EOS Aura Science Team Meeting

Slides:



Advertisements
Similar presentations
CLOSE APPROACH PREDICTION ANALYSIS OF THE EARTH SCIENCE CONSTELLATION WITH THE FENGYUN-1C DEBRIS Matthew Duncan - a.i. solutions, Inc. Colorado Springs,
Advertisements

CSPP/IMAPP Users' Group Meeting May 21-23, 2013
Debris Avoidance and the CCSDS Navigation Working Group Presentation to NSPO in Taiwan November 2013 Mike Kearney CCSDS Chair & General Secretary NASA.
Landsat Point of Contact USGS Bruce Quirk NGAC Kass Green NGAC Meeting, October 5, 2011.
Terra: Aging Spacecraft and Considerations of Maintaining Mean LocalTime vs. Maintaining Altitude and Allowing MLT to Drift K. Thome, T. Heyd, D. Mantziaras,
Orbital Operations – 2 Rendezvous & Proximity Operations
Earth System Science Teachers of the Deaf Workshop, August 2004 S.O.A.R. High Earth Observing Satellites.
OMI's Contributions to the Success of the NASA Aura Mission & U.S. Contribution to the Success of OMI Aura Project Science Office Anne Douglass, Joanna.
1 Winter Launch Block Modeling and Results MMS Flight Dynamics Team MIWG 8 Feb. 20, 2014.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 4.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
Satellite Orbits and Navigation 2
GOES-8 to GOES-12 Transition Direct Readout Conference Cindy Hampton NESDIS/Office of Satellite Operations.
Metr 415/715 Monday May Today’s Agenda 1.Basics of LIDAR - Ground based LIDAR (pointing up) - Air borne LIDAR (pointing down) - Space borne LIDAR.
NASA, CGMS-40, November 2012 Coordination Group for Meteorological Satellites - CGMS Status report on the current and future satellite systems by NASA.
1 Expanded Capabilities In the A-Train Constellation of Earth Observing Satellites Angelita (Angie) C. Kelly Constellation Team Manager NASA Goddard Space.
NASA’s Earth Science Division Flight Overview Bradley D. Doorn Program Manager Earth Science Division, Science Mission Directorate PECORA 18.
NASA’s Goddard Space Flight Center LRO Operations Concept Richard Saylor Jr. HTSI/Code 444 August 16-17, 2005.
20a - 1 NASA’s Goddard Space Flight Center Attitude Control System (ACS) Eric Holmes, Code 591 Joe Garrick, Code 595 Jim Simpson, Code 596 NASA/GSFC August.
ESMO 1 Constellation Operations Lessons Learned For Future Exploration Angelita C. Kelly / NASA Goddard Space Flight Center Warren F. Case / SGT, Inc.
Van Allen Probes Spacecraft Operations July 29, 2015 Kristin Fretz
NASA, CGMS-41, July 2013 Coordination Group for Meteorological Satellites - CGMS Status report on the current and future satellite systems by NASA Presented.
AIAA RM Second ATS at UCCS Polar-Orbiting, Passive, Atmospheric Calibration Spheres (POPACS) Presented by R. Gilbert Moore Director, Project.
1 Presented by Patrick Coronado ( Information provided by NASA/GSFC: Angie Kelly, Bill Guit, and Eric Moyer) Earth Observing System (EOS) Mission Status.
AURA MOWG EMOS & IST Re-Engineering 2 October 2007 Pat Johnson.
Space Transportation Operations Working Group (STOWG) Report to COMSTAC October 7, 2010 Debra Facktor Lepore Acting Chair.
Chapter 5 Satellite orbits Remote Sensing of Ocean Color Instructor: Dr. Cheng-Chien LiuCheng-Chien Liu Department of Earth Science National Cheng-Kung.
Space Science MO&DA Programs - October Page 1 SS Evidence for Mass Fractionation in the Isotopic Composition of Solar Energetic Particles Although.
Diane E. Wickland NPP Program Scientist NPP Science: HQ Perspective on VIIRS May 18, 2011.
GIST th -16 th Dec B.Stewart RAL Mirror Anomaly Review Board Update.
March 2004 At A Glance autoProducts is an automated flight dynamics product generation system. It provides a mission flight operations team with the capability.
