3 international stations Up to 34 (NL) + 2 (DE) HBA antenna fields

3 Towards integrated operations: 1st Control and Metadata Busy Week  Test the flow of an observation starting with an astronomer defining a project, interaction with the Radio Observatory, data taking and the flow of processed data through the online and offline systems up to the data archive.  Simulated an astronomer using MoM to describe an observation (LEA128 as an example), interaction with RO support scientists and observers, and observations taking place under SAS/MAC (multiple observations). FIRST RESULTS (15-23 Feb and beyond)  Many issues identified; some solved, others entered in CRAFT for further work.  Definition of observations through MoM and SAS functioning OK - Overhaul to add Beam-forming modes.  Interaction between scientist, observers, friend & scheduler going far more smoothly.  Now able to schedule HBA through MoM & SAS  Data management on the agenda  Archiving of LOFAR datasets again in progress after a long period

4 Towards integrated operations: 2nd Control and Metadata Busy Week  Put more emphasis to the flow of processed data through the online and offline systems up to the data archive.  Simulate planning, scheduling and executing of multiple observations interfacing the LOFAR SCHEDULER to MoM and SAS.  Reduce the setup time between individual observations (from min to sec).  Test multiple beam functionality.  Integrate SAS with the pipeline and process data all the way to the archive.  Develop data scrutiny protocols.  Observations:  Many, short observations alternating in frequency and mode (LBA, HBA)  Long, multiple beam observation  Parallel interferometric and beam formed observations  Parallel interferometric and TBB dumps

5

6 MoM - Defining details of observation

7 Current Issues  Problems with Blue Gene rack allocation - Became obvious when recording data at high rates ( >30 antenna fields with HBAs)  A failed process causes the whole subrack to freeze and hence the observations can not recover.  Stations continue streaming data and overflow the network switches  Solution seeked:  Hardware problem: Node replaced (8 March)  Operating System: IBM notified  Arrange network to avoid data overflows  Check if process hung and re-allocate the sub-rack switching off only the affected part.  Seems that Pulsar observations are not affected by this problem  Amplitude ripples  Ripples in HBA XX polarization in core stations (when splitter is on)

8 Coordination of CEP offline resource usage With increased number of stations, and large data rates require to write to large number of storage nodes simultaneously. Reshuffling of data is highly inefficient. Simultaneous use of storage nodes for observing and processing expected to severely degrade the performance of the systems (will test this further). Current strategy of appointing subclusters to user groups is no longer sufficient Solutions under consideration  Keep /data1 in each storage node free for observations - Process observations and move data out as soon as possible.  Stick with the “dedicated” subcluster allocation for usual work and  Allocate additional resources to larger observations for limited time (ie spare subclusters, all /data1 partitions):  User groups should assign a “spokeperson” for faster communication.  Assign to user groups permission to access the additional resources for a limited time (and clear up the additional disk space).  Assign a “friend” of resources (support scientist) Will consult with the user groups and implement a policy soon.

9 Commissioning Activities March - April 2010

10 Proposal Review Feedback from the Programm Committee sent Feb. 2nd LEA proposals are incorporated in the general commissioning plan. This plan is FLEXIBLE so that it can accommodate the needs and requests of commissioners as well as the available resources of the Radio Observatory. RO will contact proposers to arrange when they are available to schedule their observations and presence in Busy Weeks. Reviews of Long Term Proposals will start reaching Pis by end of March. This will be the first step of an iteration that will lead to guidelines for writting observing proposals Feedback with the Programme Committee: T. Van der Hulst vdhulst_AT_astro.rug.nl Discuss with the observatory regarding observing schedule: lofarscheduler_AT_astron.nl

11 Proposal Rating: CLASS  Class A: proposals judged to be those projects with high commissioning value or scientific impact and will be scheduled early in the term.  Class B: proposals judged to be those projects with significant commissioning value or scientific impact, but requiring either adjustment or system capabilities not available till later in the observing period. These projects will be scheduled on a best effort basis.  Class C: Projects that were not recommended for observations because the LOFAR Programme Committee found them of low commissioning value. Where applicable, some of the aims of these projects can be achieved by getting access rights and processing resources for existing or previously scheduled data sets.

12 Proposal Rating: GROUP A Scheduling Indication  Group 1: Projects that can be scheduled in the next few months with the hardware and software available before MSSS  Group 2: Projects that can be scheduled concurrently or use data taken during MSSS  Group 3: Projects that require hardware and functionality that will be available after the completion of MSSS.  Group 4: Projects judged to require functionality that will be available well after MSSS is completed or that wish to test modes that will be under development later than the end of These projects will not be scheduled in this round of commissioning.

13

14 LOFAR Schedule Viewer  The current schedule of LOFAR can be seen online: “ LOFAR Management of Measurements “

15

16