Rough-Cut Capacity Planning in SCM EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2012.

Slides:



Advertisements
Similar presentations
Lesson 08 Linear Programming
Advertisements

Master Data for SCM (1) Master Data for Demand Planning & Fulfillment Processes EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2012.
Linear Programming Using the Excel Solver
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Resource Planning Chapter 14.
Strategic Allocation of Resources
The Material Requirements Planning Process
©© 2013 SAP AG. All rights reserved. Scenario/Processes Make-to-Stock Scenario Overview Planning Supply Initiating Production Executing Production Processing.
Production Planning Processes Theories & Concepts
The MRP II Hierarchy. Long-Range Planning At the top of the hierarchy we have long-range planning. This involves three functions: resource planning,
Rough-Cut Capacity Planning in SCM EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Transportation Planning EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Integrated Distribution & Production Planning (DP/PP) EIN 5346 Logistics Engineering (MSEM, Professional) Fall, 2013 Integrated Distribution & Production.
Production Planning Processes EGN 5620 Enterprise Systems Configuration (Professional MSEM) Fall, 2012.
Concepts in Enterprise Resource Planning Third Edition Chapter Four Production and Supply Chain Management Information Systems.
Scheduling.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
Deployment & Available-to-promise (ATP) in SCM EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Master Data for SCM (1) Master Data in Demand Planning & Fulfillment Processes EGN 5346 Logistics Engineering (MSEM, Professional) Fall, 2013.
Aggregate Planning, MRP, and Short Term Scheduling 9 Aug 2001.
1 Material Requirements Planning or as we in the business like to call it - MRP Constrained Lot Sizing.
Supply Chain Management AN INITIATIVE BY: VAINY GOEL BBA 1 MODI COLLEGE.
Rough-Cut Capacity Planning in SCM EIN 5346 Logistics Engineering (MSEM, Professional) Fall, 2013.
SCM Master Data - 2 Master Data for Distribution & Production Processes EGN 5346 Logistics Engineering (MSEM, Professional) Fall, 2013.
Sinha and Kotzab: Supply Chain Management, Copyright © 2012 by Tata McGraw-Hill Education CHAPTER 8 Production Planning and Scheduling.
1 Copyright © 2004, Manugistics, Inc. All rights reserved. Objectives At the end of this section you will be able to:  Understand the key pains and challenges.
Production Planning and Detailed Scheduling (PP/DS) in SCM EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
SCM Master Data - 2 Master Data for Distribution & Production Processes EGN 5623 Enterprise Systems Optimization Fall, 2012.
Orange County Convention Center Orlando, Florida | June 3-5, 2014 Planning Board Experiences – Scheduling and More Julie Lushbough and Veronica Morris.
DISTRIBUTION AND NETWORK MODELS (1/2)
Chapter 17 Scheduling. Management 3620Chapter 17 Schedule17-2 Overview of Production Planning Hierarchy Capacity Planning 1. Facility size 2. Equipment.
Master Data for SCM (1) Master Data in Demand Planning & Fulfillment Processes EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Transportation Planning EIN 5346 Enterprise Systems Optimization Fall, 2015.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
Integrated Distribution & Production Planning (DP/PP) EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011 Integrated Distribution &
Intelligent Supply Chain Management Strategic Supply Chain Management
Concepts in Enterprise Resource Planning Third Edition Chapter Four Production and Supply Chain Management Information Systems.
CHAPTER SEVENTEEN SCHEDULING Chapter 17 Scheduling.
SCM Master Data - 2 Master Data for Distribution & Production Processes EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Integrated Distribution & Production Planning (DP/PP) EIN 5346 Logistics Engineering Fall, 2015 Integrated Distribution & Production Planning (DP/PP) EIN.
Systems Integration EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011 Systems Integration EGN 5623 Enterprise Systems Optimization.
Rough-Cut Capacity Planning in SCM EIN 5346 Logistics Engineering Fall, 2015.
Transportation Planning EIN 5346 Enterprise Systems Optimization Fall, 2015.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
Introduction to Quantitative Business Methods (Do I REALLY Have to Know This Stuff?)
Lecture 5 Master Product Scheduling Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College, Emeritus,
Transportation Planning EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2012.
Rough-Cut Capacity Planning in SCM Theories & Concepts
Online | classroom| Corporate Training | certifications | placements| support CONTACT US: MAGNIFIC TRAINING INDIA USA :
Online | classroom| Corporate Training | certifications | placements| support CONTACT US: MAGNIFIC TRAINING INDIA USA :
CONCEPTS IN ENTERPRISE RESOURCE PLANNING FOURTH EDITION Chapter Four Production and Supply Chain Management Information Systems.
MRP (Material Requirement Planning) The main function of material requirements planning is to ensure material availability on time. MRP helps monitor the.
Concepts in Enterprise Resource Planning Third Edition
Make-to-Stock Scenario Overview
Schlenker, H. , R. Kluge, and J. Koehl
Rough-Cut Capacity Planning in SCM Theories & Concepts
Rough-Cut Capacity Planning in SCM EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Make-to-Stock Scenario Overview
ERP & APO Integration Theories & Concepts EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Deployment & Available-to-promise (ATP) in SCM Theories & Concepts
Chap 11 Learning Objectives
Planning and Scheduling in Manufacturing and Services
SCM Master Data - 2 Master Data for Distribution & Production Processes EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Transportation Planning Theories & Concepts EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Enterprise Systems Optimization Spring, 2012
Integrated Distribution & Production Planning (DP/PP) EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2012.
Integrated Distribution & Production Planning (DP/PP) EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Production Planning and Detailed Scheduling (PP/DS) in SCM EGN 5623 Enterprise Systems Optimization Fall, 2012.
SCM Master Data - 2 Master Data for Distribution & Production Processes EGN 5346 Logistics Engineering Fall, 2015.
Master Data for SCM (1) Master Data in Demand Planning & Fulfillment Processes EGN 5346 Logistics Engineering Fall, 2015.
Presentation transcript:

