LHCb Pedestal Assembly Peter Cooke. Peter Cooke 28 Feb - 1 March 2006 - VELO PRR2 LHCb Pedestal Assembly Feet to Base Assembly Paddle Preparation Assembly.

Slides:



Advertisements
Similar presentations
Thule Smart RV™ Pod Kit Installation For Smooth-Sided Fiberglass RVs
Advertisements

LHCb VELO Production Visit November 9 th 2005 Introduction to staff Status Schedule.
Module Metrology Peter Sutcliffe. Peter Sutcliffe – Module Metrology Wenzel CMM Module Metrology carried out on Wenzel CMM with module jig aligned along.
Woodwork Joints 2.
Manufacturing Processes lab I Running a lathe machine
Drafting Technology Threaded Fasteners.
เทคโนโลยีการสร้างอุปกรณ์จับยึด
Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
Jigs and Fixtures 3june , 2010 By: Abid Ali Abid.
WOOD JOINTS Items to consider when choosing a wood joint.
Collaboration Meeting, Oct : Start Counter Start Counter Eric Pooser W. U. Boeglin L. Guo P. Khetarpal Experimental Setup SiPM Scan Attenuation Lengths.
Fixturing operations for PXL 1 models: MSC.SLDASM MSC_fixtured.SLDASM rail_test_system.SLDASM 2/24/2010.
Inside-, Depth-, and Height-Measuring Instruments
Flexible Manufacturing Working with Machines Copyright © Texas Education Agency, All rights reserved.
ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
Chapter 27: Workholding Devices for Machine Tools
Making Coverslips by Steve Smith, Cheng-Zhong Zhang and Amy Xu.
TEAM 4 Assembly of a Simple Clamping System Under a Virtual Environment.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Jigs and Fixtures.
A.V.C.COLLEGE OF ENGINEERING
Bachelor of Technology Mechanical
Team Leader : Mr. Khaleel Ahmed Members : Mr. Radhakrishnan V K Mr. Sugmar V Mr. Sourabh Kr. Mishra PROJECT MEMBERS.
DESIGN AND FABRICATION OF TURNING FIXTURE FOR ELBOW
Lesson No. 11 Week No. 07 Name of lesson Marking Tools
MECH152-L27(1.0) - 1 Design for Manufacture Manufacturing Processes Review.
Mickael Frotin– 07/06/2009 Demonstrator - Assembly ECAL meeting - London.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
Types of Threaded Fasteners.  Used to hold parts together  Clearance holes in parts  Nut on other end  Can also be used with a threaded hole.
NSQP MEETING Valery AKHNAZAROV January 20th 2011 ISP PP0 Board Bonding Procedure Type 1 Type 3 Type 4peek Type 4 Assembly Name: ISP ASM Parts.
Substrate-Paddle-Base Peter Cooke. Peter Cooke 28 Feb - 1 March VELO PRR2 Substrate- Paddle-Base Substrate Production Paddle – Base – Feet Component.
Stave Core QC Peter Sutcliffe RAL 24 th Sept 2014.
GHP 2014 Avery Andrews Archish Chaturvedi Nandan Dave.
A.Ostaptchouk AMS Meeting at CERN, 16 July Measurements of Octagon Walls with 3D CMM Characteristics of 3D CMM Measurement program Results of insert.
BMFS 3373 CNC TECHNOLOGY Lecture 3. Lecture Objectives At the end of the lecture, you will be able to:  Understand the engineering drawing terms and.
TYPES OF MICROMETERS. Precision Measuring Tools Five categories of tools based on the dimension being measured – Outside – Inside – Depth – Thread – Height.
M. Gilchriese Disk Sector Production Pixel Local Supports Production Readiness Review.
SCT Barrel 6 Support Bearing A full-scale model of the barrel 6 support bearing has been machined at UCL (drawing G.Barbier ) It was tried out on both.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Metrology of the Stave250 Assembly Jig (Tim). What do we need to measure?
Introduction Lathe is a machine, which removes the metal from a piece of work to the required shape &size The basic lathe that was designed to cut cylindrical.
IPC Standard Surface Mount Requirements Automatic assembly considerations for surface mounted components are driven by pick-and- place machines.
ENM208 INTRODUCTION to MACHINING ANADOLU UNİVERSITY Industrial Engineering Department.
Micrometers Unit 9.
VIEW SERIES with Sliding Door
P. Sutcliffe Liverpool University
Annex 4 - Moving Frame and Whiffletree assembly
Fixture.
Inspection of stock materials for defects
Production Planning – Designing Tooling
Transfer Molding to Facilitate Repairs
Canta Open Canal Manufacturing Procedure
Ladder Assembly All tools and jigs produced Glue dispensing works
THIRTY METER TELESCOPE : SSA
XFEL Cold mass & vacuum vessel non-conformities Detected At saclay
Machining Processes.
The Jig Borer and Jig Grinder
CHAPTER FIVE: Drilling Operation
Mounting a BalanceBox®650 to a brick wall
(Lecturer in Mechanical Deptt.)
Fastening devices.
AQA GCSE 2 Working with timber based materials and fixings
Grinding Edges Square & Parallel
AQA GCSE 3 Commercial manufacturing, treatments and finishes
Fastening Wood Turn to Unit 10 on page 117.
DucoSlide Luxframe F Fitting instructions L.H. R.H.
Fixtures, Jigs, and Check Gauges
Presentation transcript:

LHCb Pedestal Assembly Peter Cooke

Peter Cooke 28 Feb - 1 March VELO PRR2 LHCb Pedestal Assembly Feet to Base Assembly Paddle Preparation Assembly Machining Inspection Summary

Peter Cooke 28 Feb - 1 March VELO PRR3 LHCb Pedestal Assembly

Peter Cooke 28 Feb - 1 March VELO PRR4 Feet to Base Assembly Accurately machined fixture Locate Invar feet to dowel and slot Bond in the carbon fibre base (Araldite 2011) When set, machine paddle inner profile to form location spigot 5mm deep

Peter Cooke 28 Feb - 1 March VELO PRR5 Feet to Base Assembly Left clamp foot – located with precision dowel Right clamp foot – spigot / – mm located in precision machined slot / mm

Peter Cooke 28 Feb - 1 March VELO PRR6 Paddle Preparation Dress open end of paddle to fit drilling jig – spigot and length Drill holes Bond in M2.5mm inserts

Peter Cooke 28 Feb - 1 March VELO PRR7

8 Precision Assembly Fixture

Peter Cooke 28 Feb - 1 March VELO PRR9 Assembly Apply thin layer of Araldite 2011 to the machined spigot on base Fasten onto fixture Apply layer of adhesive to inside of paddle Offer paddle to base Hold in position with M2.5mm screws

Peter Cooke 28 Feb - 1 March VELO PRR10

Peter Cooke 28 Feb - 1 March VELO PRR11

Peter Cooke 28 Feb - 1 March VELO PRR12 Machining Hold in fixture Grind substrate mounting face to set distance from centreline

Peter Cooke 28 Feb - 1 March VELO PRR13 Inspection Visual inspection for defects Inspect substrate mounting face on CMM for flatness and position to centreline Re-inspect following grinding of mounting face Enter information in database

Peter Cooke 28 Feb - 1 March VELO PRR14

Peter Cooke 28 Feb - 1 March VELO PRR15 Summary Demonstrated techniques and accuracy by building five mechnicals Z dimension consistency Can produce one assembly per day (due to curing time)