March 11, 2011 RPG Meeting Lower Rio Grande Valley (LRGV) Import.

Slides:



Advertisements
Similar presentations
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Advertisements

Overview of ERCOT Outage Coordination Woody Rickerson Director Grid Coordination January 2015.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
Nov 11, 2011 RPG Meeting Cross Valley Brownsville Loop Project – Status report.
Outage Coordination Overview D.W. Rickerson ERCOT Outage Supervisor 12/1/2008.
System Voltage Planning Brian Moss PD / Transmission Planning Transmission Planning Overview October 30, 2007.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
Valley Import Overview Jeff Billo Regional Planning Group Meeting July 22, 2014 Preliminary1.
2011 Long-Term Load Forecast Review ERCOT Calvin Opheim June 17, 2011.
The Status Of The Electric Grid In ERCOT The Electric Reliability Council Of Texas Sam R. Jones, P.E. ERCOT – Retired As a retiree of ERCOT this presentation.
2001 & 2002 Energy Preparedness Tucson Electric Power February 16, 2001 Michael Flores, Manager Control Area Operations David Hutchens, Manager Wholesale.
5/17/2000Summer Preparedness /17/2000Summer Preparedness SRP SUMMER PREPAREDNESS 2000 Presented to the Arizona Corporation Commission May.
Transmission Planning Process Discussion Joint PLWG / CMWG Meeting Presented by: Luminant Energy June 14, 2011.
FRCC Seasonal Transmission Assessment & Operational Seasonal Study Winter 2012.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
ERCOT Reliability Operations Subcommittee Meeting June 10, 2010 Austin, Texas AEP-Texas: Load Projections/Forecasting and Steady State Base Cases.
Farmers Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
Houston Area Dynamic Reactive Project March 11,
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
NRG Comments/Concerns with HIP Assumptions January 21, 2014 RPG Meeting NRG Comments/Concerns with HIP Assumptions - January 21, 2014.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
Oct 14, 2011 RPG Meeting Cross Valley Brownsville Loop Project – Status report.
April 16, 2010 RPG Meeting ERCOT Five-Year Transmission Plan Update Jeff Billo.
Load Data for Vermont Docket 7081 workshop 9/30/05.
Grayson Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
Reliability Requirements Bill Blevins Manager of Operations Support ERCOT.
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
John Dumas Director of Wholesale Market Operations Jeff Billo Manager of Mid Term Planning Dan Jones Director with Potomac Economics, the ERCOT IMM Board.
Constraint Management Plans (CMPs) An Ops Planning Perspective Nitika Mago Operations Planning, ERCOT.
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
Generation assets important to the reliable operation of the Bulk Electric System What does this mean?
ERCOT PUBLIC 4/21/ RTP: Cascade Analysis April 21, 2015.
Chad Thompson, ERCOT Special ROS PGRR011 Workshop October 21 st, 2011 SCED Overview and Results.
SM April Peak Week Operations Review Presentation to ISO Business Issues Committee May 22, 2002.
September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities.
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
AEP Corpus Christi TDC Advance Outage Scheduling Initiative.
2016 Long-Term Load Forecast
Blue Grass Energy Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
Licking Valley Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by : East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
Jeff Billo Manager, ERCOT Transmission Planning Kenedy to Nixon to Seguin Line Upgrade Project Regional Planning Group (RPG) Review; ERCOT Independent.
Operations Report Kent Saathoff System Operations ERCOT.
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
October 16, 2009 RPG Meeting ERCOT Independent Review of the Corpus Christi Improvements Project Jeff Billo.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
Constraints Competitiveness Tests (CCT) Results Analysis of 2010 SSWG Peak Summer Case Presented to CMWG 1/27/2010.
SERC Reliability Corporation 1 SERC RELIABILITY CORPORATION MID-AMERICA RELIABILITY CONFERENCE June 21, 2006 COLUMBUS, OHIO.
Response to TAC Questions on PGRR031 TAC– January 28, 2014 Jeff Billo, ERCOT 1.
ERCOT Transmission Planning Overview
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Sep 16, 2011 RPG Meeting Cross Valley Brownsville Loop Project – Status report.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Freeport Area Master Plan Project -
Modeled Load Levels in the Valley
Transmission Planning in ERCOT- Overview
Barrilla Junction Area Transmission Improvements Project
Reliability and Operations Subcommittee Report
DEC System Voltage Planning - June 2018
TONBRIDGE POWER GREEN LINE
Presentation transcript:

March 11, 2011 RPG Meeting Lower Rio Grande Valley (LRGV) Import

2 March 11, 2011RPG Meeting Lower Rio Grande Valley interface Valley Interface 1. North Edinburg - Lon Hill 345 kV 2. Ajo – Rio Hondo 345 kV 3. Raymond 2 – MV Yutt 138 kV 4. North Edinburg - Rachal 138 kV 5. Roma Switch – Falcon Switch 138 kV

3 March 11, 2011RPG Meeting Existing LRGV System The AEP-TCC, Sharyland Utilities, Magic Valley Electric Cooperative (MVEC) and Public Utilities Board of Brownsville (PUB) transmission system currently serve approximately 2,200 MW of summer peak demand in the LRGV area. There are three combined-cycle generating stations in the LRGV with a combined capability of 1,592 MW. Additionally PUB has 4 units totaling approximately 120 MW on the eastern side of the LRGV.

