By: Christiano Daniel Abadi. Deliverables/Achievements in Spring 2000: 8 Systems Engineering Documents Overall and power budgets Gantt Chart for Preliminary.

Slides:



Advertisements
Similar presentations
LightSail.
Advertisements

Table of Contents Unit 1- Understand the Problem Unit 2- Gather Information Unit 3-Develop Solutions Unit 4-Implement a Solution Unit 5-Test and Evaluate.
Work, Energy and Power. Work = Force component x displacement Work = F x x When the displacement is perpendicular to the force, no work is done. When.
Questions from the European colleagues & Answers (only) from the Chinese engineers present for Y.-W. Zhang and S.-G. Yuan Chinese Academy of Space Technology.
Page 1 Aalborg University Communication system for the AAUSAT-II Communication System for the AAUSAT-II Kresten K. Sørensen Department.
HIGH ALTITUDE BALLOON (HAB) SENIOR DESIGN PROJECT Odera Eziolisa Dale Hardacre Kaneisha Wilson Advisors: Joseph C. Slater, PhD, PE J. Mitch Wolff, PhD.
Proposal Analysis Review NMSGC Student Launch University/Institution Team Members Date.
Data Test Review Spaceport America Student Launch University/Institution Team Members Date.
Flight Readiness Review New Mexico Space Grant Consortium University/Institution Team Members Date.
AAE450 Spring 2009 Final Presentation Draft Slides Description: Some draft slides and ideas 3/26/09 Kris Ezra Attitude 1.
By Matthew Patterson. L ow E arth O rbit N anosatellite I ntegrated D istributed A lert S ystem.
UH CubeSat Project Organizational Group Meeting November 28, 2001.
Chapter 5: Project Scope Management
Satellite communications and the environment of space Images: NASA.
Project Scope Management J. S. Chou, P.E., PhD.
Introduction to the Global Positioning System. What is the GPS? Orbiting navigational satellites Orbiting navigational satellites Transmit position and.
Project Management and Scheduling
Róbert Adam.  GLONASS = Global navigation satellite system (Globalnaya Navigatsionnaya Sputnikovaya Sistema)  Radio-based satellite navigation operated.
1© Manhattan Press (H.K.) Ltd. Work Energy Energy 3.6 Work, energy and power Power Power.
Measurements and Calculations
1 Project Name Solar Sail Project Proposal February 7, 2007 Megan Williams (Team Lead) Eric Blake Jon Braam Raymond Haremza Michael Hiti Kory Jenkins Daniel.
Team Balloon Satellite II Multi-Disciplinary Senior Design CSEN 4201 Level II Mid-Term Report 17 October 2003 Mentor: Tony Kim.
Steps to the Preliminary Design Review (PDR) ACES Presentation T. Gregory Guzik January 28, 2003.
Technological Design STS-118 Lunar Plant Growth Chamber Challenge © 2013 International Technology and Engineering Educators Association STEM  Center for.
1 Formation Flying Project Proposal 2/5/07 Rachel Winters (Team Lead) Aziatun Burhan Tsutomu Hasegawa Shunsuke Hirayama Matt Mueller Masao Shimada Shelby.
Tielong Zhang On behalf of the CGS Team in the Institute of Geology and Geophysics, Chinese Academy of Science Spacecraft System and Payload China Geomagnetism.
Student Satellite Project Laser Communications Group 2 Laser Communications Group Members Team Mentor: Dr. William Wing Team Leaders:Matthew Johnson (ECE)
Exploring Our Past, Securing Our Future Space Grant Symposium April 12 th 2014 Model-based Systems Engineering of The OSIRIS-REx Mission's Science Processing.
DCH Requirements b Process at a rate fast enough to maintain all data storage and command handling tasks. b Have sufficient storage space to hold the OS,
