ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT1 TPC Field Cage Progress Report Project Schedule Technical Progress & Prototyping Contractual Matters.

Slides:



Advertisements
Similar presentations
HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
Advertisements

Michael Hoch / EP-AIT1 TPC Resistor Rod. Michael Hoch / EP-AIT2 Resistor Chain: Design Constrains  current per resistor chain: 241  A = 25W (total =
Machine Tools And Devices For Special Technologies Plasma machining Slovak University of Technology Faculty of Material Science and Technology in Trnava.
ALICE TPC field cage status Sardinia May 2004 Michael Hoch Cern-TA2.
1 Potential Hardware Improvements, Related R&D Wieman RNC LBNL TPC Review Friday 6 October 2006.
LBNE 35 ton prototype Phase 1 summary Terry Tope Fermi National Accelerator Laboratory All Experimenters’ Meeting – Fermilab – May 19, 2014.
Aging, High Rate and Shielding L. Lopes Lip-Coimbra.
High voltage test system update Summary of 2005 results Results from March, May 2006 Possible remaining R&D projects Polished electrodes, clean(er) LHe.
DESIR Progress Report DESIR hall details defined for civil construction: - compressed air, liquid nitrogen, cooling water, etc detailed layout of RFQ-HRS.
Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
Rainer Renfordt IKF Frankfurt TPC meeting 10/11December GSI Low Voltage System for the Alice TPC " Test of Wiener PL500 supply " Alternative scenario:
1 Warm Magnets Work Package Status J. Bauche, TE-MSC Technical Meeting, 9th January 2014.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
ALICE-LHCC Review January 29-30, 2001 Thomas C. Meyer/EP-AIT1 General Layout Four separate vessels: –Outer containment vessel –Inner containment vessel.
Vacuum Fundamentals 1 atmosphere = 760 mm Hg = kPa 1 torr = 1 mm Hg vacuum range pressure range low 760 ~ 25 torr medium 25~ high ~ 10.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
TPC-Meeting : Københaven Ne-CO 2 Gas System : Status CO 2 - Gas System : Insulating Gap Resistor Rod : –Contacts –Cooling --> Liquid –Cooling -->
February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS.
TB Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
W. Morse PEDM Review1 E/B PEDM R&D W. Morse 12/7/2009.
Design and Technical Challenges of the ILC Small Angle Interaction Regions October 19 th, 2006J. Borburgh, CERN, AB/BT Electrostatic separator limits With.
1 Advanced Endplate - mechanics: Development of a Low-Material TPC Endplate for ILD Dan Peterson Laboratory for Elementary-Particle Physics, Cornell University.
EE planning meeting Lucie Linssen 1 CERN EE regional centre and Dee assembly plans Dee assembly TA3, not for EE Supercrystal regional centre.
Present status of TTF-cryomodules short overview Bernd Petersen DESY MKS March, 7, 2005 Main design features of TESLA-cryomodules Design changes for XFEL-cryomodule.
T.Schneider/LHCb Muon EDR
2-3rd. September 2002TPC Collaboration Meeting1 TPC INTEGRATION & SERVICES Mini Space Frame Back Frame Cooling Systems Cables Gas Systems Items Requiring.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
FLARE Constructing the detector First FLARE Workshop November 4-6, 2004 Rafael Silva Fermilab / PPD / MD Fermilab Liquid Argon Experiments.
ALICE TPC Status, Meeting with LHCC referees ALICE TPC – Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader:
TPC R&D status in Japan T. Isobe, H. Hamagaki, K. Ozawa, and M. Inuzuka Center for Nuclear Study, University of Tokyo Contents 1.Development of a prototype.
Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 1 Pre-installation and Functional Tests StartFinish  Certification of field cage…………………
Update on SBS Back Tracker UVa K. Gnanvo, N. Liyanage, V Nelyubin, K. Saenboonruang, Seth Saher, Nikolai Pillip (visiting from Univ. Tel Aviv, Israel)
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
We can…. 2 GLOBAL REFERENCES Rev: 00 References :
Summer Student Session, 11/08/2015 Sofia Ferreira Teixeira Summer Student at ATLAS-PH-ADE-MU COMSOL simulation of the Micromegas Detector.
An introduction to Energy aspects at CERN June 2014.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
CMS Upgrade Workshop, FNAL, Nov 19-21, O.Prokofiev CMS Upgrade Workshop Updated ME4/2 chamber construction costs and prototype Status and plans.
6 April 2006Malika Meddahi 1 CNGS Project: primary beam 1.Project Overview 2. Proton beam line overview and status 3. Target status 4. Commissioning preparation.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Concept Design for LBNF Far detector (LAr single phase)
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
 1) Introduction  2) GEANT simulations  3) NEW DESIGN : Technology and Assembly  4) Conclusions Reported by G.Feofilov, CBM meetings, Dubna.
Single-Phase ProtoDUNE Construction Planning Jim Stewart LBNC January 11, 2016.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
NSS2006Shengli Huang1 The Time of Flight Detector Upgrade at PHENIX Shengli Huang PHENIX Collaboration Outlines: 1.Physics motivations 2.Multi-gap Resistive.
Single Phase ProtoDUNE TPC QA/QC Plans The SP TPC Team Jan. 13, 2016.
Recent Changes to the FD TPC Design Bo Yu Oct. 20, 2015.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
Single Phase ProtoDUNE TPC CERN The SP TPC Team Jan. 13, 2016.
Phenolic glass based materials for the RPC electrodes RPC2016 Het Pand GENT R. Santonico INFN and University of Tor Vergata, Rome, Italy On behalf of the.
The LBNF cryostats Marzio Nessi, CERN 16 March 2017.
Dept. of Physics and Space Sciences, Florida Institute of Technology
Quality Control Chamber Production
Pre-installation and Functional Tests
Manufacturing of the first FCC-hh beam screen prototype for ANKA
First tests on the roll-formed field cage.
Requirements of the support mechanics
TPC Field Cage Progress Report
TPC Support and Constraint TPC Support
TPC Detector Control System
(On Behalf of CMS Muon Group)
Presentation transcript:

ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT1 TPC Field Cage Progress Report Project Schedule Technical Progress & Prototyping Contractual Matters

ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT2 Field Cage: Project Schedule

ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT3 Tests & Prototyping HV –High ionization behavior ( 83 Kr) Temperature stabilization –Resistor chain cooling Construction material –Compatibility and leaks Electrical network –“From strip to central electrode”

ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT4 High Voltage Stability History: –Field cage was exposed to >16 x expected average charged particle intensity in CERES beam (~ 6000/cm 2 s). –Field cage was operated at 1.78 x nominal drift field (~700 V/cm) in pure CO 2. Surface charge phenomena appearing at 60 kV (≥ 400 V/cm). –Insulation gap safe at ≥ 100 kV.

ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT5 High Intensity 83 Kr Test Inject 83 Kr with 300 MBq total intensity into field cage (May 2001) Separate tests for drift and insulation volume.

ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT6 Temperature Stability History: –Require:  T everywhere ≤ 0.1 ºC –Resistor rod produces 60 W waste heat. –Liquid cooling (H 2 O) proven very efficient with negligible gradient inside rod but…  H 2 O unsuitable at HV (dissociation),  Inert liquids dangerous in case of leaks. New approach: Gas cooling

ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT7 Resistor Rod: Gas Cooling Unlike liquid cooling,  T inside rod always > 0.1 ºC. –--> must insulate rod!  Foam for test  Double wall for ALICE. T [ºC] z [m] Ambient level 2.5

ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT8 Gas Cooling: Results Inside of rod achieve  t min of 7 ºC with 20 m 3 /h of air: T in = 16 ºC 7 ºC

ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT9 Gas Cooling: Results Outside of rod achieve required  T of ≤ 0.1 ºC within a few cm from rod: Numbers are given in units of 1/100 ºC; Blue numbers indicate zone around rod with  T < 0.1 ºC

ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT10 Material tests Drying  L/L [µm/m] T[ h] Macrolon Carbon Fiber Kevlar Fiber Glass Fiber Wet Leak test of full-size end plate sector with “CERES” gasket Humidity tests of FC material

ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT11 Voltage Divider: Central Electrode Focus on “stretched foil” version High modulus carbon-fiber frames NA48 Example

ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT12 Voltage Divider: Rods & Strips Ongoing prototyping of all rod types –Resistor rod –HV supply rod –Laser rod –Regular support rod Verification of strip tension and mounting scheme –Vertical or horizontal?

ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT13 ToolingTooling Modification of DELPHI support frame –Needed for construction & assembly of FC –Major handling tool for all operations –Finished by end of 2001

ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT14 Infrastructure: SXL2 Preparation of dedicated clean area for TPC assembly in LHC interaction region 2: –Finished by December 2001 Clean zone in hall SXL2

ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT15 Contracting: FC Cylinders First „Invitation to Tender“ (IT-2726) was launched on schedule in 2000, but... –all offers (4) were above funding level. Changed scope of tender: –Only production of individual parts (panels & flanges) –Procurement by and assembly at CERN New tender (IT-2999) sent April 2001 –6 months delay in schedule

ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT16 Contracting: End Plates First „Price Inquiry“ was made in –Lowest bid exceeded funding by large factor. Try to achieve savings by… –splitting production process (raw material, welding, machining), and –design changes. New tenders to be launched this month –only if expected savings materialize! Overall production delay ≥ 6 months.

ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT17 Contracts: Consequences for CERN Higher manpower load on CERN (TA2) Higher risks in terms of… –technical failure,  quality control, liability, warrenty! –schedule slippage, –capital loss. We expect to catch up on the baseline schedule during the internal assembly of the FC (2002/3).