Rough-Cut Capacity Planning in SCM EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2012

Rough-Cut Capacity Planning in SCM Theories & Concepts EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2012

Hierarchical Planning Framework (review) Procurement Production DistributionSales Long term -Material programs - Supplier selection - Cooperation - Plant location - Production systems - Subcontractors - Physical distribution structure - Transportation strategy - Product program - Strategic sales planning -- Personnel training -- Contracts -- Material Requirements Planning -- Master production Scheduling -- Capacity planning-- Distribution planning-- Mid-term sales planning Mid term -- Personnel scheduling -- Material ordering -- lot-sizing - operations scheduling - shop floor control - Warehouse replenishment - Transportation planning-- Mid-term sales planning Short term EXECUTION InformationFeedback Flow of goods

The APICS-Standard Planning Framework (review)

Production Process (review) Requirements for Production Planning: to meet the demand to consider the resource capacities and the material availabilities to improve utilisation of the resources to lower the setup time to minimize the stock, and to minimize the work in process (WIP) to improve stability of the plan

Rough-cut Capacity Planning The main goal in rough-cut capacity planning is to identify where overloading or under-loading of production capacity occurs and revise the MPS as required. Overloading means that too much production of products has been planned in the facility and insufficient capacity exists to produce planned quantities of products required in MPS. Under-loading means that not enough production of products has been planned to fully load the facility.

Rough-Cut Capacity Planning in APO-SNP

Order Life Cycle for Make-to-Stock

Order Life Cycle for Make-to-Order

Forecast Consumption Mode and Horizon (Backword consumption of 4 days and a forward consumption of 3 days)

Transactional Data for Transferring Starting from a demand plan, SNP checks the resource capacities and delivers a medium/long-term plan for the estimated sales volumes. The plan includes the quantities to be transported between locations (e.g., DC-customer, or plant-DC) and the quantities to be produced (and procured), taking available capacity into consideration. SNP creates planned orders, purchase requisitions, and stock transfers that can be transferred directly to the connected OLTP systems.

Capacity Levelling Capacity leveling supports the following resource categories: Production resources Transportation resources Capacity levelling supports the following resource types: Bucket resources Single-mixed resources Multi-mixed resources Transportation resources

Capacity Levelling The planner can use the following methods to adjust the plan: Backward scheduling of the capacity load to fulfill demand using high priorities without due date violations. This rescheduling does not create any orders in the production horizon. Forward scheduling of the capacity load for lower priority demand and use of demand priorities to minimize due date violations A combination of backward and forward scheduling of the capacity load.

Capacity Levelling Profile The main settings in the capacity leveling profile are scheduling direction, prioritization, and method. Scheduling Direction controls whether Forward, Backward or Combined scheduling is used. Prioritization for the heuristic run defines how leveling determines the sequence of orders. The two possible choices for prioritization (to be sorted by ascending or descending order) are by order size or by product priority. The three Method choices are Heuristic, Optimizer or Badi (Business Aided-in).

Time-based Capacity Levelling

Capacity Levelling

Heuristics-based Capacity Levelling Heuristic-based capacity leveling compares, period by period, the capacity load on a resource with the requested load, either from the beginning or from the end of the planning horizon – depending on which scheduling direction is selected (forward or backward scheduling). If the resource is found overloaded, the system first selects all the activities or orders that cause the overload in this period. It then sorts these orders according to the priority that is defined and shifts orders or partial orders, one by one into subsequent or previous periods until the required maximum resource utilization is reached.

