NEPTUNE Power System Shore Station Power Supply Preliminary Design Review Tim McGinnis Dec 4-5, 2003.

Slides:



Advertisements
Similar presentations
Mobile Radiographic Equipment. Introduction In-patients who could not leave their beds In-patients who could not leave their beds Surgeons who required.
Advertisements

Orion Telecom Networks Inc VCL-E3 OLTE 34Mbps Optical Line Transmission Equipment Slide 1 Updated : January 1st, , Avenue of Fountains,
Valiant Communications Limited Slide 1 Updated : January, 2006 V aliant C ommunications L imited Telecom Transmission Solutions VCL-E3 OLTE 34Mbps.
Slide 1 Copyright : Valiant Communications Limited Slide 1 Orion Telecom Networks Inc Updated: April, 2010 V aliant C ommunications L imited.
Aloha Observatory Design Cabled Observatory Presentation School of Ocean and Earth Science and Technology February 2006.
DOD Microgrids The Missing Link: Microgrid Applications Michael Dempsey P.E. Burns & McDonnell June 12, 2013 © 2013 Burns & McDonnell. All Rights Reserved.
Concept Design Review (CoDR) Shore Station DC Breaker Cable model Transient Analysis Components.
Graphic Symbol Location 1. DIN Terminal X52 The machine is powered by electricity using copper cable with 5 wires (3 phase wires + neutral wire +
1. 11/26/2012: NERC Board of Trustees adopted CIP v5 CIP thru CIP CIP and CIP Version 5 Filing FERC requested filing by 3/31/2013.
LHC UPS Systems and Configurations: Changes during the LS1 V. Chareyre / EN-EL LHC Beam Operation Committee 11 February 2014 EDMS No /02/2014.
Undersea Neutrino Telescope Possible Solutions
CR1000s are only one part of a data acquisition system. To get good data, suitable sensors and a reliable data retrieval method are required. A failure.
Proposed Design and the Operation of a Disconnecting Device for Small EG Installations Prepared by Hendri Geldenhuys.
Delta Confidential DES UPS introduction UPS training June 2006 Markus Schwab.
CR1000s are only one part of a data acquisition system. To get good data, suitable sensors and a reliable data retrieval method are required. A failure.
NEPTUNE Power System Low Voltage Circuit Preliminary Design Review Tim McGinnis Dec 4-5, 2003.
Power Monitoring And Control System (PMACS) NEPTUNE Preliminary Design Review 4-5 December 2003 Chen-Ching Liu, Ting Chan, Kevin Schneider.
Clean, Reliable, and Low Cost Energy for the for theCaribbean December, 2006 Confidential.
IC Voltage Regulator.
ESS | Power System | | Frithiof Jensen ESS Power System Ion Source, Front-end.
Electricity Service Delivery 2 Aim To provide students with information to enable them to deal with the effects of electricity at incidents.
Sea Breeze Pacific Regional Transmission System Juan de Fuca Cable & West Coast Cable Keys to West Coast Transmission Progress.
6/10/2003 – e.heineVLVnT facility-power1 EFNI H K Introduction Hypothesis Topology, technical constrains Redundancy, budget constrains Grounding Reliability.
All Regions Workshop #2, 5-7 Oct , Paris, France G. Riccobene – LNS / INFN The East Sicily Node Facilities Giorgio Riccobene INFN-LNS, Catania
Inductive Power System for Autonomous Underwater Vehicles
Shore Station UPS Requirements for the NEPTUNE Power System
POWER PLANT USED IN TELECOM
North East Pacific Time-series Underwater Networked Experiment (NEPTUNE): Power System Design, Modeling and Analysis Aditya Upadhye.
NEPTUNE Power System Ground Return Electrodes Tim McGinnis & Colin Sandwith UW/APL.
Submarine Cable System Functions & Repair
Module 5, Unit A Vocabulary Review Game. 2 pt 3 pt 4 pt 5pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2pt 3 pt 4pt 5 pt 1pt 2pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4pt.
DESIGN OF THE NEPTUNE NODE CONVERTER Vatché Vorpérian Jet Propulsion Laboratory.
Neptune BU Switching Circuit diagram and operations.
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
LNA DC Bias Module Approach Block Diagram Schematic Program Plan
SIMPLE TRANSMISSION OUTAGE. Nodal Protocol Definition 2.26 Simple Transmission Outage A Planned Outage or Maintenance Outage of any Transmission Element.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
LIU-SPS ZS Electrostatic Septum Upgrade Review held on M.J. Barnes & T. Kramer.
Monterey Accelerated Research System
Discussion and preliminary conclusions LIU-SPS ZS Electrostatic Septum Upgrade Review M.J. Barnes.
Page 1 NEPTUNE Alternate System Design Peter Phibbs 7-8 January 2003.
Neptune Power Versions compared 1 All rights reserved © 2003, Neptune Power sub-system Versions 1 and 2 Key features V2 is functionally equivalent to V1.
Name Of The College & Dept
NEPTUNE Power Low Voltage Circuit Fall 2003 Quarterly Meeting Tim McGinnis Sept 11-12, 2003.
Substation Data Integration & Information Exchange Advisor: Dr. Mladen Kezunovic Student: Sasa Jakovljevic Texas A&M University, Department of Electrical.
Keck Meeting - UW10 January NEPTUNE – Technology Backbone system with branch units / hierarchy of Junction Boxes Power Parallel architecture -
Power System Restoration Kevin Schneider, Chen-Ching Liu University of Washington Department of Electrical Engineering.
The definition of the Earth system or grounding: the electric connection between the work of intentionally electrical device or network devices on the.
POWER QUALITY AND NETWORK DISTURBANCES in CERN’s electrical network K. KAHLE, TS-EL Diploma students R. Sternberger, M. Neubert 1 st TS Workshop Archamps,
Self Switching Power Supply. Introduction Self Switching Power Supply  Embedded system requires a regulated power supply.
Copyright© 2005 Avaya Inc. All rights reserved Avaya UPS Training powerware.com/avaya.
Uninterruptible Power Supply Improves Reliability at The Australian Synchrotron Sean Murphy – ARW 2013 Melbourne.
“HVDC TRANSMISSION” SUNIT KUMAR SAHOO REG NO-S BRANCH-EEE PREPARED BY.
Wet Demonstrator Objectives. 2 A Brief History Functional Requirements First DraftJuly 2014 Wet Demonstrator Scope First DraftJuly 2014 Singapore Workshop.
HVDC Transmission.
Rosanna Cocimano for the NEMO collaboration VLV T08, Toulon, France April 2008 Rosanna Cocimano for the NEMO Collaboration A comparison of AC and.
Rosanna Cocimano Amsterdam, 5-6 July 2010KM3NeT WPF/L General Meeting Rosanna Cocimano INFN LNS Power plan for detector layout Presented in TDR.
KM3NET-IT Tower Power System Rosanna Cocimano for KM3NET-IT Power Group 26 november
Project WECC-0100 Standards Briefing WECC-0100 SDT April 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Artificial Intelligence In Power System Author Doshi Pratik H.Darakh Bharat P.
Aloha Observatory Design
HVDC LIGHT:- NEW TECHNOLOGY FOR A BETTER ENVIRONMENT
SHORT CIRCUIT MONITORING BY USING PLC & SCADA
DS3 Fail-over Protection Switch
E1 Protection Fail-over Switch
Redundancy and diverse routing for data exchange
Student’s Name with USN No.
EET 323 – Electrical System Design Lecture 9: Grounding
SMUD’s Microgrid Definition
Presentation transcript:

NEPTUNE Power System Shore Station Power Supply Preliminary Design Review Tim McGinnis Dec 4-5, 2003

NEPTUNE Shore Station 2 Shore Stations – each with 10kV (nominal, 0-120%) 100kW Shore Power Supply (SPS) Each able to individually power the network with reduced capability Shore electrode (anode) will likely be located on shore in ground bed West Coast of Vancouver Island –Existing cable stations at Port Alberni & Bamfield –Possible new cable station in Victoria Oregon Coast –Existing cable stations at Nedonna Beach, Rockaway, Pacific City, Bandon

MARS Shore Station 1 Shore Station with 10kW (nominal) Shore Power Supply (SPS) Located at MBARI facility in Monterey Bay Shore Electrode (anode) will likely be located underwater

Status Purchased a 208VAC:15kVDC, 1.1A power supply from Voltronics, Inc. for lab testing Have set up 15kV test lab in basement of APL Collected information from several potential vendors of a 100kW, 10kV (nominal) power supply

NEPTUNE Requirements 1 SPE15 All shore-station equipment including Shore Power Supply, Submarine Line Terminal Equipment, Line Monitoring Equipment, Network Protection Equipment, and Timing distribution Equipment shall be operable off a single uninterruptible power supply SPE23 When the Shore Power Supply (SPS) is switched from double-end feeding to single-end feeding or from in-service equipment to redundant equipment in a controlled manner and vice versa, no severely errored seconds shall occur. SEF25 All power feeding equipment shall be demonstrated to minimize the risk of failure of System power. SEF26 Power feeding equipment at all stations shall be fully duplicated and include a dummy load.

SEF27 The SPS shall comprise the equipment for converting the Shore Station’s power supply into the form required to power the undersea Segments. The PFE shall be interconnected with the undersea cable to feed power to the undersea Nodes and branching units. SEF28 The SPS of each Shore Station shall have sufficient redundancy such that the Segment meets the overall reliability requirements specified in this specification. In case of SPS failure in one Shore Station, the SPS in the other Shore Station shall be capable of automatically feeding the System without operator intervention. SEF50 Voltage limit shall be adjustable plus/minus 10% SEF51 Current limit shall be adjustable down to 1 A. SEF52 Shore stations shall be capable of coordinating power outputs in order to achieve system-wide goals, such as minimizing operating costs NEPTUNE Requirements 2

Shore Station Power Supply Block Diagram

Submarine Telecom Cable Single conductor Requires use of seawater as conductor

Seawater Current Return Anode (consumable) on shore Cathode (protected) offshore