1 Responsibilities & Planning DCS WS 13.06.05 L.Jirdén.

Slides:



Advertisements
Similar presentations
22. January 2007U. Frankenfeld1 TPC DCS Pre-commissioning Final system.
Advertisements

JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
1 DCS Cost DCS Workshop L.Jirden u Central DCS cost u Detector DCS cost.
PVSS and JCOP Framework Organization, Support & News Oliver Holme IT-CO.
The Detector Control System – FERO related issues
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
TPC Very High Voltage Control Status report Marco Boccioli 20/04/2006.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
1 Responsibilities & Cost ALICE DCS Review 14 Nov 05 For the DCS Team L.Jirden.
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
Marc R. StockmeierDCS, KIP ALICE WEEK FALL 2003 TRD DCS Status ● DCS-board status ● Poweresupply ●
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
LHC Gas Control System Stefan Haider EP-TA1-GS ALICE DCS workshop, S.Haider2 Outline Introduction and working philosophyIntroduction and working.
1 DCS TDR Key technical points & milestones TB 15 Dec 2003 L.Jirdén.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
1 ALICE Control System ready for LHC operation ICALEPCS 16 Oct 2007 L.Jirdén On behalf of the ALICE Controls Team CERN Geneva.
DCS workshop CERN, Mar 5, 2007 Kai Schweda 1 TRD Status Kai Schweda, University of Heidelberg B. Doenigus, J. de Cuveland, T. Dietel, D. Emschermann, M.
L.Jirden1 Update on Power Supplies DCS WS L.Jirden u Wiener u Caen u Global Support Contracts.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
June 14, 2005 Alice DCS workshop, Utrecht S.Popescu Guidelines and conventions for ALICE PVSSII control software Graphical User Interface Naming and Numbering.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
1 Status and Plans DCS workshop L.Jirdén u Budget u Status u Planning u Goals for end 2002.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
André Augustinus 10 October 2005 ALICE Detector Control Status Report A. Augustinus, P. Chochula, G. De Cataldo, L. Jirdén, S. Popescu the DCS team, ALICE.
André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén.
1 Cost of controls TB L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
20th September 2004ALICE DCS Meeting1 Overview FW News PVSS News PVSS Scaling Up News Front-end News Questions.
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
October 9th 2006ALICE WEEK - DCS WorkShop1 DEVICE USER SUPPORT OVERVIEW - Presentation - First Line Support - Reference System - Current Developpement.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
Peter Chochula for ALICE DCS, DCS review, Geneva April 3, 2006 ALICE DCS – Technical Challenges Peter Chochula For ALICE DCS.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
DCS Software Installation computing, network, software guidelines, procedures Peter Rosinsky, Peter Chochula, ACC team ALICE DCS Workshop, CERN, 5-6 March.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
DCS overview - L.Jirdén1 ALICE ECS/DCS – project overview strategy and status L.Jirden u Organization u DCS system overview u Implementation.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
13-Mar-061 ACORDE DCS ACORDE GROUP CINVESTAV, ICN-UNAM, MICHOACAN. PUEBLA México.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
1 DCS Status & Plans 22 June 2004 L.Jirdén. 2 URD Status DCS Detectors TOF SPDSDDSSD TPCTRDZDCPMDHMPITS PHO CPVCAL FMDV0T0 TRATRG MU ACCEMC HV LV FEE.
CONFIGURATION OF FERO IN ALICE Peter Chochula 7 th DCS Workshop, June 16, 2003.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
1 Planning DCS WS L.Jirdén. 2 TPC HMPID ACORDE FE PC Console DSS Disk SRV DB-SRV App GW sensors actuators DSS sensors actuators PC room SXL2.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
André Augustinus 16 June 2003 DCS Workshop Detector DCS status Overview and news.
MCH(Muon Tracking) DCS Introduction Overview drawing High Voltage - hardware functional diagram Logical Diagrams Summary table of states and commands Commands.
JCOP Framework and PVSS News ALICE DCS Workshop 14 th March, 2006 Piotr Golonka CERN IT/CO-BE Outline PVSS status Framework: Current status and future.
1 COSTING DCS WS L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
ALICE. 2 Experiment Size: 16 x 26 meters (some detectors >100m away from IP) Weight: 10,000 tons Detectors: 18 Magnets: 2 Dedicated to study of ultra.
ACO & AD0 DCS Status report Mario Iván Martínez. LS1 from DCS point of view Roughly halfway through LS1 now – DCS available through all LS1, as much as.
CMS – The Detector Control System
Alice TPC DCS.
TPC Detector Control System
Presentation transcript:

1 Responsibilities & Planning DCS WS L.Jirdén

2 Responsibilities u ACC (and its CERN partners) will provide u DCS H/W Infrastructure u Back-End System u Common Services u Interface to TRG, DAQ, HLT, LHC via ECS u S/W Infrastructure for Detector Applications u Detectors will provide u Detector Sub-System Devices and Cabling u Detector Specific Networking (Ethernet switches) u Detector Applications for each Sub-System u Detector Specific Services u Integration of all Detector Sub-Systems to a full Detector Control System u Interface to the Alice Detector Control System layer

3 ACC will provide: DCS H/W infrastructure u DCS Racks in CR3 u 1 for Back-end PC’s u 1 for ELMB power u 6 for Front-end (detector) PC’s u Network u DCS network ports in all racks with DCS computers & devices u detectors to specify requirements: “rack content meetings” u Computers u Back-end: prototype installation exists u Front-end: detectors to specify requirements: ACC will propose u PCI interfaces: detectors to specify requirements: ACC will propose u Peripherals u Printers, displays, etc

