Overview Dependent demand Dependent demand Master production schedule Master production schedule Bill of materials Bill of materials MRP MRP Time-phased.
Topics to be Covered 1. Material Requirement Planning
To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 15 Resource Planning.
Material Requirements Planning
Dependent Inventory: Material Requirements Planning BA 339 Mellie Pullman.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.
MRP and Dependent Inventory Models. Inventory Process stage Demand Type Number & Value Other Raw Material WIP Finished Goods Independent Dependent A Items.
Principles of Operations Management
Material Requirements Planning (MRP)
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.
Material Requirements Planning (MRP)
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
POM - J. Galván 1 PRODUCTION AND OPERATIONS MANAGEMENT Ch. 15: Material Requirements Planning (MRP)
21–1. 21–2 Chapter Twenty-One Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
MRP.
Materials Requirements Planning (MRP) Material Requirement Planning (MRP)  MRP determines the number of components and raw material required and their.
DOM 301 : Operations Management Practice
MRP, MRP II, and ERP.
Material Requirements Planning
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
© 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
Material Requirements Planning (MRP) Computer-based information system for ordering and scheduling of dependent-demand inventories, i.e. what is needed,
Aggregate Planning and Resource Planning Chapters 13 and 14.
Week #14-2 Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
1 Example: MRP Schedule LocoMopeds is a manufacturer of off-road mopeds. The following product structure diagram represents the bill of materials for.
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc. Upper Saddle River, N.J Material.
Materials Requirements Planning
Operations Management Material Requirements Planning
Material Requirements Planning (MRP)
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 22 1.
1 Slides used in class may be different from slides in student pack Chapter 16 Materials Requirements Planning  Material Requirements Planning (MRP) 
Resource Requirements Planning:
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Chapter.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.
Material Requirements Planning
Chapter 15 MRP and ERP.
1 Materials Requirements Planning. 2 Material Requirements Planning Defined Materials requirements planning (MRP) is a means for determining the number.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1998 Material Requirements Planning (MRP) Chapter 15 11/7/05 Overview Position of MRP in Operation.
14 - 1© 2014 Pearson Education Material Requirements Planning (MRP) and ERP PowerPoint presentation to accompany Heizer and Render Operations Management,
To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 12 Resource Planning.
Material Requirements Planning (MRP)
4/4: Material Requirements Planning Dependent inventory model For in-house inventory planning.
© The McGraw-Hill Companies, Inc., Master scheduling Material requirements planning Order scheduling Weekly workforce and customer scheduling Daily.
1 MRP: Based on Dependent Demand u This chapter explores: –Master production schedule –Material Requirements Planning (MRP) »System structure »Example.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 18 Material Requirements Planning.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Material Requirements Planning. Materials requirements planning (MRP) is a means for determining the number of parts, components, and materials needed.
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
Resource Planning Chapter 15.
Materials Requirements Planning
Operations Fall 2015 Bruce Duggan Providence University College.
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
BUAD306 MRP.
11-1  Material requirements planning (MRP): Computer-based information system that translates master schedule requirements for end items into time-phased.
Dr. S. S. Bhakar Director, PIMG. ‘‘ I often feel like the director of a cemetery. I have a lot of people under me. But nobody listens! ’’ - General John.
1 The MRP Heuristic  MRP stands for Materials Requirement Planning  It is a widely used approach for production planning and scheduling in industry 
© 2008 Prentice Hall, Inc.14 – 1 Material Requirements Planning (MRP)
© 2008 Prentice Hall, Inc.14 – 1 Operations Management Chapter 14 – Material Requirements Planning (MRP) and ERP PowerPoint presentation to accompany Heizer/Render.
CHAPTER-14 MRP AND ERP MD. TAZIDUL ISLAM. 2  Material Requirement Planning (MRP) is the concept of designing and developing information system to aid.
15-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
1 © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved Chapter 16 Materials Requirements Planning.
EVOLUTION OF ERP 1960’s - Systems Just for Inventory Control 1970’s - MRP – Material Requirement Planning (Inventory with material planning & procurement)
Reid & Sanders, Operations Management © Wiley 2002 Material Requirements Planning 15 C H A P T E R.
Chapter 13 MRP: Material Requirement Planning ERP: Enterprise Resource Planning.
Facility Inventory Old Facilities Modern Facilities Classroom Size
Chapter 16 Materials Requirements Planning
MRP.
Material Requirement Planning (MRP)
Operations Management
Presentation transcript:

1 Operations Management MRP Lecture 22 (Chapter 14)

2 Item Materials With Independent Demand Materials With Dependent Demand Demand Source Company CustomersParent Items Material Type Finished GoodsWIP & Raw Materials Method of Estimating Demand Forecast & Booked Customer Orders Calculated Planning Method EOQ & ROPMRP Dependent versus Independent Demand

3 Plans and their relationship MPS APP MRP SHORT TERM SCHEDULING HIGH LOW SHORT MEDIUMLONG TIME FRAME APP = Aggregate Production Planning: 3 – 18 months (medium/intermediate term) MPS = Master Production Schedule: 1 – 12 weeks MRP = Material Requirements Planning: Daily or weekly (short term) Short term scheduling: hourly (very short).