4 March 11, 2011RPG Meeting LRGV System Load Growth The McAllen-Edinburg-Mission and Brownsville-Harlingen- San Benito areas are has grown significantly in the past few years (15 year average annual MW growth, based on the summer peaks is ~ 63 MW * or ~ 4.3% * ). Extremely cold weather can result in a winter peak demand to significantly exceed the forecast and the summer peak levels. Extreme cold weather on February 3, 2011 has set an all-time new record peak of approximately 2,734 MW. Historical data (by AEP) indicates that in the past 15 years the winter peak demand has exceeded the summer peak four times (1997, 2007, 2010 & 2011) * excluding PUB area

5 March 11, 2011RPG Meeting Actual Summer and Winter Peak for LRGV for past 15 years

6 March 11, 2011RPG Meeting Actual Summer and Winter Peak for LRGV since 2007

7 March 11, 2011RPG Meeting LRGV Winter Peak & Temperature correlation

8 March 11, 2011RPG Meeting Summer Peak & Temperature correlation

9 March 11, 2011RPG Meeting SSWG Planning Case - LRGV Area Summary Valley Area Load (MW) Winter Peak – 2010/2011 SSWG model Summer Peak YTP model Units Summer Peak Max. Capacity (MW) Winter Peak Max. Capacity (MW) Frontera Frontera Frontera Hidalgo Hidalgo Hidalgo 3171 Magic Valley Magic Valley Magic Valley Silas Ray Silas Ray Silas Ray Silas Ray Total Capacity

10 March 11, 2011RPG Meeting LRGV Power Flow Analysis The power flow analysis indicates the limiting contingency is the loss of a 345 kV transmission line, with the largest LRGV generation station out of service (all combined cycle facility). The above NERC category C contingency falls with in the ERCOT planning criteria section “In the case of a Combined Cycle Facility, a “single generating unit” experiencing a forced outage shall be defined as the entire train unless the combustion turbine and the steam turbine can operate separately”. Based on the 5YTP models the worst contingency results in the overload of the remaining 345 kV transmission line in 2014 summer peak condition at load level of 2,426 MW.

11 March 11, 2011RPG Meeting 2015 Summer Peak Power Flow : Base Case

12 March 11, 2011RPG Meeting 2015 Summer Peak Power Flow : Generating Station out of service kV line

13 March 11, 2011RPG Meeting LRGV Voltage stability Analysis The voltage stability analysis indicates that the NERC Category C contingency limits the import capability to the LRGV. Based on the 5YTP model, the voltage stability limit for the LRGV is approximately 2,560 MW. The actual steady state voltage limits could be lower than the voltage stability limit.

14 March 11, 2011RPG Meeting 2011 Summer Peak Voltage Stability

15 March 11, 2011RPG Meeting LRGV Thermal/Voltage stability Summary The thermal limits based on the current ERCOT SSWG planning model/criteria will exceed by The voltage stability only exceed the thermal limits by approximately 150 MW. The voltage stability limits being so close to the thermal limits indicate that increasing the thermal capacity of the existing LRGV interface would not significantly improve the load serving capacity. There is a need for transmission or market solution in the LRGV to meet the forecasted load beyond 2014.

16 March 11, 2011RPG Meeting Operational issues affecting the LRGV A major operational issue is the difficulty to grant clearances for both transmission and generation maintenance outage in the LRGV. There is a limited time windows to grant maintenance outages in the LRGV and any extreme weather during this period could require load shed. There is a potential for severe weather (hurricanes) that could affect both the existing 345 kV lines sourced from the Corpus Christi area and significantly reduce the load serving capability in the LRGV.

17 March 11, 2011RPG Meeting Historical AEP-TCC Valley Load Data Historical AEP-TCC Valley load data presented in the next few slides provide show some evidence of peak windows. Based on the McAllen, Texas weather station data back to1960.

18 March 11, 2011RPG Meeting Historical AEP-TCC Valley Load

19 March 11, 2011RPG Meeting Historical AEP-TCC Valley Load

20 March 11, 2011RPG Meeting Historical AEP-TCC Valley Load McAllen, TX Annual Minimum Daily Average Temperature (1960 to Present) Only 6 times in the last 51 years has McAllen's annual minimum daily average temperature been 32 or below. It is the first time since 1997.

21 September 17, 2010RPG Meeting March 12, 2010 Questions?