Issue/Revision: 1.0 Reference: Status: For information Only ESA UNCLASSIFIED - For Official Use Solar Orbiter: Launch Options Favouring Data.
DEX Publication Project OASIS PLCS Telecon 27 November 2007 Trine Hansen.
1 Earth Science Technology Office The Earth Science (ES) Vision: An intelligent Web of Sensors IGARSS 2002 Paper 02_06_08:20 Eduardo Torres-Martinez –
GIST-24 Meeting December MSG PROGRAMME STATUS Presentation to the GIST-24 meeting.
1 Weekly Summary Weekly Summary Formation Flight AEM4332 Spring Semester March 7,2007 Masao SHIMADA.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
THEMIS FDMO Review Propellant Budget Update − 1 October 5, 2004 PROPELLANT BUDGET UPDATE Vassilis Angelopoulos Covered in this presentation: Allocations.
Van Allen Extended Mission Orbit Analysis 9/2014 SWG T. Sotirelis, F. Siddique JHU/APL.
03/6/121 Using the VLBA for Spacecraft Navigation Jonathan Romney National Radio Astronomy Observatory VLBA 10 th Anniversary 2003 June 9 – 12.
Tracing the JWST Proposal from User Interface to Commanding of an Instrument Margaret Meixner & WIT Balzano, Robinson & CMD.
Spaceweather Working Group Spaceweather Working Group Earth Science Mission Operations Eric Moyer ESMO Deputy Project Manager - Technical
1 EOS Aqua Mission Status at AMSR Science Team Meeting September 16, 2015 Huntsville, Alabama Bill Guit Aqua/Aura Mission Director - Code 584 phone
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 24 October 2007.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
Orbital Analysis for Inter-Calibration Dave Mac Donnell Brooke Anderson Bruce Wielicki Don Garber NASA Langley Research Center Solar Workshop January 30,
GIST-21 Meeting 31 March-02 April MSG PROGRAMME STATUS Presentation to the GIST-21 meeting.
NASA's Aura satellite launched July, 15, 2004 from Vandenberg Air Force Base, Calif Orbit: Polar: 705 km, sun-synchronous, 98' inclination, ascending.
GIST Meeting 5 February MSG-1 - PROGRAMME STATUS Presentation to the GERB GIST/PSG meeting.
ESPC CIP Update November 7, COPC Action Item  NESDIS is currently in the process of reviewing and planning upgrades for the critical infrastructure.
Aura Data System Working Group Meeting Fall 2007 Aura Microwave Limb Sounder David T. Cuddy Jet Propulsion Laboratory California Institute of Technology.
March 2004 At A Glance The AutoFDS provides a web- based interface to acquire, generate, and distribute products, using the GMSEC Reference Architecture.
DSN CCSDS SLE SM Prototype Plan Erik Barkley December 2006.
1 J. Ranson NASA’s Earth Observing System Terra Mission Update Jon Ranson, Terra Project Scientist Si-Chee Tsay, Terra Deputy Project Scientist NASA’s.
ACE Science Workshop March 10 th, 2009 Armin T. Ellis, Deborah Vane, Mark Rokey Jet Propulsion Laboratory.
EMCS Facility Status Thomas Niedermaier. This document is the property of Astrium. It shall not be communicated to third parties without prior written.
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
NASA, CGMS-44, 7 June 2016 Coordination Group for Meteorological Satellites - CGMS SURFACE PRESSURE MEASUREMENTS FROM THE ORBITING CARBON OBSERVATORY-2.
1 There are currently 5 satellites in the “A-Train”: Aqua, CloudSat, CALIPSO, PARASOL, and Aura. OCO and Glory missions will launch in January and June.
A-Train Status AMSR-E Science Team Meeting
Some Programmatic Comments
Maxim Pathfinder Prework 16 August 1999
Technical Resource Allocations
MODIS SST Processing and Support for GHRSST at OBPG
SDO Flight Dynamics Subsystem
Launch and On-orbit Checkout
Using STK for Engineering Technology Education By Andrew G. Bell
EagleSat 2 – Mission and Development Overview
Afternoon Constellation
The Deorbiting of GOCE – A Spacecraft Operations Perspective
Presentation transcript:

EOS Aura Science Team Meeting Report from the Mission Operations Working Group (MOWG) Meeting October 28, 2008 Angie Kelly EOS Science Interface Manager Constellation Team Manager NASA Goddard Space Flight Center Greenbelt, Md. 20771

EOS AURA Mission Operations Working Group Meeting AGENDA EOS AURA Mission Operations Working Group Meeting 12:30 Greetings/Introduction/Agenda Review All 12:40 EOS Update A. Kelly 1:00 Aura Status B. Guit 1:20 HIRDLS C. Hepplewhite, J. Barnett 1:40 MLS D. Miller/D. Cuddy 2:00 OMIS J. Claas 2:20 OMI DB in Sodankyla O. Aulamo 2:40 TES R. Murdock 3:00 BREAK (15 minutes) 3:15 FD Report: Aura Relocation, Debris Avoidance, Inclination Maneuvers, etc. J. Levi 3:35 EDOS Status T. Wood 3:55 Ground System Re-engineering Plans & Schedule P. Johnson 4:15 Introduction: FOT Hot Topics (see Operations Splinter Sessions below) D. Mantziaras 4:30 Summary/Actions/Next Steps 4:45 -7:00 FOT Hot Topics Splinter Session (2.25 hours) FOT and IOTs

MOWG Meeting Attendees Columbia, Maryland October 2008 GSFC

Aura Mission Operations Status Topics Major Activities & Events Since Oct 2007 Aura Relocation Spacecraft Subsystems Summary Anomalies Planned Activities Propellant Usage & Lifetime Estimates Overall Summary Additional Information Aura Mission Operations Status

Major Activities/Events (Since last Science Team Meeting on 10/02/07) • Aura Relocation- completed May 2008 • 06/26/08: Debris Avoidance Maneuver 07/15/08: 4-Year Anniversary 08/15/08: HQ Mission Status Review Continuing Upgrade of the Ground System Replacement and upgrade of hardware and software in the Mission Operations Center due to aging hardware/software and new security requirements EOS Data Capture and Level Zero Processing (EDOS) Upgrade: enhanced capability to support future missions, e.g., data capture up to 500 Mbps (Dec 2008) Aura Mission Operations Status

Aura Relocation In the Afternoon Constellation (A-Train) CALIPSO There are currently 5 satellites in the “A-Train”: Aqua, CloudSat, CALIPSO, PARASOL, and Aura. OCO and Glory missions will launch in January and June 2009, respectively Mission MLT Aqua 01:37:24 CloudSat 01:46:13 CALIPSO 01:46:24 PARASOL 01:36:22 Aura 01:46:00 CloudSat As of October 22, 2008 GSFC

Aura Rephasing (1 of 2) At the request of the Aura Project Scientist, Aura was moved from its current location (15 minutes behind Aqua) to ~ 8 minutes behind Aqua—completed on May 8, 2008 Aura is now on a different ground track than Aqua (+18 kilometer (East) offset of Aqua’s WRS-2 path) to enable MLS/CloudSat viewing goal Aura FOT is maintaining the Control Box to ±10 km (±20 km requirement) A-Train Control Box Configuration GSFC 7

Aura MLS now sees the same air mass as CloudSat and CALIPSO Aura Rephasing (2 of 2) Aura MLS now sees the same air mass as CloudSat and CALIPSO Ground track (WRS Paths) Equator CloudSat ground track Orbit Plane MLTAN – 13:35 13:44 Aqua PARASOL MLS AIRS +/- 825 km MODIS +/- 1150 km OMI +/- 1300 km N MLS Limb track Aura CloudSat CALIPSO 8 min 7 min ~7 min 10 sec GSFC 8

Spacecraft Subsystems Status COMMENTS Command & Data Handling (CDH) Solid State Recorder (SSR) holds 3 orbits of data Nominal SSR Formatter Multiplexer Unit (FMU) Anomaly (Dec 4, 2007) Communications (COMM) Electrical Power System (EPS) Solar Panel Connector Anomaly (Jan 12, 2005) Flight Software (FSW) Guidance, Navigation & Control (GN&C) Propulsion (PROP) Dual Thruster Module (DTM-3) Anomaly (Aug 16, 2005) Thermal Control System (TCS) All subsystems are configured to primary hardware. Aura Mission Operations Status

