WG FBA report Dr. Uroš Gabrijel (ELES) IG Meeting, Vienna, 13 February 2009.

Slides:



Advertisements
Similar presentations
4th CSE ERI Stakeholders Group meeting AEEG – European regulatory affairs 15 maggio 2012 Overview of the regional work programme towards 2014.
Advertisements

Technical System Options
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
2 nd IG-Meeting Preparation of the Coordinated Physical Transmission Right (PTR) Allocation Scheme for the CEE – Region Vienna
8 th IG-Meeting Coordinated Auctioning, Auction Office and Organisational Issues Christian Todem Vienna
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
Intraday conclusions of NWE IG 9 May. Short term way forward (phase 1) PXs and TSOs confirmed commitment to 2012 intraday project based on ELBAS solution.
CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe.
1 XVI Florence Forum Jose Sierra Madrid, 4 June 2009 Chair, RIG ERGEG Electricity Regional Initiative Update & Progress.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
Task Force on National Greenhouse Gas Inventories Tier 3 Approaches, Complex Models or Direct Measurements, in Greenhouse Gas Inventories Report of the.
MGD Advisory Group Meeting Sydney 5 th March 2015.
Ort, Datum Autor UNFCCC General and cross-cutting issues - summary of the discussions - Workshop on emissions projection Bonn, Germany 6-8 September 2004.
Frequency Co-ordination -for what? The Agreement Frequency Co-ordination -Advantages Frequency Co-ordination -Disadvantages The Procedure Administrative.
Conclusions & Recommendations
Romaric GUILLERM Hamid DEMMOU LAAS-CNRS Nabil SADOU SUPELEC/IETR ESM'2009, October 26-28, 2009, Holiday Inn Leicester, Leicester, United Kingdom.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
Romaric GUILLERM Hamid DEMMOU LAAS-CNRS Nabil SADOU SUPELEC/IETR.
PPMT CE408T Engr. Faisal ur Rehman. Presentation Outline Project Porcurement Managment Project Closure.
Action for establishing a Single Auction Office for CSE Electricity Regional Initiative - Central-South Region 2 nd Stakeholders Group Meeting 21 April.
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
Update on transit compensation mechanism application in Baltics Arnis Staltmanis Head of International Project Department 16 September 2009, Vilnius.
TYNDP SJWS #3 Demand TYNDP – 3 rd SJWS 08 March 2012 ENTSOG offices -- Brussels.
Enhancement of participation of local stakeholders, key to success of CDM projects: Current rules and procedures under the CDM Fatima-Zahra Taibi, UNFCCC.
WG FBA Status Report Andrzej Detkiewicz IG, 30 ty January 2008.
EUROPEAN COMMISSION Transparency – Proposal to amend chapter 3 of the Annex of Regulation 1775/2005 EUROPEAN COMMISSION H. Hick, DG TREN C 2 NW GRI 5th.
1 Auction Office establishment, antitrust issues and Project Plan IG Meeting, Vienna January 30 th 2008.
Metadata Models in Survey Computing Some Results of MetaNet – WG 2 METIS 2004, Geneva W. Grossmann University of Vienna.
Concept of Transparency Platform Martin Reisner Junior Adviser, Transparency ENTSOG’s Transparency Workshop Brussels – 11 September 2012.
The Status Report for IG meeting Wojciech Jarosz February 13 th 2009.
How do CEE countries benefit from improved regional cooperation? from the Czech TSO perspective The Regional Initiatives - Progress and Prospects Joint.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
The Development of BPR Pertemuan 6 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
0 Congestion management Congestion management Giedrius Radvila AB “LIETUVOS ENERGIJA” Minifora Vilnius.
SmartNets Results Overview SmartNets SmartNets Methods.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
3 rd Stakeholders Group Meeting Project status and details of the ongoing development of the load-flow based capacity calculation/allocation system CEE.
44th GRSP Session Status report of Informal Group on FI Pierre CASTAING Chairman Informal Document No. GRSP (44th session, December 2008, agenda.
IG Meeting Transmission Development activities in the CEE Region in the scope of Coordinated Transmission System Development WG and UCTE Central East Forum.
Implementation of Transparency Guidelines Martin Reisner Advisor Current Status and future Challenges Ljubljana – 13 September 2012.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
1 LTE standards Status for this work in 3GPP and what next for the Future Francois COURAU 3GPP TSG RAN Chairman.
GRI NW Investment - Update on project Common effort on making regional investment happen 21 September 2010.
EGTEI – Expert Group on Techno-economic Issues Methodology for data collection Presented by Nadine Allemand EGTEI secretariat Workshop to promote ratification.
Gas Regional Initiative North West Region - Short Term Capacity 7th Stakeholder Group Meeting The Hague – 6 and 7 May 2010.
European Commission views on intra-day and balancing markets
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
CWE TSOs clarification document related to the “new DE/AT GSK” October
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
A DVANCED A LLOCATION S TARTS W ITH U S ! CAO P ROGRESS REPORT 21 ST IG M EETING 26 J ANUARY 2010.
Development of System Operation Network Codes ACER Workshop 24 August 2011 Ole Jan Olesen, Convenor ENTSO-E Working Group on European Operational Standards.
International Accounting Standards An older set of standards stating how particular types of transactions and other events should be reflected in financial.
Doc.: IEEE /0147r0 Submission January 2012 Rolf de Vegt (Qualcomm)) Slide ai Spec Development Process Update Proposal Date:
1 WG FBA report Uroš Gabrijel IG Meeting, Vienna, May 9th 2008.
Trades and Transfers Workshop, 6 th November 2007.
Copyright 2010, The World Bank Group. All Rights Reserved. Principles, criteria and methods Part 1 Quality management Produced in Collaboration between.
IG Meeting Flow-based Coordinated Auction Allocation Scheme for the CEE – Region Report WG – CA Christian Todem 18 th IG Meeting, Vienna April 30 th 2008.
BIMILACI 2007 Partners for Quality Infrastructure: The FIDIC Vision Washington, May 10, 2007 Dr. Jorge Díaz Padilla FIDIC President.
Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.
WG FBA Status Report Jerzy Dudzik IG Meeting, 12 th June 2007.
Gas Regional Initiative South South-East
Congestion Management
New transparency guidelines
IFA Market Coupling Update
Gas Regional Initiative South South-East
Incentives for electricity infrastructure – ERGEG view
Gas Regional Initiative South South-East
Presentation transcript:

WG FBA report Dr. Uroš Gabrijel (ELES) IG Meeting, Vienna, 13 February 2009

Presentation outline  Annex to WP1&2 - results  Reliability margins – (WP2) results  CEE/CWE workshops  To-do

Annex to WP1&2 - results (1)  Investigation of means to control network security level for FBA  Scope of analyses:  Local means  Broader use of generation shift keys  Amendment to preparation of scenarios  Increase maximum allowed flows on particular branches  Consideration of subsequent outages  Reduce list of critical branches  Global means  Assume some level of export/import as certain  Introduce minimum positive AMF  Neglecting small flow impacts

Annex to WP1&2 - results (2)  Work under scope of Annex to WP1&2 was completed and final report accepted.  WG FBA carefully examined the results and agree on the following:  Global means to control network security  Could be applied only under full (8TSO) agreement  “Minimum positive AMF” for all critical branches is acceptable for long term allocations  Level to be applied is still to be discussed/investigated  Clear definitions to be adopted  Negative AMF in D auctions still under discussion

5 Annex to WP1&2 - results (3) Annex to WP1&2 - results (3)  Local means to control network security  Could be individually applied  Redefined “Generation/load shift key” proved to be most efficient since it enables higher accuracy  Transparent usage required

6 Reliability margins (1)  Results of Base Flow Reliability Margins (BFRMs) analysis  Bandwidth of flows caused by external exchanges differs from TSO to TSO  Feasibility of statistical approach was proven  Uncertainties for daily auctions are significantly smaller than for yearly/monthly auctions  Results of Flow Reliability Margins (FRMs) analysis  Representation of modeling uncertainties could be expressed as a fraction of Total Max Flow

7 Reliability margins (2)  According to HLM resolution 24/4, WG prepared a proposal for common approach to Reliability Margins determination.  Major characteristic of the common approach to BFRM is simultaneous use of results obtained upon agreed statistical methods and transparent application of individual decisions. Values to be implemented and tested will be provided by each TSO  WG FBA proposes to apply FRM=10 % TMF (covering 80 % of flow deviations) - subject of revision based on additional information from operational experiences

8 CEE/CWE workshops  CEE (WG FBA) / CWE (R4CA, FBI) workshops  Two workshops were held on and  Topics  Information exchange (experiences, proposals…)  Data sets (models) exchange - definitions  Inter-regional data exchange plan

9 To-do (1)  Further investigations:  Methodological verifications of specific cases based on amended existing datasets from WP1/Annex  Analysis on statistically representative new test samples – use of CAO IT tool – internal dry-run  The Concept update  Provide consultancy to CAO  Inputs to Technical requirements specification  Determination of operational processes and interface requirements among TSOs and CAO

10 To-do (2)  Stipulate TSOs to adapt internal process for FBA prerequisites (2DACF…) as a basis for providing data for further testing of technical parameter refinements and CAO processes  Intermediate solution for intra-day market

Thank you for your attention!