End Station Personal Safety Shutter TSC Design Presentation.

Slides:



Advertisements
Similar presentations
Process and Product Quality Assurance (PPQA)
Advertisements

1 Copyright Electric Power Research Institute 2008 Steam Turbine-Generator Guidelines Quick Start VolumeContent 1General Practices Condition assessment,
SPACE PRODUCT ASSURANCE
AS9102 First Article Inspection Report
RMM Systems, LLC By Sam Rietta RMM Systems, LLC is a manufacturer's representative firm focused on providing value added sales solutions by providing.
Cooling Business Group 1 Integrated Refrigerator.
PPAP Requirements Training
EQUIPMENT VALIDATION.
Trouble - Shooting ELR - Electric Latch Retraction.
Prototype Development of Automated Ring Main Unit System
First Article Inspection Report
Turnkey IC and Device Packaging Package Science Services LLC Package design, characterization, simulation, modeling, measurements and analysis.
GVH Connector Purpose: To introduce the GVH wire-to-board, crimp style connector from JST. Objectives: Illustrate the intended application. Discuss the.
Speedstack: PCB Stack Up Data Exchange Using IPC-2581 Rev B
Chapter 18 Working Drawings.
Fatigue Life Testing Platform for Electroformed Bellows EEEE Jadon Weinel Hector Vargas Customer: NiCoForm, Inc.Advisor: Dr. E. Debartolo EMEM Richard.
Helfried Rybin 1 AUTOMOBILENTWICKLUNG / ENGINEERING Safety Demands for Automotive Hydrogen Storage Systems Helfried Rybin.
Sector 13 Canted Undulator Upgrade Hutch Modification Requirements ( )
Printed Circuit Board Design
Engineer Training Electrical System Overview and Requirements.
Office of Aviation Safety Bob Swaim Airworthiness ABX Air Ground Fire.
Title page. 1. Identify the Problem Write a statement that answers the following questions. What are you trying to design? What are the requirement gaps?
TMT M1CS Actuator Pre-ship Meeting Avasarala Technologies Limited Bangalore, India September 13 th, 2013.
From Research Prototype to Production
9/19/2015IENG 475: Computer-Controlled Manufacturing Systems 1 IENG Lecture 12 Relay and Pneumatic (Fluid) Control Logic.
Scope To develop a interactive electronics control system and fabrication support to design a next Constant Climate Chambers. Existing product with heater,
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Printing Instructions:
LSST Camera CD-3 Review Brookhaven National Laboratory, Brookhaven, NY LSST Safety Council Camera Review Bremerton, WA 2015 LSST Camera Environment,
1 Jim Thomas - LBL New Pad Plane Design Proposal & Specifications Jim Thomas, John Hammond, Bob Scheetz, Jon Wirth, etc., etc., and a cast of thousands.
GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS D: Composite Panel Fabrication.
Documentation Traceability and documentation is required.
Using Infrared to Proactively Maintain the Distribution System Ben J Carranza.
2009 OFPC INSPECTION SUMMARY of VIOLATIONS We Need Your Help for the 2009 Inspection!
1 Criteria for a Successful FMEA Design & Process.
1 Jim Thomas - LBL Changes to the Inner Sector Strongback to accommodate a wall between the inner and outer sectors (and a 2 nd wall at the innermost edge.
Watt-Class Beamstoppers for ALS 01/26/2011 Tom Swain & Mike Kritscher.
1 PFDPU Mechanical Packaging PEER REVIEW MAVEN PFDPU Particle and Fields Data Processing Unit Mechanical Packaging and Design Overview May 09, 2011 Bill.
How the NCSX Project Does Business
Handout 10a1 TOLERANCES - Introduction Nearly impossible to make the part to the exact dimension by any means of manufacturing approach  tolerances of.
CLIC Permanent Magnet Quadrupole Engineering Development update Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 03/10/2011.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
Failure Modes and Effects Analysis (FMEA)
COSTING Blood Glucose watch ComponentPart No.Weight (kg)MaterialMaterial Cost £/kgPart Cost £/kg Plastic casing ABS Plastic casings ABS
Failure Modes, Effects and Criticality Analysis
1 Interfaces, Engineering and Standards. 2 Interfaces LoKI Interface document description for deliverables Elements: PBS number, Deliverable description,
1 Source Driver Update Yasar Onel - iowa On behalf of Paul Debbins and Ianos Schmidt HCAL Run Planning Meeting 6 Nov
1 Lesson 3, Version 1.11 High Voltage Training Criteria Jason Sempsrott Arming & Firing Systems Sandia National Laboratory July 21, 2016.
Mechanical Engineering Drawing MECH 211/M
Isometric & Orthographic Drawings
Kursus “electronic assemblies & SOLDERING Technique”
Welcome ! Capstone Design Lab is a new 4 credit course specifically aimed to give you industry design exposure in a design team atmosphere The course.
Welcome ! Capstone Design Lab is a newer 4 credit course specifically aimed to give you industry design exposure in a design team atmosphere The course.
Final project review presentation MSD P Visual and Auditory Object Recognition testing apparatus & objects Andrew Chorney- Project Manager Michael.
SCOUTBOTICS Engineering Notebook
الوحدة 20 مهارات التواصل مع الآخرين
Traceability of Gas Pipeline Materials Research & Materials Manager
Detail Drawings and Assembly Drawings
Cost of Test for Non-Linear Materials
4th Edition Chapter 24 Design Step #4: The Design Details.
Cryomodule Assembly Plan
SCOUTBOTICS Engineering Notebook
Undulator Controls Breakout
PSS0 Design & Concept of Operations
SNS PPU Helium Vessel Design and Assembly
Hardware integration and interfaces
4th Edition Chapter 24 Design Step #4: The Design Details.
4th Edition Chapter 24 Design Step #4: The Design Details.
Its strengths, your benefits
Presentation transcript:

End Station Personal Safety Shutter TSC Design Presentation

ES PSS Assembly Safety Requirements: Established OP 02-30

History - LBL Engineering note #10450 Different Versions: Proto Original Current - Rev. A (6mm.) - Rev. 1 (22mm.) - Rev. E (0.125”)

ES PSS Assembly Design Primary design details: Critical dimensions remain same Design is retro-fitable New switches New switch actuation design New switch access design Meets OP procedure criteria

New Switch Specification Switch Details: “924CE1-S3” Safety Rated High Cycle life Reputable Manufacturer Available

ISO Views

Upper and Lower Switch Actuation

Back Side Access and Top View

General Design Changes Changes to address Tracking issues: 1) Documentation via an engineering notes # MDC Specific # General PSS Assys at ALS 2) New part number assigned, Old versions obsolete 3) Shutters need tag for exterior indication - Name (LBL ALS ES PSS Assy) - Part number ( ) - Serial number (unique for ever unit) 4) Print details - Fabrication/ Assembly Procedure - Bill of material / wire diagram - Reference LBL Engineering note #10450

Specific Mechanical Improvements Changes to address fabrication and reliability issues: 1)Bellows leaks -> Usage 30K cycles vs. 100K cycles design - MDC design changes to increase number of cycles 2)Limit Switch failures -> New switches and actuation design 3)Access to switches -> New door style access 4)Paddle thickness -> Specified as 0.125” minimum - Changes design requires new assembly 5)Assembly inconsistencies -> MDC Procedure requirement added 6)Operational issues -> MDC Testing required. - Electrical circuit verification. - Cycle test – at least 100 cycles. - Paddle thickness measured. - Documentation to be provided.

Misc. views of assembly

Front Access View

Old Switch Design Old design / issues: Switch not safety rated Low cycle life Improper actuation No adjustability Wire damage

ES PSS Assembly Checklist To be completed after fabrication and delivered with each PSS assembly.

ES PSS Assembly Safety Requirements: Established OP Changes have not effected these requirements or have incorporated them.