Recommendation of Informal work group for changes to Weld Overlay requirements in API Spec 6A Chairman - Mike Briggs (Cameron) Members – Tim Haeberle(GE),

Slides:



Advertisements
Similar presentations
“RULES FOR INSERVICE INSPECTION OF NUCLEAR PLANT COMPONENTS”
Advertisements

Presented By: CFM/VR-TESCO, LLC Scott Smith – SVP & General Manager Roy Button – Welding Engineer & Specialty Welding (WDI) Division Manager.
SC 17A Task Force Summer Meeting Presentation June 2013.
Manufacture and Testing of a Large Zirconium Clad Vessel David Clift, P.Eng. Production Manager Ellett Industries September 14, 2005.
SC6 Ballot 1974: Adopt-back of ISO 10423:2009 as API 6A 20 th ed. Task Group Report on Resolution of Ballot Comments Eric Wehner 30 June 2010.
January 26, 2012 Renaissance Worthington Hotel Fort Worth, Texas Ed Durante, Chairman.
Subsea Standardization. Brief History SPE ATW on Subsea Standardization held Dec 2008 SPE ATW on Subsea Standardization held Dec 2008 –Form workgroup.
Don Wells Hess Corporation
AIA Iowa Complying with the 2014 FGI Acoustical Guidelines #A203 Jon W. Mooney PE September 26, 2014.
Process Specification Guidelines FAA/NASA Workshop 6 August 2002.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Presentation for SC17 Tuesday January 15, 2013
Conducting the IT Audit
1 API SC6 Winter Meeting Update on CSOEM MARG Activities Tim Haeberle Chief Consulting Engineer – Materials and Processes GE Oil & Gas 4 February 2015.
Tim Haeberle API SC Winter Meeting
1 API 16 AR Specification for Drill- through Equipment Remanufacturing Summer Standards Meeting Communication Jan van Wijk / Chris Johnson API-16AR chairman.
By: Carol Martineau, Acting Assistant Manager, Aircraft Maintenance Division, AFS-301 Date: June 7, 2015 Federal Aviation Administration ASA Conference.
API SC18 Liaison report Mike Briggs SURFACE SYSTEMS RAISING PERFORMANCE. TOGETHER TM.
Applied Materials Confidential Authorized Labels for Information: Applied Materials Confidential. Applied Materials Confidential Restricted/Modifier Applied.
Detail and Assembly Drawing
API Standard 6X: Design Calculations for Pressure-Containing Equipment
SFOBB East Span Seismic Safety Project Steve Margaris, Specifications Engineer, Caltrans.
Kpmg Canfor Vavenby Division Audit Report April SUMMARY OF AUDIT FINDINGS Objectives Findings Conclusions SUMMARY OF AUDIT FINDINGS Objectives.
Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.
API 6HP Process1 API 6HP Example Analysis Project API E&P Standards Conference Applications of Standards Research, 24 June 2008.
API 6A 21 st Edition WG API Subcommittee SC-6 Discussions Valves and Wellhead Equipment.
HOUSTON, TEXAS1 Pipeline Repair ENGINEERING SERVICES LP HOUSTON, TEXAS Engineering Specification.
MODU Safety Committee Objective The objective of this Procedure is to establish the terms of reference for the Safety Committee on board the MODU.
API 6A 21 st Edition WG Update API Subcommittee SC-6 Plenary Valves and Wellhead Equipment June 19 th 2014.
Update on the API Work Group Activities on Pipe Markings.
API Spec 6A Tensile Test Spec Reference Requirements Tim Haeberle API SC Summer Meeting.
API 6A 21 st Edition WG API Subcommittee SC-6 Discussions Valves and Wellhead Equipment.
FEASIBILITY REPORTS WHAT IS A FEASIBILITY REPORT? A feasibility report assesses if an idea or plan is practical based on specific criteria. Variety of.
Writing the IEE. EA Training Course 2 Writing the IEE IEE Preparation  Suggested steps in preparing an IEE are:  assembling relevant information resources.
JACTest Monitoring Center Test Monitoring Center Report to the Mack Test Surveillance Panel June 17, 2002 Montreal.
ASME BOILER & PRESSURE VESSEL CODE AN INTERNATIONAL STANDARD
Comments on Improving NSP Guidance Document Cambodia and the Philippines.
AutoDESA Presentation Project Documentation October 2005.
Sub Committee 6 Ballot resolution Summary June 2012 Mike Briggs.
Reactor pressure vessels of WWER (materials and technology) Janovec, J
Waggies Australian Gifts Report Writing.
Special interventions Status of production and QC Nicolas Bourcey TE-MSC-MDT Fourth LHC Splice Review November 2013.
API Spec 6A: ASME Section V And Section IX Reference Editions Tim Haeberle API SC Summer Meeting.
SVD QCG Report F.Forti. Outline Sep 09, 2015QCG Report, F.Forti2 view/Detector/SVD/SvdQCQAGrou p.
The British Accreditation Council: ensuring standards
Carry Over From API SC6 Winter Meeting API Spec 6A Tensile Test Requirements Tim Haeberle 30 June 2011.
Updates from SC18 Summer Meeting
API Spec 6A Tensile Test Yield Offset Requirements
Educational Overview Revised 6/13/2017
FINAL REPORT TECHNICAL WRITING NOOR SHAHARIAH BT SALEH
May 26, 2014 EFFECT OF EXPLOSION CLADDING INDUCED HARDNESS ON SULFIDE STRESS CRACKING AND STRESS CORROSION CRACKING RESISTANCE OF INCONEL 625 Outline:
TECHNICAL WRITING – THE BLENDED LEARNING INITIATIVE
API 14H Task Group Status Proper Classification of Document
Specification on float equipment
International Subsea Standardization
First 8 slides are what was presented in San Fransisco…
SC6 Summer ’13 Meeting: WG 14H Update
Final Year PROJECT REPORT FORMAT
Impact on SC 6 Documents by Kenneth Young
API 14H Task Group Status Proper Classification of Document
First Article Inspection
WG 2.5 Intercalibration.
Quality Regulation for Mechanical Equipment RESSQ – Mech
Information Analysis, Organization, and Presentation
Dennis Harwig and Bill Mohr, EWI
API Subcommittee SC-6 Discussions Valves and Wellhead Equipment
What are they preserving?
Segmented Woodturning Symposium October, 2018 James Rodgers
SC6 Valves and Wellhead Equipment
CSOEM Materials Advisory Resource Group
Presentation transcript:

Recommendation of Informal work group for changes to Weld Overlay requirements in API Spec 6A Chairman - Mike Briggs (Cameron) Members – Tim Haeberle(GE), Rodger Lawson (ExxonMobil), Kris Ohman (Shell), Joel Russo (FMC), David Zollo (FMC) SURFACE SYSTEMS RAISING PERFORMANCE. TOGETHER TM

SURFACE SYSTEMS RAISING PERFORMANCE. TOGETHER TM Background Current structure separates clad requirements by product type (Ring grooves, stems, VBSM and choke trims) and CRA overlay for BBEOC Acceptance criteria refers to BBEOC general NDE and is not tailored to overlays There is a great deal of confusion throughout the industry on what is required on overlay and when one requirement applies or doesn’t

SURFACE SYSTEMS RAISING PERFORMANCE. TOGETHER TM Current questions and controversial issues What surfaces do I inspect using UT? - 100% for part of Design Criteria; FBH Cal,.125” FBH Dia, When I do the UT what size FBH do I use what MTD do I use on the cal block? MTD Max Clad +.100” If I have a fully clad body do the ring groove get inspected to Weld overlay or CRA overlay? Should do the ring grooves the same as other cladding On UT do I have to re-inspect base material after cladding (1/2”, 100% or none)? Area of examination shall include cladding plus a minimum of 0.100”of surrounding base material Can I perform the UT on Ring Grooves prior to finish machining?

SURFACE SYSTEMS RAISING PERFORMANCE. TOGETHER TM Summary of WG’s proposed changes Separate cladding in to two groups for BBEOC – partial clad and full clad Procedure qualification requirements to be consolidated for ring grooves and CRA overlay Add section specifically addressing weld overlay inspection requirements to section This would address Visual Examination, Liquid Penetrant and Other testing. Address the overlay requirements for each component type (Tables17, 22, 23 and 37) instead of in a general table as is done in table 18 now.

SURFACE SYSTEMS RAISING PERFORMANCE. TOGETHER TM Conclusions Additional review is required to allow seamless blending of the requirements There are several discrepancies in the current standard that have raised additional questions by the workgroup. Will require API support to ensure any reference changes are accurately captured throughout the document