4 Firewall Terminal Server IP Reach for KVM Domain Controller DB Server (Config.) DB Server (Archive) File Server Network and Security FSM Alarms General DCS Electricity & Racks Gas & Cooling Environment General services LHC & Access Alignment Information Server CERN System Management DCS Operator DCS Status Safety Status ConsolesRemote AccessBackend Servers Worker Nodes Detector Front-end PC’s ACR Consoles DB Server (Archive) Infrastructure, network Racks, network, cabling KVM switches controlled power plugs Hot swap spare servers Disks & memories Spares DCS network DCS H/W infrastructure

5 [FED] Chambers ISEG PCI-CAN ISEG OPCserver PVSS II Chambers Wiener PCI-CAN Wiener OPCserver Ethernet User interface Database(s) RCU OPC client DIM client ? PVSS II Chambers, detector ELMB 1..18~400? PVSS II RS232 HVrod Heinzinger 1118? High Voltage Low VoltageFEETemp. MonitorVery High Voltage PVSS II OPC client PVSS II OPC client PCI-CAN ELMB OPCserver PVSS II OPC client TPC (1) CC HVLV EC HV S [FSM?] Control room (ACR) 108? 26/11/04 Eth. Switch ?? E E LV monitor DIMsrv DIMcl DDL PVSS II DIMclient HVrod ELMB ?1?2 VHV Curr. Monitor PCI-CAN ELMB OPCserver PVSS II OPC client C Front-End OPC client ACC WILL PROVIDE: SOFTWARE INFRASTRUCTURE FOR F-END’s WXP/Linux PCI OPCserver PVSS II FW LIBRARIES Detectors to specify requirements: ACC will propose

6 [FED] Chambers ISEG PCI-CAN ISEG OPCserver PVSS II Chambers Wiener PCI-CAN Wiener OPCserver Ethernet User interface Database(s) RCU OPC client DIM client ? PVSS II Chambers, detector ELMB 1..18~400? PVSS II RS232 HVrod Heinzinger 1118? High Voltage Low VoltageFEETemp. MonitorVery High Voltage PVSS II OPC client PVSS II OPC client PCI-CAN ELMB OPCserver PVSS II OPC client TPC (1) CC HVLV EC HV S [FSM?] Control room (ACR) 108? 26/11/04 Eth. Switch ?? E E LV monitor DIMsrv DIMcl DDL PVSS II DIMclient HVrod ELMB ?1?2 VHV Curr. Monitor PCI-CAN ELMB OPCserver PVSS II OPC client C DETECTORS will provide * SUB-SYSTEM DEVICES; HVPS, LVPS, etc * ELMB’s and ELMB + CAN power by ACC * CABLES; CAN and Interlock cables by ACC * SPECIFIC NETWORKING; switch to RCU, etc. * DETECTOR SPECIFIC SERVICES (GAS, COOLING)

7 PVSS CONNECTION: OPC, DIM, DIP FW CORE FRAMEWORK DEVICE COMPONENTS APPLICATIONS ALARM CONFIGURAT ACCESS ARCHIVAL TRENDING TOOLS JCOP ARCHIVAL PVSS CONFIG ALICE STANDARDS: - ALICE DCS State Diagrams (HV, LV, FEE, Detector DCS, ALICE DCS) - Guidelines & Conventions for ALICE PVSSII Control Software - ALICE DCS Computing Rules FEE CONFIG CONDITION ACC DETECTOR APPLICATIONS DETECTORS PVSS applications

8 ACC will provide * integration of services * interface to ECS sub-sys 1 device a Control Units Device Units To physical devices det B sub-sys 2 device b … … gas DCS ECS power det Edet D … … … racks sub-sys 1sub-sys 2 device e … Detectors will provide * Integration of subsystems * Interface to DCS

9 Installation schedule HMPID TOF / TRD PHOS TPC/ITS Vacuum FMD/V0/T0 RB26 Muon spectrometer FMD/V0/T0 RB24 PMD Stage2 Vacuum L3 doors Shielding Final Installation PHASE 1 PHASE 2 PHASE 3 PHASE 4 April 2007Jan 06Aug 06Mar 2007 TPC HMPID INFRASTRUCTURE Pre-Installation Nov 05

10 TPC pre-installation example July Nov June Feb Jan Aug TPC CHAMBER MOUNTTPC FEETPC COMMISSIONING DecMar Apr Sep Oct July May June GCS B-END DSS NETWORK RACKS TPC DCS INTEGRATION GOOFIE PULSER LASER ALICE DCS INTEGRATION ECS – DAQ INTEGRATION PC and PLC H/W RODC VHV FEE TMON LV HV

11 CR4 SX2SGSXL2 CR3 F-end comp TPC TPC GAS SYSTEM DSS HMPID B-end comp F-end comp DSS NETWORK MAY 05 Plans for 2005 OCT 05 F-END OCT 05 F-END JUL 05 DSS JUL 05 B-END JUL 05 DSS SEP 05 TPC GAS u TPC and HMPID Pre-installation at P2

12 PURCH REQ GUIDE TEST Final Installation Muon spectrometer FMD/V0/T0 RB24 PMD Stage2 Vacuum L3 doors Shield B-END F-END: HMPID TOF TRD PHOS MTG MTK F-END: TPC ITS FMD/V0/T0 PMD PHASE 1 PHASE 2 PHASE 3 PHASE 4 April 2007Jan 06Aug 06Mar 2007Jan 05 HMPID TOF / TRD PHOS TPC/ITS Vacuum FMD/V0/T0 RB26 INSTALLATION AND VALIDATION DETECTOR APPLICATIONS SOFTWARE Detector groups: Central Team: TOF TRD