12-13 July 2011, University of Rome "La Sapienza" Rome, Italy pSHIELD Consortium Meeting Przemyslaw Osocha, SESM,

Slides:



Advertisements
Similar presentations
Science and Policy Integration for COastal Systems Assessment
Advertisements

The Biosafety Clearing-House of the Cartagena Protocol on Biosafety Tutorial – BCH Resources.
0 DOD/DT/CEDCV – 20 th & 21 st January Paris meeting SAGEM RTD Activities C2-Sense project Paris – 20 & 21 January 2015.
Deliverable documents planned status 1/2 Del. no. Deliverable name WP no. Responsibilit y Reviewer Nature/disse mination Level Delivery date from Annex.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
INGAS General Assembly, Oulu, 25&26 May 2011 INGAS INtegrated GAS Powertrain 1 INGAS 30 months meeting Oulu, 25&26 of May 2011 General Assembly Coordinator.
KM3NeT, , Pylos © FIM-NewLearning 2007 KM3NeT Management & Reporting Dr. Roland Klein Project Office KM3NeT
New work-package WP5: Multimodal Processing and Interaction MUSCLE JPA3 Leaders: Petros Maragos, ICCS-NTUA Alexandros Potamianos, TSI-TUC.
Networks ∙ Services ∙ People John DYER TF-MSP Video Conference Community Procurement Support Building on the SPOT-ON Proposal Smart Procurement,
Welcome to the Minnesota SharePoint User Group. Introductions / Overview Project Tracking / Management / Collaboration via SharePoint Multiple Audiences.
All Hands Meeting DORII Deployment of Remote Instrumentation Infrastructure Norbert Meyer PSNC October 20, 2009, Garching.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement AIDA status report.
Consultative meeting Gender in Value Chains Addis Ababa, May 9.
CODE 2 Cogeneration Observatory and Dissemination Europe Kick-off meeting July 2012 WP6 Communication and dissemination 10-11/07/2012COGEN Europe.
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
Quality Information Framework (QIF) Design and Strategy Meeting June 12-14, 2012 Hilton Head Island Dimensional Metrology Standards Consortium (DMSC) 1.
A global multidisciplinary network on housing research and learning WP3 Report Leandro Madrazo La Salle School of Architecture Barcelona, Spain Tirana,
LUGANO, WP V. Quality Assurance of Deliverables (Quality assurance plan). Interim results, challenges, future work.
Joint Research Item & Student Exchange Program Proposal 2006/11/16 Suk-Hwan Suh Director of Center for ubiquitous Manufacturing Professor of School of.
‘One Sky for Europe’ EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 VALIDATION DATA REPOSITORY Overview.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP8. Dissemination & Exploitation.
Strengthening global awareness in the local communities - Kolping 2020 Strategy.
12-13 July 2011, University of Rome "La Sapienza" Rome, Italy pSHIELD Collaboration Tools Przemyslaw Osocha, SESM,
MODERN General Meetings Plenary sessions Version: 1.0 Jan van Gerwen.
Welcome to Cologne 3 rd WP 5 Meeting May 26 th 2015.
FITT Fostering Interregional Exchange in ICT Technology Transfer Communication & Collaboration Tools.
FP OntoGrid: Paving the way for Knowledgeable Grid Services and Systems Communication in the consortium Review meeting Delft,
T 2.3 Follow up to Conferences Leonardo Piccinetti, EFB FORESTA Project Meeting Brasilia, 20 September 2011.
1 INTEROP WP1: Knowledge Map Michaël Petit (U. of Namur) January 19 th 2004 Updated description of tasks after INTEROP Kickoff Meeting, Bordeaux.
