Microbial Detection Arrays Interim Review I February 6 th, 2007 Aerospace Senior Projects University of Colorado – Boulder Advisors: Dr. Forbes and Dr.

Slides:



Advertisements
Similar presentations
Fischer Manufacturing is an electrical fabrication company based in New Brighton, MN. We specialize in building to engineering specified requirements.
Advertisements

University of Missouri UNCLASSIFIED Moly-99 Work Group Meeting Molybdenum-99 Thermal/Mechanical/Hydraulic Experimental Tools Update 1 University of Missouri,
Protocol & Test Review Spaceport America Student Launch University/Institution Team Members Date.
Proposal Analysis Review NMSGC Student Launch University/Institution Team Members Date.
Data Test Review Spaceport America Student Launch University/Institution Team Members Date.
Flight Readiness Review New Mexico Space Grant Consortium University/Institution Team Members Date.
P11511 Project Review. Project Team, Faculty, and Customer Project Team: – Project Lead: Kevin Argabright (ME) – Team Members: John Fitch Dean (ME) Mike.
04013 Micro Turbine Senior Design Micro Turbine Senior Design PDR – May 20 th, 2004 Project
Development of Laser Fuser Test Bed Project Number: P07501 Justin McMillan.
Fatigue Life Testing Platform for Electroformed Bellows EEEE Jadon Weinel Hector Vargas Customer: NiCoForm, Inc.Advisor: Dr. E. Debartolo EMEM Richard.
Automotive Lab Development Team Ben Duprey Matt Lazzaro Tim Trapp Pete Vincent Dave Wuchter Aron Youngs.
Team Name Conceptual Design Review University/Institution Team Members Date.
Project Status Update II R09230: Open Architecture, Open Source Unmanned Aerial Vehicle for Imaging Systems A. Benjamin Wager (ME) B. Michael Skube (ME)
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator and X-LAT Assy1 GLAST Large Area Telescope:
Dennis Prentice – Project Manager (ME) Anthony Culotta – Mechanical Engineer Jason Nichols – Mechanical Engineer Belinda Segui – Electrical Engineer Sponsor/Advisor:
04013 Micro Turbine Senior Design Micro Turbine Senior Design CDR – May 14 th, 2004 Project
Redesign of a Submersible Autonomous Data Collection and Transmission System (S.A.D.C.A.T.S.) Group Members: Matthew Rhoads BS ME (Lead) - Ballast, Hull.
Laser Shoot-Out Game By Steven Noto and Laura Miller Advisor Steven Gutschlag February 15, 2000 Senior Project Status.
FINAL PRESENTATION P The Team Austin Frazer Role: Lead Engineer - Analysis Major: Mechanical Engineering Eileen Kobal Role: Lead Engineer – Mixtures.
Mechanical Engineers: Brian Church Tyler Breitung Michael Oplinger Electrical Engineers: Anthony Salmin Ross Bluth Stephen Mroz Sponsor: Dr. Roman Press.
(PDR ) University of Northern Colorado Nathan and Casey 11/14/08.
ELECTRONIC FUEL INJECTION COMPONENTS
Microbial Detection Arrays Critical Design Review December 5th, 2006 Aerospace Senior Projects University of Colorado – Boulder Advisors: Dr. Forbes and.
Digital Microfluidics Control System II P15610 Complete Detailed Design.
Critical Design Review Team Name University/Institution Team Members Date.
Sample System Specialists for Gas Analysis Information on Sample System Capabilities.
Microbial Detection Arrays
The UniWest 4D Rapid Prototype Product Development System Use mouse or arrow keys to scroll through presentation.
FAZIA DAYS, Bologna 10-12/feb/2010, WG8, Emanuele Vanzanella (mechanics & cooling), Alfonso Boiano (electronics) ELECTRONICS HOLDER & COOLING SYSTEM Side.
Jon KleinISEProject Manager Nguyen VuMETechnical Lead Kyle MengesMETechnical Lead Christine LowryMEDesign Engineer Chris SteinMEDesign Engineer Priya NarasimhanEEElectrical.
Cell Culture Stirrer for YSI Design overview: past and present New features Manufacturability improvements.
1 Safety and Preventative Maintenance. 2 MB, One megabyte - MB or M-byte - represents about 1 million (10 6 ) bytes. Precisely, 1 MB = = 1 kB x 1 kB =
Objectives Overview Objective: Create an Earth field unit to test electrochemical sensors Deliverables: –Field-ready unit –Test data verifying requirements.
TEAM 12: Low-Cost, Portable, Off-Grid Biodiesel Production Plant Team Members: James Black Sam Dresser Joey Kilmer Matt Mills Faculty Advisor: Dr. Dave.
THE AVENGERS Measuring Atmospheric Ozone gases. General  The primary goal of the ITO sensor project is to measure the concentration of Ozone (O 3 ) as.
Hy-V.1 Skin Friction Sensor Experiment Presenters: Ryan F. Johnson Mitchell Foral-Systems November 24, 2008 University of Virginia.
Senior Design Team #18 Lacey Ednoff Brianna Beconovich Jarimy Passmore Jesse Poorman.
Preliminary Detailed Design Review P15080 Flow Culture System November 13, 2014.
Individual Subsystem Testing Report New Jersey Space Grant Consortium with Rutgers University Stevens Institute of Technology 2/13/2012.
Gravity Fed System Team Members: Chris Kulbago, Lauren Pahls, Ted Rakiewicz, Patrick O’Connell, Sarah Salmon, James Brinkerhoff Group Number: P
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Compressor status AWAKE Technical Board meeting 19 August 2015.
Switches in Series A heating system is a practical circuit used in homes which has two switches in series. The thermostat switch opens (OFF) when the temperature.
RockSat-C 2012 SITR Full Mission Simulation Report Harding University William Waldron, Joshua Griffith, Drew Cancienne, Edmond Wilson, David Stair 22 April.
Week 10 Review: Old Business Documents P15080 Katelyn Busse Collin Burkhart Michelle Garafolo Robert Repetti Morgan Stoessel Sarah Tran.
CHILLED WATER AIR-CONDITIONING SYSTEMS
PF3W Series 3-Color Display Digital Flow Switch Planned release date: May 2012.
MEP (Martian Environmental Pod) 3/15/2004 Aerospace Engineering Department University of Colorado-Boulder Interim Review #2.
P15080: Flow Culture System Multi-Disciplinary Senior Design Problem Definition Review September 11, 2014 Collin Burkhart – Lead Mechanical Engineer Katelyn.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
The Smart Walker Project TEAM: CHEN ZHANG, YI LU PRESENTED BY: YI LU.
MSD II System Demonstration P15044 – Intelligent Mobility Cane4/16/2015.
Automatic Fire Fighting System Athan Jefferson Advisor Dr. Junkan Ma Instructor Dr. Cris Koutsougeras ET 493 Senior Design I.
Preliminary Design Review Metro State College of Denver Matthew Hanley, Daniel Bass 14 November 2008.
Tank Heating by Various Methods for Metal Finishing and Other Process Heating Applications OVERVIEW 1.
Fish Tank Project Introduction ME 121Portland State University Mechanical and Materials Engineering.
Raffia Siddique National University of Sciences and Technology sector H-12 Islamabad
7 A/C System Components, Operation, and Service.
Tagger and Vacuum Chamber Design Jim Kellie Glasgow University.
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
It’s…….
M1M3 Fan Coil Unit Status Gary Muller & Brian Johnson LSST 2017 Project & Community Workshop 8/17/2017.
Automotive Heating And Air Conditioning
Advisor: Dr. Shangchao Lin
Brooks Expert Support Tool (BEST) Software
Midpoint Project Review P10454 VAD Test Loop
Bill Raynor Naval Research Lab
FINAL PRESENTATION Western Michigan University Advisors:
Voltage Divider.
Presentation transcript:

Microbial Detection Arrays Interim Review I February 6 th, 2007 Aerospace Senior Projects University of Colorado – Boulder Advisors: Dr. Forbes and Dr. Maslanik Customers: BioServe and Tufts University Dave Miller Elizabeth Newton Ted Schumacher Shayla Stewart Steven To Charles Vaughan Sameera Wijesinghe

2 Briefing Overview Overall Design Summary Changes Since CDR Test Plans Schedule Budget Current Issues

3 Overall Design Summary Autoclaves Reagent Water Chamber Peristaltic Pump Mounts Top Shelf Environmental Chamber Reaction Chambers (with Mixers) Mixer Motor Mounts NOTE: Only shows parts to be manufactured

4 Changes Since CDR Mechanical: –Autoclave: Repositioning of screw holes and O-ring groove –Mixer: Rearrangement of impellers, addition of bottom scoop –Environmental chamber: Walls broken up to simplify manufacturing and assembly –Shelves and supports: Sizes standardized, COTS supports Electrical: –Sensors: LM34 temperature sensors on autoclave, reagent water chamber, and ambient PP-0079 thermistors on reaction chamber Additional thermistors placed on reaction chambers Software: –Laptop hard drive for data storage Manufacturing: –BioServe manufacturing parts of autoclave bodies (milling), reaction chamber bodies, and mixers

5 Changes Since CDR Mixer Electrical System Rectangular Mixing Blades Flat Scoop Four Controlled Items

6 Test Plan Flow Chart Power Supply Circuit Switch Board Circuit Peristaltic Pump Control Circuit Autoclave Heater Mixer Control Circuit TEC Control Circuit Integrated Electrical Subsystem Software Input/Output Voltage Integrated System Verification Autoclave Temp/Pressure Sample Transport Mixing Capability Reagent H 2 O Containment Rxn Chamber Environ. Control Autoclave Kill Test Sample Sterility Disassembly/ Reassembly Electrical Mechanical Biological Software Integrated

7 Special Test Requirements Hazard Analyses –Electrical: electrocution/fire –Autoclave: pressure vessel (projectiles), hot surfaces, sharp edges –Assembly/Disassembly: sharp edges –Environmental control: hot surfaces –Integrated System: all of above Testing Locations –BioServe Environmental Chamber –BioServe Wet Chemistry Lab

8 Schedule

9 Budget ExpectedActual Electronics$0$0 (donated) Sensors$0$0 (donated) Mechanical$1,328.53$1, Computer/DAQ$348.00$ Miscellaneous$150.00$ Total$1,826.53$2,843.62

10 Current Issues Tubing: –PharMed tubing does not come in 1” inner diameter Substitution has been found (Bioprene) but has not been ordered TEC Controller: –Power cord did not come with TEC controller Replacement can be fabricated or purchased Manufacturing: –Two weeks behind schedule Offset by manufacturing contributions from BioServe Ordering: –Pumps, thermostats, and TECs have not been ordered

11 Conclusions Manufacturing behind schedule –Offset by BioServe’s assistance Most parts are ordered –Tubing is only ordering concern –Can be offset by finding other distributors Still on budget –Over what was expected, but still under budget with most parts ordered Mechanical, software, and electrical packages approved Will be able to complete manufacturing and testing by deadlines