Anomalies Since October 2007 • 12/4/07: Solid State Recorder Anomaly -- Intensive investigation and contingency planning (Jan- March 2008) 03/17/08: HIRDLS Chopper Shutdown Ongoing recovery activities 05/11/08: OMI Row Anomaly #2 05/29/08: MLS THz Module SIF5 Electronics Anomaly 06/01 – 06/04/08: MLS Filter Band 07 Anomaly 06/09 – 6/12/08: TES to Safe Mode – ICS Only 10/01/08: JPL reported rapid decline in MLS Band 32 Channels 3 & 4 10/13/08: JPL reported Band 32 Channels 3 & 4 have recovered to 96% of their original values and are acceptable for normal science data processing Aura Mission Operations Status

Aura Mission Operations Status Planned Activities 12/11/08: Drag Make Up Maneuver #16 2009 Inclination Adjust Maneuvers (IAMs) 9-burn sequence over 8-weeks March 11th, 17th & 19th April 1st, 7th , 9th , 22nd , 28th & 30th May 5th , 6th & 7th (Back-Up Dates) -0.0957 degree delta-I; 12.794 m/s delta-V 21.0 Kg Dec 31, 2008: Leap Second 2009 Senior Review (Mission Ops Input) How long can the mission last? OCO (1/15/09) and Glory(6/15/09) Launches Aura Mission Operations Status

Aura Mission Operations Status Aqua/Aura Inclination Adjust Maneuvers (DRAFT Schedule for March – May 2009) Sun Mon Tue Wed Thu Fri Sat 8 March 9 10 Aqua IAM #16 11 Aura IAM #13 12 Aqua IAM #17 13 14 15 16 17 Aura IAM #14 18 Aqua IAM #18 19 Aura IAM #15 20 EQUINOX 21 22 23 24 Contingency 25 Contingency 26 Contingency 27 28 29 30 31 Aqua IAM #19 1 April Aura IAM #16 2 Aqua IAM #20 OPTIMUM DATE 3 4 5 6 7 Aura IAM #17 8 Aqua IAM #21 9 Aura IAM #18 10 11 12 14 Contingency 15 Contingency 16 Contingency 17 18 19 20 21 Aqua IAM #22 22 Aura IAM #19 23 Aqua IAM #23 24 25 26 28 Aura IAM #20 29 Aqua IAM #24 30 Aura IAM #21 1 May 2 5 Back Up IAM 6 Back Up IAM 7 Back Up IAM 8 Aura Mission Operations Status

Aura Mission Operations Status Maneuver Locations Aura Mission Operations Status

Aura Fuel Usage: (Actual & Predicted) Fall 2004 Delta-i Maneuvers Annual Delta-i Maneuvers Fall 2006 Delta-i Maneuvers Spring 2009 Delta-i Maneuvers Spring 2007 Delta-i Maneuvers Aura Mission Operations Status

MOWG Focus GOAL: Continued operation of the spacecraft and instruments as they age Understanding the current state of the instruments regarding any changes that may affect performance or data products How to adjust operations in order to prolong instrument life and science mission Understanding what are the various conditions that can cause an instrument to go to an “undesirable” state and implementing procedures to avoid them Mutual understanding/detailed procedures between the FOT and IOT on how to deal with critical situations, i.e., red flags Projected lifetime of the instrument based on current state

Aura Mission Operations Status Summary Spacecraft Status - GREEN Instrument Status - GREEN HIRDLS: Reduced Aperture; chopper recovery in progress Chopper began exhibiting anomalous behavior in November 2006 Chopper Stalled March 17, 2008 (unable to re-start to date) 9/10/08: Initiated auto re-start Macro ~ 288 restart attempts/day MLS: Operating Normally Band 13 measurements suspended February 2006 THz Band 17 currently out of lock OMI: Operating Normally Two (2) Field-of-View Row Anomalies (September 2007 & May 2008) TES: Operating Normally August 2008: Modified Global Survey Observations to extend ICS lifetime Implemented new Lubrication Macro to extend ICS lifetime Data Capture/L0 Processing Status – GREEN SSR Data Capture to 09/30/2008: 99.9910 %* Ground Systems Continuing ground system upgrade and technology refresh Preparing for Senior Review in 2009 (First time) Aura Mission Operations Status

Thank you! Questions? GSFC

Aura Mission Operations Status Additional Charts - Aura Mission Operations Status