U.S. Department of Agriculture eGovernment Program Prototype Weekly Status Meeting July 1, 2003.
17 th October 2005CCP4 Database Meeting (York) CCP4(i)/BIOXHIT Database Project: Scope, Aims, Plans, Status and all that jazz Peter Briggs, Wanjuan Yang.
1 CHORUS + Coordinated approacH to the EurOpean effoRt on aUdio-visual Search engines ” Grant Agreement No CHORUS + 01/01/2010 – 31/12/ Jean-Charles.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval Annual Review Meeting - Introduction.
INTEROP Kick Of Meeting January Common Enterprise Modelling Framework (CEMF) (JR1, WP5) Meeting Summary and Action Plan  INTEROP Kick Of Meeting.
EGEE NA3 Status Prof. Malcolm Atkinson Director John Murison Training Manager CERN 14 th January 2004.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 7 – Dissemination, Exploitation Strategy and Standardization Inova+ Co-Living.
U.S. Department of Agriculture eGovernment Program Prototype Weekly Status Meeting June 10, 2003.
NSHIELD Project Meeting Brussels - 15 Feb 2012 Luigi Trono.
Geneva, November 2013 Speaker: Peter Keinz
Antonella Fresa Roma, 12 December 2005 kick off meeting.
Bringing Europe’s eLectronic Infrastructures to Expanding frontiers EU-India Grid Kick-off meeting, ICTP, October 2006 EU-India Grid Kick-off meeting.
Effectively Prioritising Key Outcomes for Tackling Poverty and Community Regeneration Thursday 25th November City Halls, Merchant City, Glasgow.
E. Kaldoudi – DUTH Deliverable 1.2: Study Report on Content Sharing Functional Requirements 3 rd Project Meeting Plovdiv, Bulgaria, January 2010.
Gabriela Macoveiu North-East RDA, Romania PP11 – WP responsible Cluster Policy Learning Platform WP3 Description Smarter Cluster Policies for South-East.
Project management and communication structure Nataša Urbančíková Faculty of Economics Technical University of Košice.
Number: TR/06/B/F/PP/ WASTE-TRAIN VOCATIONAL TRAINING, EDUCATION, CONVEYING INFORMATION ON UP-TO-DATE WASTE MANAGEMENT PRACTICES TO DECISION MAKERS/STAFF.
JORGE JUAN RODRÍGUEZ PEDRO GARIBI DESCRIPTION OF THE IMPLEMENTATION OF WP6 TO 9 IN DELIVERABLE D9.1.
CSW M1 Presentation Nuno Silva Critical Software S.A. Coimbra, 10th March 2010.
Review Preparation Meeting of the FP7 Project J-AGE Vienna 25th March 2015.
Critical Step Web Site Presentation. Ing. Carlo Sanghez Consorzio Interuniversitario Nazionale per l'Informatica Napoli,
Decisive – WP7 Decisive meeting at Stockholm, May 27th Susanna Teppola VTT Technical Research Centre of Finland.
ADMINISTRATIVE ISSUES
WP8: Demonstrators (UniCam – Regione Marche)
Annual Report Instructions
QUALITY IMPROVEMENT FINAL QUARTERLY COLLABORATIVE WORKSHOP
Fusion Standards Study Workshop
Title Goes Here Name(s), Organization, CEOS Affiliation
Intermountain West Data Warehouse
BioMedBridges – Work Packages 2 & 12
FP7 SCIENTIFIC NEGOTIATIONS
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
Employee engagement Close out presentation
The InWEnt Blended-learning approach; GC21 as an e-learning and Blended-learning platform 22/02/2019 An introduction course on InWEnt Blended-learning.
HERITAGE PLUS – Management Group Meeting
WordPress Unit Web Coordinators
Wrap up of agenda item no. 3
Title Goes Here Name(s), Organization, CEOS Affiliation
- Kick-off meeting - ERANET Cofund BlueBio WP4 (Leader: AEI)
Title Goes Here Name(s), Organization, CEOS Affiliation
WP7 – Related activities
Presentation transcript:

12-13 July 2011, University of Rome "La Sapienza" Rome, Italy pSHIELD Consortium Meeting Przemyslaw Osocha, SESM, Andrea Fiaschetti, UNIROMA1,

All rights reserved © 2010 Page 2pSHIELD Host – University of Rome "La Sapienza" DIS - Dipartimento Informatica e Sistemistica Faculty of Information Engineering University of Rome "La Sapienza" Via Ariosto, 25, Rome, Italy Prof. Francesco Delli Priscoli Andrea Fiaschetti

All rights reserved © 2010 Page 3pSHIELD Sponsors Prof.Francesco Delli Priscoli –Coffee breaks Selex Elsag –Lunch Everyone –Dinner (table reserved in restaurant, 12 July, 20:00)

All rights reserved © 2010 Page 4pSHIELD Agenda 12. July, 12:00-18:10 12:00-14:00 Lunch 14:00-14:10 Welcome by the host [UNIROMA1] 14:10-14:20 Meeting agenda and expected output [SESM] 14:20-15:45 What to deliver in pShield and what to demonstrate in September and January? [MAS, All] 15:45-16:15 Coffee Break 16:15-18:10 Dissemination session / partners prototypes presentation [CWIN, All] (some time left after each presentation for discussions) 16:15-16:35 Integration & Interoperation of Sensors with M2M platform, Sarfraz and Mushfiq.Chowdhury (CWIN) Mushfiq.Chowdhury 16:40-16:55 A Prototype of Middleware+Overlay - SELEXELSAG + University of Roma 17:00-17:15 A Prototype of Matrix Approach towards SPD.... SELEXELSAG + University of Roma 17:20-17:30 FPGA Power Node Prototype, Task 3.2, SESM+ETH, Przemyslaw.Osocha (SESM) and Emilio.Bisbiglio (SESM) Przemyslaw.Osocha 17:35-17:50 A Prototype from Inaki-Technalia 17:55-18:10 A Prototype from THYIA 13. July 2011, 09:00-15:00 09:00-10:00 pSHIELD status and documents [SESM, SE, All] TA, APCA, etc. 10:00-10:30 Project Collaboration Tools – workshop [SESM, CWIN] 10:30-11:00 Coffee Break 11:00-12:00 Round table 12:00-13:00 Lunch 13:00-14:30 WPs work Reports from WP leaders Status of deliverables Upcoming deliverables Time line to contribute 14:30-15:00 Summary, next meeting and action items

All rights reserved © 2010 Page 5pSHIELD Agenda details The first day: –Discussion on what is project main demonstrator and additional prototypes, and what to cover in deliverboards. –Next during dissemination session partners prototypes will be presented to exchange technical knowledge. The second day: –Starts with discussion on TA and other documents, based on demonstrator decisions from the first day. –Then short demonstration of pSHIELD Collaboration Tools should ensure continuation of consortium cooperation. –The last point is work in WPs to realize the demonstrator and TA update taken decisions.

All rights reserved © 2010 Page 6pSHIELD Day 1: What to deliver? What to deliver in pShield and what to demonstrate in September and January? [MAS, All] It is starting topic leaded by MAS, topic should give answers: What do we want to deliver in pShield Project at all? What we will demonstrate in September at JU review in form of deliverboards content and main demonstrator and side additional prototypes. What we will demonstrate in January at the end of Project as Project Outcome, in form of deliverboards content and demonstrators. The main topic is what we will demonstrate in September.

All rights reserved © 2010 Page 7pSHIELD Day 1: Dissemination session Dissemination session / partners prototypes presentation [CWIN, All] Internal dissemination session to know about each other's works (relevant to pSHIELD areas) closely so we can get better understanding, coherence and probably make use of some results for pSHIELD purposes. In Internal Dissemination Session, partners may present pSHIELD relevant R&D activities results, additional demonstrators can also be presented. Thus the session may bring out Interesting points that can be incorporated into some of the future deliverables. The discussion will feed valuable information to the WP Status on the next day. This session should give technical support to earlier Demonstrator discussion. Partners will see their demonstrators and may take final decision.

All rights reserved © 2010 Page 8pSHIELD Day 2 - Collaboration Tools Project Collaboration Tools – workshop [SESM, CWIN] Since this is probably last PA meeting (except JU reviews), it is extremely important to enforce off-line collaboration in consortium. pSHIELD WebSite: our business card for outer world, pSHIELD Wiki: –general structure, location of help file, Important Links menu, –collaboration, introduction of scientific text, discussion and modification of text, list of changes may be reviewed –PhC organization, input of date and phone number, input of Agenda, input of MoM, online MoM commenting/review. pSHIELD Repository (bscw server): directory structure and content, where is what, where to put something. It should be short, we only need to show and attract to wiki possibilities, then people should start their researches themselves.