Student Satellite Project Tracking, Telemetry & Command UASat Progress Review Tracking, Telemetry and Command (TTC) January 26, 1999 Dana Irvin, Team Leader.
COMT 3911 Satellite Basics COMT 391 Wireless. COMT 3912 Satellite Components Satellite Subsystems –Telemetry, Tracking, and Control –Electrical Power.
AIAA RM Second ATS at UCCS Polar-Orbiting, Passive, Atmospheric Calibration Spheres (POPACS) Presented by R. Gilbert Moore Director, Project.
PSAA Curriculum Unit Physical Science Systems. Problem Area Energy and Power Systems.
Energy Transformations and Conservation of Mechanical Energy 8
Section Number - 1 NASA’s Goddard Space Flight Center Communication Systems Jason A. Soloff NASA/GSFC Code 567 August 16-17, 2005.
One of the most significant intellectual achievements in the history of thought.
Guidance, Navigation and Controls Subsystem Winter 1999 Semester Review.
Spaceborne 3D Imaging Lidar John J. Degnan Geoscience Technology Office, Code Code 900 Instrument and Mission Initiative Review March 13, 2002.
1 EENG 1920 Chapter 5 System Design I: Functional Decomposition.
1 Mission Discussion & Project Reviews 祝飛鴻 10/14/93.
1. G O D D A R D S P A C E F L I G H T C E N T E R 2 New Budget Initiatives for NASA in FY04.
1 Jet Propulsion Laboratory JPL Flight Team Adam Nikolic Josh Ruggiero Bob Hoffman Dusty Terrill.
Team SSCSC Critical Design Review Nick Brennan, Kier Fortier, Tom Johnson, Shannon Martin, Dylan Stewart, and Adam Wright October 05, 2010 Fall 2010 Rev.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Haripriya Head, Integration Team Pratham, IIT Bombay 19 th June, 2010.
Basic Satellite Communication (3) Components of Communications Satellite Dr. Joseph N. Pelton.
From you host … Dr. H. Introduction Communications design requires us to think about the following issues: Communications design requires us to think.
Work, Power and Energy. Work - Definition The Scientific definition of the term work is quite different than what people commonly consider. Work is done.
Amy Blas Hawaii Space Flight Laboratory University of Hawaii.
Chapter8: Conservation of Energy 8-7 Gravitational Potential Energy and Escape Velocity 8-8 Power HW6: Chapter 9: Pb. 10, Pb. 25, Pb. 35, Pb. 50, Pb. 56,
Colorado State University Paul Scholz, Tyler Faucett, Abby Wilbourn, Michael Somers June
Newton’s Law of Universal Gravitation. Law of Universal Gravitation.
AAE450 Spring 2009 Attitude Determination in Low Earth Orbit Description: Determine Attitude Accuracy Upper and Lower Bound Recommend Addition of Sun Sensor.
Energy Chapter 15. Science Journal Entry 22 Describe two types of energy (energy sources for humans) and what you believe are the advantages and disadvantages.
EDGE™ Preliminary Project Plan P09102 – METEOR Stage Separation System JJ Guerrette (ME)
Science in the Natural World
Planetary Lander PDR Team Name
Preliminary Platform Design for KuaFu-A
Aerodynamic Attitude Control for CubeSats
Mass training of trainers General Physics 1
Telemetry system The telemetry, tracking, and command (TT&C) subsystem performs several routine functions abroad a spacecraft. The telemetry or "telemetering"
PROJECT METEOR: RITSAT1 P08102
Space Proximity Atmospheric Research above Tropospheric Altitudes
Chapter 1 - General Principles
Applied Dynamics - Assignment
Work & Power How the world works…..
Off-Road Equipment Management TSM 262: Spring 2016
Technician Licensing Class
Team Name Conceptual Design Review
Main information on the «WORLD SPACE OBSERVATORY» project
Presentation transcript:

by: Christiano Daniel Abadi

Deliverables/Achievements in Spring 2000: 8 Systems Engineering Documents Overall and power budgets Gantt Chart for Preliminary Design Review

8 Systems Engineering Documents: Description: A systems-level document of UASat containing: Problem Statement Description of participants General input, output, and function of the system Requirements Testing procedure Functional decomposition and physical synthesis Audience: Public, Upper Management, Systems Engineer

Procedure: Write the documents with information gained from Team Leaders, Team Mentors, websites, and other references. Distribute to all members, mentors, and administration. Get feedback and revise. Iterate as many rounds as needed.

Contents of Documents: A general block diagram that describe the overall satellite (see OHP)

Requirements: (Disclaimer: The numbers and information in red italics are just a starting estimate and are not meant to be accurate. Cost requirements: 1.The satellite shall cost no more than $1,500,000, - to model, design, build, and test. Schedule requirements: 1.The satellite should be ready to be delivered to NASA no later than March 2004.

Requirements (cont.): Performance requirements: Mandatory Requirements Launch conditions from NASA 1.The satellite shall orbit between and 57 0 of inclination. 2. The satellite shall orbit between 250 kilometers and 400 kilometers above the earth. Requirements owned by Mechanical and Structural Analysis (MSA) 3.The satellite, when not operating, should withstand the temperature range of –20 0 C to 50 0 C. 4.The operating temperature range shall be maintained between –10 0 C to 20 0 C. Restriction from the Hitchhiker Canister (given by NASA) 5.All components of the satellite that weigh more than 9 kg shall withstand the force of gravity of no less than + 11 Gs. 6.All components of the satellite that weigh less than or equal to 9 kg shall withstand the force of gravity of no less than + 40 Gs.

Mandatory Requirements Restriction from the Hitchhiker Canister (given by NASA) (cont.) 7.The weight of the satellite shall be no more than 68 kg. 8.The height of the satellite shall be no more than 52 cm. 9.The diameter of the satellite shall be no more than 48 cm. 10.The center of gravity of the satellite shall be no more than 1.27 cm from the canister centerline. 11.The center of gravity of the satellite shall be no more than 26 cm from the separation plane. Preference Requirements (determined by the SSP) Owner of requirements: All teams. 12.The lifetime of the satellite should be no less than 1 year. 13.The units of measurements of the satellite should be in SI system (i.e.: US$, kilograms, centimeters, seconds, 0 C, (degree, minute, second for angular units), G (gravitational force), Kilohertz, Volts, and Watts). 14.The peak power needed from all components in the satellite at any instant of time shall be no more than 30 Watts.

Performance requirements (cont.): Owner of requirements: Guidance, Navigation, and Control (GNC) Team 15.The orbital altitude of the satellite should be 400 km. 16.Pointing in accuracy of the satellite shall be no more than The satellite should be able to de-tumble within 1 orbit. (De-tumbling means the ability of the satellite to stabilize itself after an accidental collision that tumbles the satellite) Owner of requirements: Sprite and Lightning (SCI 1) Team and Data and Command Handling (DCH) Team. 18.The satellite should be able to detect and store (in the satellite’s computer memory) lightning counts on average 300 occurrences per day. 19.The satellite should be able to image (photograph) and store (in the satellite’s computer memory) sprite phenomena on average 300 occurrences per day.

Owner of requirements: Power Generation and Distribution (PGD) Team 20.The power system will supply DC electricity at the following voltages: +28V, +15V, -15V, +5V, -5V, or 3.3V. Owner of requirements: Laser Communication (LCS) Team 21.The laser communication devices should transmit data uplink of 10 Mbit/sec. Owner of requirements: Tracking, Telemetry, and Command (TTC) Team 22.The radio (QFSK Transmitter for the amateur 2.4 GHz band) should transmit data downlink of 2 Mbit/sec. 23.The radio (QFSK Receiver for the amateur 1.2 GHz band, Pascat Downlink, and Pascat Uplink) should receive or transmit data of 9600 bits/sec.

Trade-off Requirements: The cost requirement has 25% weight The schedule requirement has 15% weight The performance requirements have 60% weight

Figure of Merits: Description: a number that indicates how well the system has met all the requirements. Calculated by summing all of the requirements’ score with the weight assigned to each requirements defined in the Weight Table.

Standard Scoring Function (SSF): Example: 1. The lifetime of the satellite should be no less than 1 year.

Weight Table:

Overall and Power Budget: There are five factors to juggle in deciding what instruments to chose:  Power consumption  Cost  Volume  Mass  Bandwidth

Overall Budget for UASat

Power Budget: The power budget discussion between teams has started. Negotiation on power requirements will continue. Solutions to over budget: reduce power, rationing operation time, redesign solar panel, etc.

Sample graph of the power profile for each team

Gantt Chart for the Preliminary Design Review Helped by the MIS 578 Team Propose the Gantt Chart for Preliminary Design Review Use the NASA’s IMAGE PDR as the template Iteratively negotiate with all teams to reach the readiness of PDR. Example:

Things to do next Initiate discussion between Science and LCS teams with the rest of the teams in finding out what the Science and LCS teams want to do with the data. Find out:  What kind of data will come in (in terms of bytes)?  How frequent will the data come in?  Is there any processing done in satellite?  What are the data processing and analysis plans?  What to do with old data?