Supported by NSTX Departmental Safety Meeting Jan. 17, 2005 Columbia U Comp-X GA INEL JHU LANL LLNL Lodestar MIT Nova Photonics NYU ORNL PPPL PSI SNL UC.

Slides:



Advertisements
Similar presentations
Job Loss Analysis Overview
Advertisements

Health and Safety - an update Ian Gillett Safety Director.
San Bernard Electric Cooperative, Inc. Arc Flash Assessment.
June 1, 2015 Environmental, Health and Safety Services Compliance Expectations and University Policy 1005.
Safety and Health Programs
Electrical Safety Training
Responsible CarE® Employee health and Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
CHAPTER 2 – ROLES OF CONSTRUCTION PERSONNEL IN SAFETY AND HEALTH
WELCOME New Safety Coordinators! New Safety Coordinator Spring Orientation January 24, 2012.
© Business and Legal Reports, Inc Alabama Retail is committed to partnering with our members to create and keep safe workplaces. Be sure to check.
Objectives  Understand what a Loss Incident is.  Know the real cost of a Loss Incident.  Understand the Causes of a Loss Incident.  Understand what.
Safety Meeting Policies, Commitment & Culture January 2010 EDM Services, Inc.
Safety Unit II.
Safety & Project Management by NABEEH JUM’AH. Eye on Safety  Proactive  Reactive.
1 29 CFR THE CONTROL OF HAZARDOUS ENERGY.
ACCIDENT PREVENTION. Accident Prevention Information obtained from an accident investigation is used to help prevent future accidents from happening.
Basics of OHSAS Occupational Health & Safety Management System
1/18/2005Module 41 How the NCSX Project Does Business Work Planning & Design Review Processes.
NSTX Team Meeting June 25, 2010 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
NSTX XP830 review – J.W. Berkery J.W. Berkery, S.A. Sabbagh, H. Reimerdes Supported by Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL.
OSHAX.org - The Unofficial Guide To the OSHA1. Benefits of Effective Safety and Health Programs Reduce work related injuries and illnesses Improve morale.
Part 3.3 Production Safety. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand safety.
J. Manickam, C. Kessel and J. Menard Princeton Plasma Physics Laboratory Special thanks to R. Maingi, ORNL and S. Sabbagh, Columbia U. 45 th Annual Meeting.
Health and Safety Policy
NSTX NSTX Team Meeting Jan. 3, 2013 NSTX Team Meeting Jan. 3, 2013 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
NSTX Team Meeting May 28, 2008 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL.
Work-Specific Hazard Checklist (WSHC) May 20, 2013 Mark Berkheimer, CHMM ORAU EH&S Specialist 3/Chemical Hygiene Officer 1.
Chapter 5 Firefighter Safety.
Quality Assurance Readiness for Operations Review Judy Malsbury, Head of QA Princeton Plasma Physics Laboratory NSTX Upgrade LSB B318 December 9-11, 2014.
Hazards Identification and Risk Assessment
Brian Goepfert District Staff Assistant Metal/Non-metal Rocky Mountain District Denver, CO
1 Update on Run Schedule R. Raman NSTX Team Meeting PPPL, Princeton, NJ, 08 February, 2006 Work supported by DOE contract numbers DE-FG02-99ER54519 AM08,
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
NSTX Team Meeting July 21,, 2011 NSTX TF Update NSTX Team Meeting July 21, 2011 NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
Supported by NSTX Team Meeting June17, 2004 Columbia U Comp-X GA INEL JHU LANL LLNL Lodestar MIT Nova Photonics NYU ORNL PPPL PSI SNL UC Davis UC Irvine.
Beam Ion Profiles with the SSNPA Diagnostic Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics NYU ORNL PPPL.
Responsible Care® Health & Safety Task Force – 06 H&S.
Supported by NSTX Team Meeting March 23, 2005 Columbia U Comp-X GA INEL JHU LANL LLNL Lodestar MIT Nova Photonics NYU ORNL PPPL PSI SNL UC Davis UC Irvine.
Division of Risk Management State of Florida Loss Prevention Program.
Survival Skills for Supervisors Safety Leadership and Building a Safe Community Presenter: Mark Linsenbigler Environmental Health and Safety
Safety Training. “For safety is not a gadget, but a state of mind.” Eleanor Everet.
NSTX-U Construction Erik Perry Princeton Plasma Physics Laboratory NSTX Upgrade Readiness to Operate Review LSB B318 December 9-11, 2014 NSTX-U Supported.
Program Mangers Cross Training Presentation Programs Program Manager Name Date of Presentation Template.
Safety Jerry Levine Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318 May 2 - 3, 2012 NSTX-U Supported by Culham.
NSTX Team Meeting February 7, 2007 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U.
1 Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics NYU ORNL PPPL PSI SNL UC Davis UC Irvine UCLA UCSD U Maryland.
NSTX Team Meeting December 21, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
NSTX NSTX Team Meeting May 7, 2013 NSTX Team Meeting May 7, 2013 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
Tom Egebo PPPL Review of the NSTX TF Coil Repair Effort September 3 - 4, 2003 Cost & Schedule to Completion Supported by Columbia U Comp-X General Atomics.
Supported by Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics NYU ORNL PPPL PSI SNL UC Davis UC Irvine UCLA.
NSTX Team Meeting June 30, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
NCSX Hutch Neilson NCSX Project Manager NCSX Team Meeting January 20, 2005 Meeting Our Safety Management Responsibilities.
1 Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics NYU ORNL PPPL PSI SNL UC Davis UC Irvine UCLA UCSD U Maryland.
Preliminary Results from XP1020 RFA Measurements J.W. Berkery Department of Applied Physics, Columbia University, New York, NY, USA NSTX Monday Physics.
NSTX NSTX Team Meeting –Masa Ono August 15, 2014 NSTX-U Team Meeting August 15, 2014 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
OHSAS Occupational health and safety management system.
Gasunie is one of the biggest gas infrastructure companies in Europe. Within the company, we give safety the highest priority; it forms the basis of our.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
NSTX Team Meeting April 5, 2006 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL.
- HEMIC Facility Inspections. Common Losses A fire breaks out in a 16 story office building An employee had the tips of two fingers amputated Could these.
NSTX NSTX Upgrade Project – Final Design ReviewJune 22-24, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
Instructions The Town of Sylvan Lake’s computer based health and safety orientation is simple process. Read each slide carefully To navigate through slides.
Safety Committee Formation
An Integrated Risk Management & Safety Program: IRMSP
CHAPTER 2 – ROLES OF CONSTRUCTION PERSONNEL IN SAFETY AND HEALTH
Job Safety Analysis.
Instructions The Town of Sylvan Lake’s computer based health and safety orientation is simple process. Read each slide carefully To navigate through slides.
Ian Evans SSRL Safety Office
Safety Program for LCLS Experiments
Presentation transcript:

