Spacecraft and Ground Segments Status March 21, 2014 Dan Ossing STEREO Mission Operations Manager (240) 228-8319.

Slides:



Advertisements
Similar presentations
GSFC Space Science Mission Operations (SSMO) and Space Weather
Advertisements

June 26, 2002; Page: 1 ESOC (TOS-OGR) European Space Operations Centre Manfred Warhaut Ground Segment Manager TOS-OGR ROSETTA Ground Segment.
LightSail.
Superior Solar Conjunction Planning May 8, 2014 Dan Ossing STEREO Mission Operations Manager (240)
Advanced Multimission Operations System (AMMOS)
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
Questions from the European colleagues & Answers (only) from the Chinese engineers present for Y.-W. Zhang and S.-G. Yuan Chinese Academy of Space Technology.
Frank Stocklin Ron Vento Leslie Ambrose June 28,2001 SUPERNOVA/ACCELERATION PROBE (SNAP) Data Systems.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG # March 2010 Dublin, Ireland.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center Phase E Kickoff Meeting February 23, 2007.
GLAST LAT ProjectManager’s Face to Face - ISOC, 17 March GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Manager’s Face.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
16 th International Laser Ranging Workshop, Poznan Poland, Oct. 14 th, 2008 Laser Ranging (LR)-Lunar Reconnaissance Orbiter (LRO) Data Flow and Scheduling.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
DAO March of 9 STEREO Unattended Track CONOPs Review March 27, 2007 Daniel Ossing THE JOHNS HOPKINS UNIVERSITY.
March 2004 At A Glance ITOS is a highly configurable low-cost control and monitoring system. Benefits Extreme low cost Database driven - ITOS software.
STEREO Science Center William Thompson NASA Goddard SFC Code Greenbelt, MD
Program Management And Systems Engineering Direction Decisions of a Nanosatellite Mission Aaron Goldstein Program Manager.
OSIRIS-REx Asteroid Sample Return (NASA New Frontiers Program)
NASA’s Goddard Space Flight Center LRO Operations Concept Richard Saylor Jr. HTSI/Code 444 August 16-17, 2005.
“Joint planning” session Preliminary instrument operation & science plans of SOT/XRT/EIS for several months after the launch. Instrument checkout and Performance.
( ELR) - 1 STEREO - Solar Terrestrial Relations Observatory Mission STEREO SWG STEREO OBSERVATORY Status Edward Reynolds APL STEREO Project Manager.
Van Allen Probes Spacecraft Operations July 29, 2015 Kristin Fretz
Aquarius Project Status 7 th Aquarius/SAC-D Science Team Meeting 11 April 2012.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG 3-5 February 2009 Pasadena, California.
Rachel Weintraub Public Affairs Officer & TV Producer NASA Goddard Space Flight Center More information:
STEREO - Solar Terrestrial Relations Observatory Mission STEREO STEREO Science Team Meeting May 2, 2005 Presented by Edward Reynolds APL STEREO Project.
SECCHI Consortium Meeting, July 2001 SECCHI Ground Data Systems and Data Processing Nathan Rich NRL/Interferometrics
Final Version Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Mission Operations Tim Rykowski Jeffrey Hosler May 13-17, 2002.
Solar B Mission Operations Working Group - 3 February Page 1 SS Instrument Operations for TIMED, Cluster, & Stereo C. P. Holmes Sun-Earth Connection.
LRO Mission Concept of Operations Summary Version 1.0 (Preliminary) April
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG April 2008 Meudon, France.
STEREO Organization Project Manager Nick Chrissotimos Deputy Project Manager Jim Adams Deputy Project Manager/Instruments Mike Delmont Deputy Project Manager/Resources.
1 Arizona State University Senior Design ASU/JPL Flight System Group Members: Robert Hoffman, Dusty Terrill, Adam Nikolic, Josh Ruggiero.
1 JWST Functional Flow Diagrams and Schematic Block Diagrams.
SE&I Pre-Proposal Meeting GSFC - JPL Systems Engineering Management Colleen McGraw.
William Thompson L-3 Communications NASA Goddard Space Flight Center STERE The STEREO Science Center.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG March 27-28, 2007.
NASA’s Goddard Space Flight Center Lunar Reconnaissance Orbiter Ground System Requirements.
STEREO - Solar Terrestrial Relations Observatory Mission SECCHI Calibration Activities Simon Plunkett SECCHI Operations Scientist Naval Research Laboratory.
Telemetry Constraints during Early Operations The STEREO telemetry rate is restricted during the phasing orbits due to S/C RF interference with each other,
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
LiteBIRD US Team Meeting 10/13/2015 Team Meeting at UCB SSL1 Intro to SSL.
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
STEREO PLASTIC PLASTIC: The Plasma and Suprathermal Ion Composition Investigation on STEREO A.B. Galvin, E. Moebius, L. Kistler, M. A. Popecki, J. Quinn.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG November 2007 Pasadena, California.
Tracing the JWST Proposal from User Interface to Commanding of an Instrument Margaret Meixner & WIT Balzano, Robinson & CMD.
Status of EPIC operations Pedro Calderón Riaño, ESAC Leicester BOC meeting 6-8 March 2012.
GLAST Science Support CenterAugust 10, 2004 Users’ Committee Meeting The Project Data Management Plan David Band – GSSC.
GLAST LAT ProjectIDT Face-to-Face Agenda S. Williams 1 Face to Face Meeting Session Topic: LAT Operating Modes Date: March 19 Time: 13:30 Convener: Scott.
Spacecraft Systems Henry Heetderks Space Sciences Laboratory, UCB.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
STEREO Science Working Group Fall AGU December 11, 2006 San Francisco Meeting #15 (I think) Agenda 19:00-19:30Project and SSC status 19:30-20:00SECCHI.
IMPACT Conjunction and Sidelobe Operations Janet Luhmann, Dave Curtis, Peter Schroeder, Dick Mewaldt and the IMPACT Team July 2, 2014.
JASON-1 MISSION STATUS S. Coutin-Faye CNES, Altimetry and Precise Positioning Office.
Ground Control AERSP 401A. Ground System’s Basic Elements Mission Elements –Control the space segment or handle mission data, and includes: Ground Stations.
SSC Preflight Status Tested during Sim #3: –Telemetry ingest –Beacon processing –Science planning –Archiving of MOC data products, including level-0 telemetry.
USNA Next Generation Ground Station
I&T&C Organization Chart
Rosetta Science Ground Segment Overview
Maxim Pathfinder Prework 16 August 1999
SDO Flight Dynamics Subsystem
Systems Engineering Management
NASA, ESA Spacecraft Track Solar Storm Through Space
LRO Mission Operations Concept
Launch and On-orbit Checkout
The STEREO Space Weather Broadcast
LAT Operations Scenario Subsystem Meetings
March ’05 Face to Face Meeting Introduction
Presentation transcript:

Spacecraft and Ground Segments Status March 21, 2014 Dan Ossing STEREO Mission Operations Manager (240)

2 Spac e STEREO Phase E Organization Chart Project Scientist J. Gurman Mission Director D. Quinn Mission System Engineer Josephine San FDF Project Manager R. A. Denissen Mission Operations D. Ossing System Engineering D. Wilson DSN Technical SSC W. Thompson Science Teams DSN Scheduling Payload Operations Teams GSFC APL JPL NRL, UCBerkeley, UNH, UMinn Mission Operation Team Subsystem Lead Engineers

3 Spac e Program Status  Operations – Began automated unattended tracks April 30,2007 – Operations team is 6 full time staff. Total manpower is approximately 11 MM/M – Downlink rates: Varies, 720 to 120 Kbps depends on antenna size and track elevation – Switched MOC to CCSDS SLE telemetry standard in July 2011 – Began using ESA stations (35 meter) in January 2012 –Due to very high DSN loading –Awaiting new NASA/ESA agreement – Mission operations center still collecting 3 – 5 Gbits per day in support of the science mission.  Special Observatory Events – 36 instrument roll events to observe Comet ISON – 37 High Gain Antenna Calibrations (every 6 months) – 125 Momentum Dumps (~every 6 weeks on both spacecraft) – >127 instrument calibration and roll events

4 Spac e Spacecraft Status  Both observatories operating nominally using reduced gyro operations  IMU status (gyros)  AHEAD –IMU-A – failed in April 2007 –IMU-B – limited remaining life  BEHIND –IMU-A – limited remaining life –IMU-B – failed in January 2014  Reduced gyro operations uses IMU only when high rate data is required, i.e., momentum dumps, instrument rolls, etc.  Reaction Wheel Stiction  AHEAD – Wheel 1  BEHIND – Wheels 3 & 4

5 Spac e Ground Segment Status  All MOC peripheral equipment, i.e., PCs, network equipment, UPS batteries, projectors, monitors, printers, and RAID arrays refreshed in  Refresh of Solaris Unix systems in progress  Switching to Intel based Sun Unix systems

6 Spac e Concerns  Superior Solar Conjunction in 2015  Untested configuration  MOC Unix system refresh