Aura’s Neighborhood (705 km Orbit) GSFC

Earth Science Morning Constellation SAC-C is staying 2 km above Landsat-7 & Terra EO-1 is currently 15 km below Landsat-7 & Terra Operating on a 2-year extension through 2009 Has enough propellant to last through 2011 • Terra and LandSat-7 are continuinng operations at 705 km. Mission MLT Terra 10:30:03 EO-1 09:59:56 Landsat-7 10:01:03 SAC-C 08:14:41 Original Morning Constellation configuration As of October 22, 2008 GSFC

Orbital Debris Avoidance GSFC

Debris Avoidance A number of missions are in a 705 km sun-synchronous polar orbit. 55 other objects reside in orbits with mean altitudes of 705 +/- 5 km, including, A-Train missions, Terra, EO-1, Landsat-5 and -7, and six Iridium satellites. More than 1500 cataloged objects pass through this regime each day. On average, one object comes close Within 5 km of each constellation mission each day Within 2 km of each constellation mission once or twice a week. ESMO has a task with the DOD’s Joint Space Operations Center (JSpOC) to screen all A-Train and Morning Constellation missions to ensure their safety.

Debris Avoidance Maneuvers During June 2007 – July 2008 Aura performed a 2-second burn on June 26, 2008 to avoid a piece of well-tracked debris from a U.S. satellite. CloudSat performed two small maneuvers on July 20 and 22, 2008 to avoid debris from a Delta I LV. PARASOL performed an early drag make-up maneuver on October 20, 2008 to avoid a space object. PARASOL is planning a possible avoidance maneuver on October 27 Terra is evaluating a debris avoidance maneuver this week

Aura Mission Operations Status Spacecraft Anomalies Command & Data Handling (C&DH) Subsystem Formatter Multiplexer Unit/Solid State Recorder (FMU/SSR) Anomaly Started December 4, 2007: Entered “quiet period” two-weeks later (12/18/07) Occasional packet errors are still observed at pre-anomaly levels No interruption to spacecraft or instrument operations ESMO Anomaly Resolution Team Formed NGST, AETD, FOT, MD GSFC/AETD/NGST Anomaly Review Board Final Report Most Likely Cause: Single Event Functional Interrupt (SEFI) Continue to operate as is unless anomaly returns FOT prepared to perform FMU/SSR Reset Procedures and/or C&DH Swap Procedures if necessary No impact to operations or 6-year life expectancy Aura Mission Operations Status

Updated Lifetime Estimate (September 2008) Long-term orbit simulations were run for Aqua and Aura through 2017 Used mean nominal Schatten solar flux predictions Estimated the frequency of drag make-up maneuvers to maintain Aqua’s WRS-2 ground track requirements Estimated the required number of annual inclination maneuvers for Aqua and Aura to satisfy the OMI beta angle request and maintain Aqua’s mean local time (MLT) requirement Did not include potential debris avoidance maneuvers Lifetime predictions for Aqua and Aura show that both spacecraft will have sufficient fuel to maintain their current orbits within the Afternoon Constellation through 2016 and possibly well beyond Further analyses will be performed by ESMO FD Team Aura Mission Operations Status

Debris Assessment Software The Debris Assessment Software (DAS) was created by the Orbital Debris Office in Johnson Space Center and is the Agency standard for end of mission life analyses and lifetime estimations DAS requires several inputs from a user describing a spacecraft’s mission: The operational orbit parameters The mission launch date Length of a mission’s lifetime In turn, DAS outputs: Whether this mission is compliant with NASA requirements for limiting orbital debris A recommended apogee and perigee that will allow the spacecraft to reenter within a specific period and satisfy NASA requirements Aqua and Aura will have enough fuel onboard to safely exit the constellation and deorbit to the DAS recommended apogees and perigees Aura Mission Operations Status

Aura DAS Lifetime Estimate (September 2008) Aura Mission Operations Status

Schatten & DAS 2.0.1 Solar Flux Predictions – Nominal Timing Aura Mission Operations Status

Data Capture

Aura Mission Operations Status Data Capture SSR Data Capture to 09/30/2008: 99.9910 %* SSR Anomaly EDOS Ops Error Norway Comm Outages Aura Mission Operations Status