Supported by NSTX Departmental Safety Meeting Jan. 17, 2005 Columbia U Comp-X GA INEL JHU LANL LLNL Lodestar MIT Nova Photonics NYU ORNL PPPL PSI SNL UC Davis UC Irvine UCLA UCSD U Maryland U New Mexico U Wash U Wisc UKAEA Fusion Hiroshima U HIST Kyushu Tokai U Niigata U Tsukuba U U Tokyo Ioffe Inst TRINITI KBSI KAIST ENEA Frascati

Safety issues discussed with divisional heads Distributed the SLAC accident report summary to the NSTX research team members including collaborators and students on Jan. 6. Joanne Savino - compiling record All on-site NSTX researchers including collaborators and students to attend this experimental department safety meeting on Jan 14 A dedicated safety meeting for NSTX researchers to discuss more NSTX specific issues to be held on Jan. 17. Report to the NSTX Plan to the ES&H executive board (Jan. 19) NSTX Department Plan

1:30 NSTX Department Safety Plan 1:40 Some takeaways from Joel’s meeting last Friday 2:00 NSTX Specific Issues 2:30 Visitor requirements 3:00 Adjourn NSTX Team Meeting Agenda

An arc flash can cause a powerful explosion Very rapid melting and vaporization of copper produces intense radiation, a powerful shock wave, and molten copper spray Burning, knockdown, hearing loss, shrapnel impact effects can occur

SLAC Accident Report Summary/Root Causes No “safety first” culture – from SLAC management – from DOE Stanford Site Office No safety priority - operations consistently put before safety No Integrated Safety Management by RLM –No Work Plan for this specific job No need to work energized at all!!!! –No procedures or permits for this job –No Job Hazard Analysis No FR (fire retardant) clothing or correct PPE (personnel protective equipment) –No stop work order by job supervision, backup, or others RLM not trained to supervise the subcontractors No Safety staff involvement; not OSHA compliant No improvement in safety culture despite earlier warning signs Huge Impacts on SLAC - Established Re-start Team But a good fraction of year’s operations lost

ENERGY SOURCE HAZARDS Electrical Mechanical Hydraulic Chemical Potential Radiological Noise Laser Magnetic Cryogenic Pneumatic Thermal Magnetic Cryogenic To name a few…… We must protect against all hazards at PPPL and host institutions We do this by strongly adhering to the integrated safety management (ISM) work policies and practices of PPPL for all activities (this would have prevented the accident at SLAC) ISM must be followed by everyone at PPPL for all activities

