1 Liverpool Production Status Week of 02 March 2007.

Slides:



Advertisements
Similar presentations
HCAL Front End Boards HCAL – Technical Meeting Status of the FE Boards Parameter Shift Register Time Schedule Test Setup Mathias Reinecke.
Advertisements

LHCb VELO Production Visit November 9 th 2005 Introduction to staff Status Schedule.
23-Aug-2005 VELO Production UCD VELO Module Production at Liverpool T. Bowcock.
VELO Status at Liverpool T. Bowcock. Prototype Module(1) Mechanical Design Several different options Reduce complexity Dead reckoning.
1 Liverpool Production Status Week of 23 February 2007.
LHCb Velo Construction Authorisation steps Tony Smith.
VELO Module Mid-Term Review T. Bowcock 11 October, 2006.
Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
1 Liverpool Production Status Week of 9 February 2007.
Source Driver Status CMS Week November 2007 P. Debbins University of Iowa.
Silicon Detector and Micromodule Production: Present Status.
CMS Week March presented by John Coughlan RAL FED Hardware Status Pre-Series Manufacture Final Production Plans.
Present Assembly Status Three important milestones completed: – We tried the entire assembly procedure on real modules and it worked – The construction.
Year 10 ISA Controlled assessment Week starting March 4 th 2013.
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
19 Sept 2005Flavio Dal Corso INFN-Pd1 MiniCrates Status Components Status (BTIM, TRB, CCB, SB) MC production: quantity and rate, past and future Production.
ATLAS Module building at Glasgow
Star Week 6-10 Frb 2002SSD Status Report 1# SSD Status Report Main components Production status Last news: first ladder Schedule SSD pages:
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
Uli Schäfer 1 Production modules Status Plans JEM: Status and plans.
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
UF-PNPI HV system upgrade Presented by N. Bondar. CERN  Part 1. HV System migration to USB interface  Part 2. HV System proposal of Stage 2.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
RWA, 8/12/2006 Present Preliminary Production Plan All still preliminary, as we are re-establishing production. January 9 th,2007: –Delivery of 2 ring.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
PMG, June 15, 2000 Slide 1 Schedule Started ! Done Late Done Done(today)
The Inclusive (Measurement ) FVTX aka iFVTX sponsored by LANL-DR in FY ‘06-08 FPIX Chip Module/Hybrid Testcard Pixel Plane Assembly/Integration.
06/02/02CERN - LARG meeting1 CALIBRATION BOARD STATUS  Status of the DMILL chips used on the calib. boards  Low Offset Op Amps: Offset measurements 
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
03/07/2000Status at TRIUMF1 Module Production Status Production Changes Material Production Status Status of Module Shipping Frame QC Status.
Status of NA62 straw electronics Webs Covers Services Readout.
AFE IIt Project Status. Current Status  AFE II Prototype Testing Complete u Detailed ch by ch testing has been done s 3071 good channels out of 3072.
PFP Instrument Status All PFP Instruments Except SWEA have been delivered, integrated, and tested; supporting environmental tests Issues: –EUV alignment.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 14/10/15.
Strasbourg status Ring 7 pilot run François Didierjean.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
MTest Pixel Telescope – Status Update David Christian January 8, 2008.
ALICE SSD 20 May Yalta G-J Nooren ALICE SSD status.
EMCal Meeting Nantes – July J-F Muraz  Grenoble Status  Assembly and test Hall.
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with.
Assembly and Test of the Spectrometer (H.P. Apr. 16,1998) Status Module Assembly and Tests 1.) Status of completed hybrids and module 2.) Summary of the.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
July 20, 2007Anita Topkar, BARC PSD Production: Present Status Dr Anita Topkar BARC.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Cathode Production Status Muon Week April10th 2003 A. Benvenuti INFN Bologna.
CMS Tracker Week, CERN, April Apr 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
N. Dixon PH / DT Vladimir Elsha JINR Straw working group meeting Monday 6th April 2011 CERN1 Straw Material and development.
VELO Replacement Girish Patel University of Liverpool.
PIXEL CAEN Installation Status
T. Bowcock University of Liverpool
SCHEDULE Nov 1st - Assembly Table Complete
Status Brussels GANTRY
TEC Module Production Overview
GAUSS Work plan Software Week 6 March 2002 F.Ranjard / CERN.
CMS Perugia Gantry Status Report
Encapsulation Studies
Module Testing Status Week of 6/14-6/20.
Hybrid & Module Testing Status
FNAL Bonding Since our last report we have built and bonded an additional 10 TOB 4-chip modules 3 RMT pitch adapters 7 Planar pitch adapters By adjusting.
Presentation transcript:

1 Liverpool Production Status Week of 02 March 2007

02 March 2006VELO Weekly Meeting2 Production Status Completion of Installed Modules Mid-term Review X-mas

02 March 2006VELO Weekly Meeting3 Production Status (2) PA/Chip Gluing Beetle Bonding Sensors Full Modules

02 March 2006VELO Weekly Meeting4 This Week 2 modules delivered this week Now 1 spare R and phi at CERN 1 week behind schedule in steps 1 week behind schedule in module delivery H138 rejected due to large p-stop problem over ~250 channels Thus any additional needed spares have to come from parts started this week PA/chip gluing processing well 2 back-end bonded Friday 2 more ready for back-end bonding Monday Best estimate now for next module with sensors attached/bonded/tested is March 9 th Still estimate 4 days to take module from this state to shipping to CERN