Heuristics-based Capacity Levelling For forward scheduling, the system moves the orders so far that the first activity using the resource to be leveled only begins after the overloaded period. For backward scheduling, the system moves the orders so far that the last activity using the resource to be leveled actually ends before the overloaded period. The system takes the lot sizes and rounding values defined in the master data into account when moving the orders.

SNP Heuristic as Location, Network, and Multi-Level Heuristic

Scheduling in SNP Heuristic

Period Factor

Production Scheduling for Multiple BOM Levels

Scheduling in CTM

Heuristics-based Capacity Levelling Only orders that cause overloads are changed. This proves advantageous when a lot of orders exist but only some of them overload the resource. Prioritization is done by product or by product quantity. Select “Capacity Leveling” from the menu to balance the required work loads.

Benefits of SNP with SCM The benefits of Supply Network Planning with SAP SCM are as follows: 1.Cross-plant medium-term rough-cut planning 2.Cross-plant optimization of resource utilization Simultaneous planning of procurement, production and distribution Simultaneous material planning and finite capacity scheduling of production, storage, and transportation resources 3.Planning of critical components and bottleneck resources 4.Prioritization of demands and receipts 5.Collaborative supply planning over the Internet

Linear Programming (LP) EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2012 Linear Programming (LP) EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2012

Operation Research (OR) Operation research refers to the application of quantitative methods and techniques to business problems in order to best utilize a company’s resources. OR is used by many leading companies in recent years to optimize their limited resources in order to maximize their profits or minimize their costs. Linear programming (LP) is one of the most important tools of operation research.

Linear Programming (LP) Five common types of LP problems: Product mixed Ingredient mix Transportation Production plan Assignment

Five common types of LP problems

Five common types of LP problems Five common types of LP problems

Steps in Formulating LP Problems 1.Define the objective 2.Define the decision variables 3.Write the mathematical function for the objective (objective function) 4.Write a one- or two-word description of each constraints 5.Write the right-hand side (RHS) of each constraint, including the unit of measure. 6.Write = for each equation 7.Write all the decision variables on the left-hand side of each constraints 8.Write the coefficient for each decision variable in each constraint.

Formulating LP

Formulation LP

Formulation of Problem

Objective and Constraints

Steps in Graphical Solution Method

Graphical Solution

Transportation (Network) Problem

Requirement Assumption

Feasible Solutions Property

Cost Assumption

Parameter Table for Transportation Problem Supply S 1 S 2. S m

Transportation Problem Model Any problems (whether involving transportation or not) fits the model for a transportation problem if it can be described completely in term of a parameter table like Table 8.5 and it satisfies both the requirements assumption and cost assumption. The objective is to minimize the total cost of distributing the units. All the parameters of the model are included in this parameter table.

Objective Function & Constraints

Rough-Cut Planning in SCM SAP Implementation EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2012 Rough-Cut Planning in SCM SAP Implementation EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2012

Planning Book and Views

Capacity Check view Now switch to the CAPACITY CHECK view. In the Selection profile section double click on ## RESOURCES. Double click on the work center (plant ##A1). Switch the TB Profile to 12MONTH. We appear to have enough capacity in the work center at the aggregated monthly level. Now change the TB Profile to 180 DAYS. We are overloaded in the first couple days as SCM has tried to produce all that is needed to satisfy safety stock in those days.

Capacity Levelling Scroll over to the next capacity usage. We are also overloaded in those periods. Multilevel Heuristic does not take capacity into consideration. Select

Key Figures and Category Group in SNP Standard Planning Book

1. Please solve the following LP problem. Objective:Min Z = 10,000 X ,000 X 2 S.T. X 1 + 2X 2 >= 4 X 1 + X 2 >= 2.5 1) Draw a graph 2) Plot the constraint function 3) Outline the feasible solution 4) Circle the optimal solution point. HW 6: Exercises:

2. The Green Up Fertilizer Company ships fertilizer from three manufacturing plants to four distribution centers (DC). The shipping cost per truckload of fertilizer from each plant to each DC is: PlantDistribution Center (DC) ABCD 1$464$513$654$867 2$352$416$690$791 3$995$682$388$685 Plant 1 has a monthly capacity of 75 truckload, Plant 2 has a monthly capacity of 125 truckload, and the Plant 3 has a monthly capacity of 100 truckload. The monthly DC demand is A = 80 truckload, B = 65 truckload, C = 70 truckload, and D = 85 truckload. Please formulate an LP problem to determine how much truckload of fertilizer should be shipped from each plant to each DC per month to minimize monthly shipping cost. 1) Define the objective. 2) Define the decision variables. 3) Write the mathematical function for the objective. 4) Write the constraints. 5) Solve the LP problem