4 MRP Dependent demand technique that uses MPS, BOM, inventory, expected receipts and lead times to determine materials requirements Basis for ERP More preferable to EOQ models if relationship is known between items i.e. dependency occurs for the items under consideration Precisely determines feasibility of a schedule within capacity constraints

5 Dependent Inventory Model (MRP) Requirements MPS (what is to be made and when) Specifications or Bill of Materials (BOM) Inventory availability (what is in stock) PO’s outstanding (what is on order) Lead times (how long it takes to get various components)

6 Master Production Schedule (MPS) Timetable that specifies what is to be made and when Result of Aggregate/Production Planning process Disaggregates the AP (expressed in gross terms) into specific terms AP sets upper and lower bounds on the MPS

7 Aggregate Production Plan MPS 1,2001,500 Aggregate Production Plan shows the total quantity of bicycles Mountain bike Hybrid bike 100 Road bike Master Production Schedule Shows the specific type and quantity of bike to be produced Weeks FebruaryJanuaryMonths

8 Typical Focus of the Master Production Schedule Make to Order (Process Focus) Assemble to Order or Forecast (Repetitive) Stock to Forecast (Product Focus) Schedule finished product Steel, Beer, Bread Light bulbs, Paper Print shop Machine shop Fine dining restaurant Examples: Number of end items Number of inputs Typical focus of the master production schedule Schedule orders Schedule modules Motorcycles, autos, TVs, fast-food restaurant

9 Bill of Materials (BOM) Listing of components, their description and qty of each, required to make one unit of a product Due to rush to get product into market, BOM may be incomplete or non-existent Adequate to provide product structure and explode it to reveal requirements Low level coding done for items occurring at several levels

10 Bill Of Material Product Structure Tree Bicycle (1) P/N 1000 Handle Bars (1) P/N 1001 Frame Assembly (1) P/N 1002 Wheels (2) P/N 1003 Frame (1) P/N 1004

11 Purchase Orders Outstanding By-product of well managed purchasing and inventory control depts Prodn personnel should be well-informed about the orders placed and their scheduled deliveries

12 Lead times Time reqd to acquire (purchase, produce or assemble) an item For manufactured item, lead time = move time + setup time + assembly/run time For purchased item lead time = time between order placement and order receipt

13 Time-Phased Product Structure weeks F 2 weeks E A 1 week C G 2 weeks D 1 week E 2 weeks Start production of D D 1 week B 2 weeks to produce Must have D and E completed here so production can begin on B Time in weeks

14 Example

15 Item: B Description: Frame assembly Lot Size: 1000 units Lead Time: 2 weeks Gross requirements Scheduled receipts Projected on-hand inventory Planned receipts Planned order releases 115 Week MRP – Inventory Record

16 MRP – Planned Orders Item: B Description: Frame assembly Lot Size: 1000 units Lead Time: 2 weeks Gross requirements Scheduled receipts Projected on-hand inventory Planned receipts Planned order releases 115 Week

17 Item: B Description: Frame assembly Lot Size: 1000 units Lead Time: 2 weeks Gross requirements Scheduled receipts Projected on-hand inventory Planned receipts Planned order releases 115 Week MRP – Inventory Record

18 MRP – Planned Orders Item: B Description: Frame assembly Lot Size: 1000 units Lead Time: 2 weeks Gross requirements Scheduled receipts Projected on-hand inventory Planned receipts Planned order releases 115 Week

19 Structure of the MRP System MRP by period report MRP by date report Planned orders report Purchase requirements Exception reports MRP Programs Master Production Schedule BOM Lead Times (Item Master File) (Bill-of-Material) Inventory Data Purchasing data Data FilesO/p reports

20 Lot-Sizing Techniques Techniques used in determining order qty’s or lot sizes Lot-for-lot Economic Order Quantity Part Period Balancing

21 Lot-for-lot Lot sizing technique that generates exactly what is needed No safety stock or anticipation of further orders Works most efficiently when Frequent orders are economical (low set-up or ordering costs) JIT inventory techniques has been implemented

22 EOQ Preferable when demand is relatively constant and independent Not preferable for dependent demand Operations managers should take advantage of demand info when it is available rather than assuming constant demand

23 PPB Dynamic approach that balances setup / ordering and holding costs by changing the lot size to reflect requirements of next lot size in the future Develops an EPP – ratio of setup to holding cost Adds requirements until the part periods/holding costs approximate EPP

24 MRP in Services Can be used when demand for service or service items is directly related to or derived from demand for other services restaurant – demand for vegetables is dependent on demand for meals hospitals – equipment, materials and supply dependent on demand for surgeries

25 MRP in services