Why Integrated Safety Management? Safety doesn’t happen by “accident.” (GET) Objective - Integrate safety into management and work practices. The rules under ISM are there for our protection 7 ISM Guiding Principles 1.Line management responsibility for safety 2.Clear roles and responsibilities for people and supervisors/hosts up the chain-of-command 3.Competence commensurate with responsibilities 4.Balanced priorities - safety is always priority 1 5.Identification of safety standards and requirements 6.Hazard controls tailored to work being performed 7.Operations authorization 

5 ISM Core Functions The five functions that must be applied, on a graded approach, to any ES&H related work activity 1.Define the scope of work 2.Analyze the hazards 3.Develop and implement hazard controls 4.Perform work within controls 5.Provide feedback/improvement  ES&H Procedures and some of the HR training material for carrying out these core functions are listed at

Simple Safety Guidelines Be alert as a matter of habit. –Examine workplace for present and potential hazards If you see something you are not sure of, check it out with your supervisor. Ask questions if something puzzles you! Good housekeeping and organization (keep things under your control!) Frequent Causes of Accidents Failure to communicate Failure to use personal or other protective equipment Assuming the other person is experienced Lack of sound personnel work ethic –Not paying enough attention to risks Taking short cuts - deviating from procedures Giving in to “Hurry-up Pressure” –Not wanting to take the time to work safely Assuming hazards are removed

NSTX hosts a large number of national and international collaborating researchers Researchers from institutions with varied safety cultures and practices No credits given to safety trainings from other DOE labs due to lack of inter-laboratory agreement PPPL contact/host appointed to assist proper paperwork / training / procedures are being followed (need to clarify the host responsibility further) Joanne Savino gives assistance to all incoming researchers and keep departmental records Communication between PPPL and on-site non-PPPL researchers Everyone on list for daily, weekly reports Meetings are open to every members Insure NSTX safe work practice for places outside NSTX Test Cell

PPPL Requirements for Visitors & Collaborators Type of visit: Training & Security Requirement Less than one Week: Fill out Web Notification Form for Security and Domestic Visitor Form ( if U.S. Citizen) or Foreign Visitor Form ( if not U.S. Citizen ) More than one week: Fill our Web Notification Form, Domestic Visitor Form or Foreign Visitor Form, Obtain GET Training from Human Resources, receive badge from Security More than two weeks: All of the above plus a Model Letter of Agreement Collaborators & Visitors whomake multiple visits during a one year period: Fill out the Web Notification Form prior to each visit, no need for Domestic or Foreign Visitor Forms since they are already in the system from first visit. Make sure GET training is valid ( good for three years ). The Host is responsible for addressing the requirements for Collaborators and Visitors who require unescorted access to work in the NSTX Test Cell. The training requirements for unescorted access into the NSTX Test Cell are listed on page 5 of OP-NSTX-012

Special requirements for NSTX Test Cell access o Safety training required for unescorted access to the test cell: Basic Electrical Safety Training - general electrical hazards and lab policies/procedures for controlling these hazards. Electrical Utilization Training (EUT) - required for all personnel involved in the testing and safing of electrical systems >50 Volts. EUT provides training on the safe work practices and personal protection equipment needed for work on high power systems Radiation Safety Training - working understanding of the Radiological Work Permit (RWP) in force for all work in the test cell. Lockout/Tagout Training - general principles and requirements for the control of hazards/energy sources (such as chemical, cryogenic, electrical, hydraulic, mechanical, pneumatic, thermal) via safing/lockout/tagout.

NSTX requires procedures for safe workplace Administrative Procedures - the responsibilities of NSTX staff for a safe workplace. Work Permits (OP-AD-09) - a check for appropriate safety controls implementation and a means of controlling and coordinating work activities Control of Temporary Modifications (OP-AD-03) - a check on impacts of field changes on the effectiveness of any system that is intended to prevent or mitigate injury to personnel or equipment damage Conduct of Operations (OP-AD-39) - expected conduct, behavior, attitude, and responsibility of staff in performing work to ensure safe, professional, and consistent daily operations. Chain of Command (OP-AD-56) - responsibilities for maintaining control of systems and equipment Control of Workplace Cleanliness (OP-AD-24) - guidelines for work around the vessel NSTX Access (OP-AD-117) - the safety interlock systems for the NSTX test cell PPPL lab-wide policies and procedures - direction and tools for working safely: Health and Safety Manual (ESHD-5008) - directives and guidelines for identifying and controlling hazards. Job Hazard Analysis (ESH-04) - a tool for identifying and controlling potential hazards for a specific task or job site. Engineering Work Control Procedures provide guidelines for the planning (ENG0-032), design (ENG-033), implementation (ENG-030), and configuration control (ENG-010) of engineered systems at NSTX

Safety Walk-thru conducted periodically

Feedback on Hazard Awareness and Control… What are the implications of the accident to you? How do we get better?? – What steps are needed to address any safety issues you see for NSTX Please communicate to your supervisors or to me whatever suggestions you have!