November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.

Slides:



Advertisements
Similar presentations
Run8 – Coming sooner than we had thought Mike Leitch Run8 Coordinator November 7 th /7/20071MJL.
Advertisements

Commissioning the PHENIX RPC Forward Trigger Upgrade Michael Daugherity Abilene Christian University for the PHENIX Collaboration.
1 Run 9 PHENIX Goals and Performance John Haggerty Brookhaven National Laboratory June 4, 2009.
Performance of the PHENIX Muon Tracking System in Run-2 Ming X. Liu Los Alamos National Lab (for the PHENIX Collaboration) –Detector Commissioning –Detector.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Simulation issue Y. Akiba. Main goals stated in LOI Measurement of charm and beauty using DCA in barrel –c  e + X –D  K , K , etc –b  e + X –B 
Status of W analysis in PHENIX Central Arm Kensuke Okada (RBRC) For the PHENIX collaboration RHIC Spin Collaboration meeting November 21, /21/20091K.Okada.
The Progress of PHENIX RPC Production in China Shouyang HU Xiaomei LI Shouyang HU Xiaomei LI Science and Technology on Nuclear Data Laboratory China Institute.
Performance of PHENIX High Momentum Muon Trigger 1.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
Observation of W decay in 500GeV p+p collisions at RHIC Kensuke Okada for the PHENIX collaboration Lake Louise Winter Institute February 20, /20/20101.
6/6/ PHENIX WEEKLY PLANNING 6/6/2013 Don Lynch Note: No PHENIX planning meeting this week due to end of run party. Feel free to discuss safety and.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
NanoPHYS’12 – December 17-19, 2012 K. Nakano, S. Miyasaka, K. Nagai and S. Obata (Department of Physics, Tokyo Institute of Technology) Drift Chambers.
PHENIX WEEKLY PLANNING 4/10/2008 Don Lynch. 04/10/08 Shutdown ’08 Schedule Purge Flammable Gas, Magnet & DAQ TestsDone Remove lock-out & open shield wallDone.
STAR Collaboration Meeting, Nantes Alexandre A. P. Suaide Wayne State University Slide 1 EMC Commissioning for the run Review of last.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
Takao Sakaguchi, BNL Run-11 PHENIX Run Coordinator PHENIX Run-11 Report Sakaguchi, RHIC retreat 1 RHIC retreat version.
9/25/08J. Lajoie - Muon Trigger Upgrade Review1 Muon Trigger Upgrade LL1 Electronics Iowa State University John Lajoie Cesar Luiz daSilva Todd Kempel Andy.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
Introduction to High Momentum Trigger in PHENIX Muon Arms RIKEN/RBRC Itaru Nakagawa 中川格 1.
PHENIX Run8 Summary d+Au was fantastic! - x30 over Run3 baseline for future A+A new level of precision on intrinsic Cold Nuclear Matter physics now p+p.
October 3, 2008 John Haggerty 1 PHENIX Plan for Run 9 John Haggerty Brookhaven National Laboratory.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
1 G9a -FROST. 2 Experiments FROST New generation of CLAS photoproduction experiments with FROzen Spin Polarized Target (FROST) E02-112: γp→KY (K + Λ,
Time Meeting 3/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
PHENIX WEEKLY PLANNING 3/6/2008 Don Lynch. 3/6/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Oct 6, 2008Amaresh Datta (UMass) 1 Double-Longitudinal Spin Asymmetry in Non-identified Charged Hadron Production at pp Collision at √s = 62.4 GeV at Amaresh.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
PHENIX Measurement of Parity-Violating Single Spin Asymmetry in W Production in p+p Collisions at 500 GeV Stephen Pate (for the PHENIX Collaboration) New.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
Performance of PHENIX High Momentum Muon Trigger.
PHENIX WEEKLY PLANNING 1/10/2008 Don Lynch. 1/10/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
PERFORMANCE OF THE PHENIX SOUTH MUON ARM Kenneth F. Read Oak Ridge National Lab & University of Tennessee for the PHENIX Collaboration Quark Matter 2002.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
STAR pp Run Summary Carl Gagliardi March 11, 2008.
1/27/2016 R.Seidl: status of simulation1 W muon analysis in PHENIX Status of the background understanding, signal, smearing and asymmetries R.Seidl (RBRC)
1 PHENIX Status Ed O’Brien for John Haggerty Brookhaven National Laboratory June 23, 2009.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
10/27/2005J. Lajoie - PANIC '051 The PHENIX Forward Upgrade Topics: A (Brief) Spin Physics Motivation Antiquark Spin Contribution with W +/- bosons The.
PHENIX WEEKLY PLANNING 11/15/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going11/30.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
Performance of PHENIX High Momentum Muon Trigger.
Bill Christie For the STAR Collaboration January 5, Outline Detector configuration for Run 16 Data set Goals Desired luminosity profile for Run.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
PHENIX FUTURE PLANS & UPGRADES Stefan Bathe for PHENIX, Users’ Meeting 2009.
PHENIX WEEKLY PLANNING 1/31/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
MuTrig-FEE Install Status RIKEN/RBRC Itaru Nakagawa 1.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
Run11 MuTrig Performance RIKEN/RBRC Itaru Nakagawa 1.
5/30/20131 PHENIX WEEKLY PLANNING 5/30/2013 Don Lynch.
K. Barish UC Riverside 7 Oct Spin PHYSICS at PHENIX with a Central Arm Trigger Kenneth N. Barish For the PHENIX Collaboration UC Riverside DNP’2000,
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
Overview of the sea quark polarization measurements of PHENIX at RHIC DIS April 12, Rusty Towell Abilene Christian University on behalf of the PHENIX.
Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.
Study of polarized sea quark distributions in polarized pp collisions at sqrt(s)=500GeV with PHENIX Oct. 10, 2008 Tsutomu Mibe (KEK) for the PHENIX collaboration.
PHENIX Plan for Run13 Kieran Boyle RSC 01/11/20131.
RPC production and performance Chong Kim Korea university RHIC spin workshop, Seoul National Univ.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 2/14/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Muon Trigger Performance Run12 PP510GeV Sanghwa Park (SNU/RIKEN)
Commissioning and Calibration Strategies for Micromegas Vertex Tracker
Mickey Chiu University of Illinois at Urbana-Champaign
Presentation transcript:

November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory

November 18, 2008 John Haggerty 2 Run 9 assumptions PAC recommendation: 3. Longitudinally polarized proton-proton collisions at √s = 500 GeV for 5 weeks to allow beam development and commissioning by C-AD, a first measurement of W boson production in PHENIX, and background studies in STAR.

November 18, 2008 John Haggerty 3 Run 9 planning Run 9 planning is fairly far along Beam Use Proposal and PAC guidance Planning document (TN-427) 200 GeV pp October DC meeting parade of systems December physics/trigger/daq/analysis DC meeting Steve Pate agreed to serve as Spin Coordinator

November 18, 2008 John Haggerty 4 Physics goals at 500 GeV Measure backgrounds under high p T muons Test muon trigger electronics (currently being installed) Measure production cross sections  0,  to p T ~ 30 GeV, J/ ,  Measure A LL for  0,  With 25 pb -1 record W’s in central arm –~500 W + and ~90 W - –First look at A L and cross section

November 18, 2008 John Haggerty 5 Central arm W  Central arms W +  e + ~21 pb W -  e - ~3 pb Modify EMCAL gain Develop analysis Cross section measurement First look at A L

November 18, 2008 John Haggerty 6 Detector issues for 500 GeV running Magnetic field configuration –HBD needs “field free” bucked central field (“+-”) –But momentum resolution in central arms is compromised by reduced field –EC agreement to switch field to “++” after first week of physics running Gain changes in EMCAL (present dynamic range set to 20 GeV); mostly done with laser, should be close at beam startup

November 18, 2008 John Haggerty 7 Upgrade detectors in run 9 Upgrade detectors in Run 9 are partial installations or engineering runs: –HBD –Muon Trigger (MUTR FEE upgrade) –Muon RPC prototype –Absorber in muon arm First goal of upgrade detectors: do no harm

November 18, 2008 John Haggerty 8 HBD HBD.W installed HBD.E scheduled for installation December 16 Will need to gain operational experience with DAQ, HV, monitoring, calibration, analysis “+-” field configuration necessary for HBD operation

November 18, 2008 John Haggerty 9 Muon trigger upgrade Major installation effort under way… will complete North arm MuTr FEE upgrade in this shutdown 3 components MuTr electronics RPC layers Trigger logic RPC3 RPC1

November 18, 2008 John Haggerty 10 RPC prototype Resistive Plate Chambers –Fast response –Good spatial resolution –Low cost, CMS experience Installing prototype sector and electronics Engineering run

November 18, 2008 John Haggerty 11 Muon trigger board VME Interface P1 P0 P2 P3 12 x xcvr Virtex-5 LX110T 2.8Gbit) (MuTr 2.8Gbit) (MuTr 2.8Gbit) (MuTr 2.8Gbit) One board processes four trigger octants (one octant per tile) Testing of prototype late in the run Virtex-5 LX110T (9 fibers per octant) Virtex-5 LX110T Virtex-5 LX110T Virtex-5 LX110T 12 x xcvr 12 x xcvr 12 x xcvr

November 18, 2008 John Haggerty 12 Many other detector repairs/improvements Run 6 ERT turnon 8 kHz DAQ improvements to increase livetime, event rate EMCAL/RICH trigger efficiency improvements DC and PC repairs MUTR high voltage stability Could be some additional small tests/prototypes for upgrades

November 18, 2008 John Haggerty 13 Operational Efficiency Review of operational efficiency at S&T Review July 7-9, 2008 Short summary (from Run 8 d+Au): –50% in vertex cuts (no change expected) –77% uptime (modest improvements possible, but less with development) –89% livetime (slight improvement possible with higher rates)

November 18, 2008 John Haggerty 14 Final days schedule Need to complete MuTrig installation, remove scaffolding; install HBD, RPC prototype Expecting closing up the shield wall beginning of January, 2009 then safety and detector checkout

November 18, 2008 John Haggerty 15 RHIC/PHENIX interaction Magnetic field change “+-” to “++” shortly after physics run begins Tunnel access for RPC3 prototype during startup Optimizing the big three: luminosity, polarization, background Improve communication with MCR (discussion with Lee Hammons)