Changes in the Procurement Dynamic 1. Richard H. Shaban Toronto, ON June 4, 2013.

Slides:



Advertisements
Similar presentations
MASBO February Information to purchase Services Information to purchase Construction.
Advertisements

Construction Contracting
What Small and Emerging Contractors Need to Know Introduction to Construction Risks and Contracting Practices © Copyright 2014 NASBP.
Chapter 15 Closing the Bid. Objectives Upon completion of this chapter, you will be able to: –Describe the estimate summary process –Describe items that.
Determining Responsive Bids and Responsible Bidders and Offerors Presenter: J. Peter Stamps, CPPO, VCO VA Dept of General Services.
TENDERING J. Marc MacEwing Shapiro Hankinson & Knutson Law Corporation.
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
Tendering Procedures in Lagos State under the Public Procurement Law 2011 Presented By Engr. Akin Onimole | February 13, 2013 GM/CEO, Public Procurement.
Nabil dmaidi1 Miller Act H Enacted in 1935 H Federal Contracts over $25,000 H Contractor shall provide Bonds H Performance Bonds in the amount to protect.
1. A project delivery method describes the process of how a project will be designed and constructed. A project delivery method can be characterized in.
The Request for Proposals and the Platypus: what do they have in common? 1.
Identifying and Selecting Projects
Chapter 3 Project Initiation
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Marcy Mealy Procurement Specialist CDBG Program
Assurance, Attestation, and Internal Auditing Services
Update from the UNC General Education Council [presented to the UNC Board of Governors’ Educational Planning, Programs, and Policies Committee on February.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Undulator Long Lead Procurements Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
SURETY BONDS 101 The Basics of Bonding. Surety Bonds 4 A surety bond is an instrument under which one party guarantees to another that a third will perform.
Construction Contract Documents
Design, Implementation & Roll-out of e-Procurement May 2013 Kang-il Seo | Deputy Director, International Cooperation Division Public Procurement Service.
STRATEGIES FOR ONLINE LEARNING IN A GLOBAL NETWORK UNIVERSITY INTED 2013 Annette Smith, Kristopher Moore, Erica Osher Reifer New York University.
Legislation, Regulation, Guidelines
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Conditions and Peculiarities of Submission of Complaints in Ukraine. Typical Errors/Infringements Relating to Submission of Complaints Kyiv, April.
The Construction Specifications Institute Session 4 CONSTRUCTION DOCUMENTS Part 1 Project Delivery Education Program Construction Document Technology (CDT)
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RFP: RAF/ 2012 /00034 Date: 14 January 2013 Time: 11h00.
OPA Office Professionals Assist, LLP Contracts, Proposals and Estimating.
The Kay Jeweler Pavilion: Creating Value for Kids, Families and a Community Ohio House Healthcare Efficiencies Study Committee – September 16, 2015.
Welcome to the OCR Academy. Overview of Rules & Law Craig Weise Construction Reform Program Director.
United Nations Procurement Division
Governmental Procurement ISQA 440 Goals of Procurement Steps in the Procurement Cycle Specifications and Work Scopes 1.
Specification & Quantities Estimating
SacProNet An Overview of Project Management Techniques.
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2013 /00009 Date: 27 May 2013 Time: 11:00.
Massella Ducci Teri Italian approach to long-term digital preservation Policies for Digital Preservation ERPANET Training Seminar.
1 William Paterson University NJHEPA New Jersey Higher Education Purchasing Association Members: Kean University Monmouth University Montclair State University.
Report on the Challenges in the Planning and Procurement of Services for the Ceres and van Rhynsdorp Correctional Facilities Portfolio Committee on Correctional.
RFP for Public-Private Partnerships JULY 20th, 2015.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
Overview of Building Information Modeling What does it mean for Civil Engineering?
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
HOW TO DO BUSINESS WITH THE CITY OF ATLANTA Department of Procurement Presented by: Keith O. Brooks, CPPO.
STEVE OGLESBEE, DREW WALKER, ALAN WONG SAN FRANCISCO WAR MEMORIAL.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
Rules overview (1 hour presentation) User instructions This ppt deck is designed to provide a basic presentation for internal use in your organisation.
The Public Tendering and Bidding (招投标) Law of the People's Republic of China Effective since January 1, 2000.
NIGP: The Institute for Public Procurement Public Procurement’s Go-To Resource.
Contracting for Evaluation Products and Services by James B. Bell
STEVE OGLESBEE, DREW WALKER, ALAN WONG SAN FRANCISCO WAR MEMORIAL.
How to Write a Proposal.
DOING BUSINESS WITH ALBERTA INFRASTRUCTURE
What Small and Emerging Contractors Need to Know Understanding the Basics of Contract Surety Bonds © Copyright 2016 NASBP.
What Small and Emerging Contractors Need to Know Introduction to Project Delivery Methods © Copyright 2017 NASBP.
BIM & IPD This PPT is about Building Information Modeling (BIM) and
Tender Evaluation and Award Process
Light Rail Transit Project
Content of Tender Dossier Instructions to Tenderers
“Everyone can access”.
- Period before Tenders Submission –
Highways & Infrastructure Best Value Construction Procurement Presentation November, 2017.
Understanding Bonding Requirements
Use of the Professional Engineer’s Seal A PEO Practice Guideline
Canadian Auditing Standards (CAS)
HOME AFFAIRS IDENTIFICATION SYSTEM (hanis)
HMPPS Innovation Grant Programme (2020 – 2022)
Presentation transcript:

Changes in the Procurement Dynamic 1

Richard H. Shaban Toronto, ON June 4, 2013

Integrated Project Delivery “A project delivery approach that integrates people, systems, business structures and practices into a process that collaboratively harnesses the talents and insights of all participants to reduce waste and optimize efficiency through all phases of design, fabrication and construction.” – from the American Institute of Architects (AIA), Instructions for Document A295 3

History of IPD Emerged following 2007 publication of IPD contracts developed by California Council of AIA Shares similarities with the production concepts Just In Time and Total Quality Control (from Raisbeck et al., Assessing Integrated Project Delivery: A Comparative Analysis of IPD and Alliance Contracting Procurement Routes, 2010) 4

Contract Example: American Institute of Architects (AIA) Document A295 – General Conditions of the Contract for IPD Article 1.1 The Owner, Architect and Contractor have agreed to plan, design and construct the Project in a collaborative environment following the principles of IPD and to utilize Building Information Modeling to maximize the use of their knowledge, skills, and services for the benefit of the Project. 5

IPD = multi-party agreement - from American Institute of Architects, Integrated Project Delivery: A Guide 6 Owner Architect Contractor Contract

Features of IPD Owner, Architect and Contractor execute same contract Information openly shared Risk is shared and managed collectively Compensation is tied to project success Focus on use of technology (Building Information Modelling ) - From American Institute of Architects, Integrated Project Delivery: A Guide 7

Electronic Bonding RFP Requirements for ebid bond (from Canadian Surety Association, Mock Tender Program): 1. A bid bond may be submitted in an electronic or digital format if it meets the following criteria: 1.1. The version submitted by the Tenderer must be verifiable by the Owner with respect to the totality and wholeness of the bond form, including: the integrity of the content to demonstrate assurances the document received is the true document executed and the content has not been changed or altered; all digital signatures to demonstrate the identity of the parties that have duly executed the document; all digital seals to demonstrate the identity of the entity that applied a company seal; that the verification process is conducted with the Surety Company, or an approved verification service provider of the Surety Company to demonstrate acknowledgement of intent The version submitted must be viewable, printable, savable and storable in standard electronic file formats compatible with the Owner, and in a single file. Allowable formats include pdf The verification may be conducted by the Owner immediately or at any time during the life of the bond and at the discretion of the Owner with no requirement for passwords or fees The results of the verification process must provide a clear, immediate and printable indication of pass or fail regarding Item Bonds failing the verification process will NOT be considered to be valid. 3. Bonds passing the verification process will be treated as original and authentic.

Extending Contract A/Contract B Analysis to RFQ’s Intellibox Concept Inc. v. Intermec Technologies Canada Ltd. (2011), 95 B.L.R. (4th) 124 (Ont. S.C.) Considerations: Irrevocability; Deadline for Completion; Security; Evaluation Criteria; Specifications; Language of the Document. 9

Clarity in Tender Documents HGC Management Inc. v. City of Brantford (unreported, March 21, 2013) Non-compliance of bid bond disqualifying bidder; Urgent application for determination; Agreed Statement of Facts; Form over substance; Careful examination of tender terms; Unfair to impose a technicality in the tendering documents which is not expressed; No restriction on use of a single Bid Bond containing separate bid securities. 10