Collaboration with IEEE P2413 Source: Omar Elloumi, TP Chair WG: TP Meeting: TP17.

Slides:



Advertisements
Similar presentations
Open Interconnect Consortium Introduction for oneM2M
Advertisements

Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Standardization Activities on M2M communications Joachim Koss, ETSI Board Member Document No:
Kupu Taurangi Hauora o Aotearoa. Health and Disability Consumer Representative Training MODULE TWO Experience base.
Steve Kenny Presented by: Larry Korba Design Embedded Privacy Risk Management Institute for Information Technology 14 th CACR, November 7,8, 2002.
GLOBAL ICT STANDARDISATION FORUM FOR INDIA (GISFI) Prof. Dr. Ramjee Prasad, CTiF, Aalborg University Fellow IEEE, FIET, FIETE, FWWRF - Founding Chairman,
Standards for Shared ICT Jeju, 13 – 16 May 2013 Gale Lightfoot Senior Staff Program Manager, Office of the CTO, SPB Cisco ATIS Cybersecurity Standards.
OneM2M Draft proposal for slide set. This is not intended to be a oneM2M presentation. It is a collection of source material slides which can be used.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All IEEE-SA Smart Grid Steve Mills, President, IEEE Standards Association Document No: GSC16-PLEN-47.
DOCUMENT #:GSC15-PLEN-08 FOR:Presentation SOURCE:ISACC AGENDA ITEM:Opening Plenary (4.5) CONTACT(S):Jim MacFie ISACC Activities Since GSC-14 Jim MacFie.
US NITRD LSN-MAGIC Coordinating Team – Organization and Goals Richard Carlson NGNS Program Manager, Research Division, Office of Advanced Scientific Computing.
DOCUMENT #:GSC15-CL-04 FOR:Presentation SOURCE:CCSA AGENDA ITEM:Closing Plenary, 2.3 GTSC-8 Summary Report Duo Liu GTSC-8.
World Class Standards CCIF New York - April Grids, Clouds and Service Infrastructures ETSI Strategy & New Initiatives.
SALSA-NetAuth Joint Techs Vancouver, BC July 2005.
THE GEO GLOBAL CAPACITY BUILDING SYMPOSIUM Seville (Spain) September 10 & 11, 2007.
CPI Conference 2001 Making Virtual Teams Work Virtual Teams Project Team Chris Parker Parsons Energy & Chemicals Group Virtual Teams Project Team Chris.
Kevin Novak, Chair W3C Electronic Government Interest Group April 17, 2009.
Report of co-conveners WG1/WG2 meetings between TP1 and TP2 Group Name: Technical Plenary #2 Source: Omar Elloumi, Alcatel-Lucent,
CEOS Membership & Participation: A First Look. Membership & Participation Study Objectives: To better understand why some CEOS members and associate members,
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
Consumer perspectives on the introduction of ENUM in Australia Teresa Corbin Acting Executive Officer Consumers’ Telecommunications Network.
Overview TIA TR-50 – Smart Device Communications Orlett W. Pearson March 2010.
GSC-19 Meeting, July 2015, Geneva Agenda IoT session – part 2 Luis Jorge Romero, Director General, ETSI Document No:GSC-19_200c Source:ETSI Contact:Luis.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Cloud Computing in TTC Kazunori MATSUO, TTC Cloud Computing Advisory Group Document No: GSC16-PLEN-17.
Text #ICANN51 GAC / GNSO Joint Meeting 12 October 2014.
Central Florida Partnership Board of Directors Meeting March 20, 2013 Mark Brewer Member – Leadership Council for “Turning the Page” President/CEO – Community.
GISFI_SeON_ GISFI#09, Jun Report – SeON WG GISFI #9 GISFI # 09, Jun 18-20, 2012, Mumbai Chair: Parag Pruthi, NIKSUN Chair-Delegate:
Work Group / Work Item Proposal Slide 1 © 2012 oneM2M Partners oneM2M-TP oneM2M_Work_Group_Work_Item_Proposal Group name: Technical Plenary Source:
WG5 - MAS Progress Report at TP #9 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang, Chair, Meeting.
Architectural Principles for Services Group Name: WG2- ARC Source: Tim Carey, ALU, Meeting Date: Agenda Item:
Working Group 8 – E9-1-1 Best Practices June 6, 2012 Robin Howard Chair WG 8 – E9-1-1 Best Practices.
Slide: 1 CEOS SIT Technical Workshop |Caltech, Pasadena, California, USA| September 2013 CEOS Work Plan Section 6.1 G Dyke CEOS ad hoc Working Group.
CEOS accomplishments in 2011 and future challenges Enrico Saggese ASI 25th CEOS Plenary Lucca 8-9 November 2011.
An introduction to oneM2M
1 HGI MESSAGE TO ONEM2M TECHNICAL PLENARY HANS WERNER BITZER, DEUTSCHE TELEKOM VICE CHAIR, HGI ONEM2M TP#19, SOPHIA ANTIPOLS, FRANCE.
ATIS Overview December 9, ATIS in Brief Alliance for Telecommunications Industry Solutions (ATIS): With a focus on interoperability and innovation,
Government and Industry IT: one vision, one community Vice Chairs April Meeting Agenda Welcome and Introductions GAPs welcome meeting with ACT Board (John.
Release Timeline Discussion R2 and beyond Group Name: TP_WPM Source: Roland Hechwartner, WPM Convenor, Meeting Date:
OneM2M Partnership Project. Contents Introduction Founding Partners Participation Scope & Objectives Structure Deliverables Contacts © 2013 oneM2M Partners.
Joint CCAMP, L2VPN, MPLS & PWE3 meeting on MPLS-TP Dublin
VC/WG Day Expected Outcomes and Introduction of Agenda Jean-Louis Fellous SIT Chair Team CEOS SIT Technical Workshop CNES, Montpellier, France 16 th September.
Draft-melia-mipshop-mobility-services-ps-01.txt. From IETF #66 Discuss MIH PS (as expressed by the WG chair) Need a single PS at WG level (several drafts.
Current and future work of the Adaptation Committee in the area of adaptation technologies Workshop on technologies for adaptation Bonn, Germany, 4 March.
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
Technical Plenary Update on collaborations From: oneM2M TP Chair Source: Meeting Date: Agenda Item:
Status summary of the ad-hoc discussions 29th of June 2012 oneM2M call.
Technical Plenary Terms for the collaboration with P2413 From: oneM2M TP Chair Source: Meeting Date: Agenda Item:
IoT R&I on IoT integration and platforms INTERNET OF THINGS
Discussion for Testing related Activities Group Name: TP Source: JaeSeung Song, KETI, Meeting Date: Agenda.
Internet Of Things (IoT)
DESIGN FOR DYNAMIC REQUIREMENT AND DIVERSE USER EXPERIENCE
Report from Session #2: SDN/NFV
Release Timeline Discussion R2 and beyond
WPM ad-hoc group report TP#25
Evaluating Digital Learning Implementation with the CWiC Framework
Presenter: Luis Jorge Romero oneM2M Steering Committee Chairman
WGCV-43 meeting overview, goals, and agenda approval
An introduction to oneM2M
Pervasive Computing Happening?
Report from session #2 - IoT Luis Jorge Romero, “enabler”
GLOBAL ict standardisation forum for india (Gisfi)
WLAN Architectural Considerations for IETF CAPWAP
RR-TAG Opening Report Report on November 2007 plenary meeting
WG Capacity Building & Data Democracy (WGCapD)
Employee engagement Delivery guide
WLAN Architectural Considerations for IETF CAPWAP
April 19 January 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: RFID-SG Closing Report for Taipei.
ETSI Standardization Activities on Smart Grids
Report from Session #2: SDN/NFV
Report from session #2 - IoT Luis Jorge Romero, “enabler”
Recent Standardization Activities on Cloud Computing
Presentation transcript:

Collaboration with IEEE P2413 Source: Omar Elloumi, TP Chair WG: TP Meeting: TP17

Introduction Joint workshop hosted by IEEE P2413 in conjunction with P2413 plenary meeting that took place April 27th 2015 in Grenoble France Objectives of the workshop – Explore synergies – Review reference architecture of oneM2M (see next slide for more information) Agenda of the workshop: – A brief presentation of the oneM2M work – A brief presentation of P2413 work – oneM2M’s ideas regarding oneM2M/P2413 potential collaboration – P2413’s ideas regarding oneM2M/P2413 potential collaboration – Roundtable discussion – Conclusion (prioritized list of collaboration opportunities) It was made clear that the workshop is non decision making from oneM2M perspective (the meeting is considered as an ad’hoc)

Additional background The IEEE P2413 working group is chartered to produce a reference architecture through which concrete architectures and protocols (e.g., oneM2M) can be expressed. One of the current activities of the working group is to review the reference architectures of various standards bodies and fora, to this end a team of 12 people from oneM2M member companies attended this plenary in order to present the oneM2M architecture and answer any questions. The presentation was well received with questions concentrated in the areas of adapting to constrained environments, security implications and dynamic requests and responses. The outcome of the meeting was that oneM2M and IEEE should further collaborate to ensure the oneM2M architecture can be expressed within the IEEE P2413 reference architecture. Note: During the plenary it was discovered that IEEE P2413 has a goal to be service oriented in order to easily integrate with the business systems and process operations that are prevalent in the industrial automation solutions. Work will be needed to consider how a oneM2M framework would effectively integrate into this type of ecosystem. IEEE P2414 official contact is Wael Diab who is tasked to organize the follow-up from IEEE P2413 side. Mr Diad suggested a followup call the week of May 25th oneM2M TP needs to discuss and decide a way forward

Possible Areas for collobations Integration of local versus cloud based approaches, Use of virtualization, Digital representation of physical world, Integration of the networking technologies with a focus on energy efficient networking and application fitness, Trust, security, privacy and safety, Semantic interoperability, Collaboration between resource and service based architectures.