Wholesale Market Subcommittee April 12, 2012 ERCOT Dynamic Ratings Application.

Slides:



Advertisements
Similar presentations
Page 1 ERCOT Project Status 1 ERCOT Dynamic Ratings METF March 29, 2012.
Advertisements

IMPACT TO FREQUENCY CONTROL DURING STARTUP AND SHUT DOWN OF UNITS
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
CRR Shortfall – Revenue Equalization Part 2 (Continuation from 2/21/08 TPTF discussion) Bill Barnes TPTF 3/5/2008.
Concerns with RUC Capacity Short Charge and Energy Trades.
©2012 | Commercial in Confidence | Proprietary to Ventyx, An ABB Company NYISO Real-time Market Presentation to ERCOT METF – April 26, 2012 Confidential.
Real-Time Transmission Congestion Management & Market Effects
Utility Regulation March 10, 2011 Raj Addepalli Deputy Director, Electric, Office of Electric,Gas and Water New York State Department of Public Service.
North American Electricity Markets APEX Paris, France October 15-16, 2007 Kenneth Laughlin, PJM.
John Dumas Director of Wholesale Market Operations ERCOT Operating Reserve Demand Curve.
MISUG Meeting Materials ERCOT 10/16/ Agenda 10/16/ Antitrust AdmonitionJ. Lavas 9:30 a.m. 2.Introduction/Agenda OverviewJ. Lavas 9:35 a.m.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Requirement Documents November 7, 2006 Sai Moorty MMS Project.
Congestion Revenue Rights Activity Calendar Update Donald House CMWG September 19, 2014.
Load Distribution Factor Calculation Update for Market Applications and studies a Presentation for NATF 11/2/ NATF1Texas Nodal.
August 17, 2011 Reliability Deployments Task Force Meeting Updated Analysis of Non-Spin Deployments and RUC John Dumas Director Wholesale Market Operations.
Lead from the front Texas Nodal 1 External Web Services Update Nodal Implementation Team Presentation July 7, 2009.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
1Texas Nodal Texas Nodal Commercial Systems COMS CSD Presentation By ERCOT Wednesday, 1/10/2007.
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
1 Market Trials Update NATF June 1, 2010.
March 6, 2012 ERCOT Public ERCOT CRR Update Matt Mereness ERCOT Manager Day-Ahead Market and CRR Auction.
April 2, 2008 CRR Team Update PCRRs CRR Team UpdateApril 2, 2008 Table of contents 1.What is a PCRR? 2.Which NOIEs are eligible for PCRRs? 3.What.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
1 Market Trials Open Market Participant Call Weekly Kick Off March 01, 2010.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 NPRR to Clarify RUC Capacity Shortfall Ratio Share Formula.
CRR Model Building Process Bradley Bell CRR Engineer.
ERCOT, Market Analysis 2013 Annual Constraint Competitiveness Test (CCT) Study Results – Update for 8/27/12 CMWG 8/27/2012 ERCOT Public.
October 02, 2009 Austin, Texas Quick Start Task Force Meeting 1.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
GTBD Forecasting Using SCED to Produce Projections of Future LMPs Floyd J. Trefny February 17, 2011.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
ERCOT Monthly Operational Overview (July 2012) August 15, 2012.
February 5, 2008 TPTF 168 Hour Test Follow up discussion.
N ODAL P ROGRAM U PDATE TO C OPS Jim Galvin.
PDCWG Report to ROS Sydney Niemeyer Chair NRG Energy Don Blackburn Vice Chair Luminant Energy.
Temperature Assumptions for Dynamic Ratings in ERCOT CRR Auctions Proposal to differentiate between Day (PeakWD & PeakWE) and Night (Off-peak) October.
March 13, 2007 – Slide 1 ERCOT Nodal 101 COPS Market Guide Commercial Operations Market Guide Section 5 a. Overview of ERCOT ERCOT Overview Market Overview.
Stability Limit Management Chad Thompson Manager, Operations Support Planning Working Group Meeting ERCOT Public January 20, 2016.
MISUG Meeting Materials ERCOT 9/07/ MISUG Agenda 9/07/ Antitrust AdmonitionJ. Lavas9:30 a.m. 2.IntroductionJ. Lavas9:35 a.m. 3. Follow up.
1 Market Trials Update NATF May 4, 2010.
Scheduling and Operating Transmission Devices in the Nodal Environment.
Commercial Operations Subcommittee Meeting April 13, 2010 Update to RMS April 14, 2010.
Protocol Revision Subcommittee Rob Bevill January 5, 2012.
MISUG TAC Update Jackie Ashbaugh ERCOT 3/7/ TAC3/7/ /22/2011 Meeting Focus on the high priority items from MISUG: Review task list prioritization.
Cutover Update NATF 2 November Today’s Agenda Reminders Program Status 24 Hour LFC Test Update Cutover Update Soft Launch 2 November 2010NATF.
Nodal Readiness Plan Update Ron Hinsley Update for TAC November 3, 2005.
Ancillary Services Methodology Changes Bill Blevins Manager, Operations Planning.
August 2012 Wholesale Market Operations Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach Market Support and Analysis.
August 27, 2007 Executive Committee Meeting Texas Nodal Program Update Jerry Sullivan.
ERCOT Monthly Operational Overview (January 2015) ERCOT Public February 15, 2015.
TAC December 3, 2009 Meeting Update 1. TX Nodal Implementation 2 PhaseWhenScopeStatus 2.1: Market Connectivity MILESTONE COMPLETE Oct. 28MP interface.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee September 3, 2009.
2% Shift Factor dispatchable rule discussion and alternatives for the 2% rule Kris Dixit 1.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Retail Workshop ERCOT Nodal Update October 06, 2010.
WMS – Nodal Credit Integration Start Up May 19,
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
The Wholesale Market Subcommittee Update Prepared for the July 31st TAC meeting.
CRR Network Model One-Line Diagram Beth Garza TPTF April 22, 2008.
1Texas Nodal NATF Readiness Update Vikki Gates May 4, 2010.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
1 Market Trials Update NATF January 5, 2010.
Texas Congestion Management Work Group Update For WMS Marguerite Wagner, PSEG Texas.
Lead from the front Texas Nodal 1 Texas Nodal EDS4 - Approach 11/28/2007.
MISUG Meeting Materials ERCOT 7/26/ MISUG Agenda 1.Antitrust AdmonitionJ. Lavas9:30 a.m. 2.IntroductionsJ. Lavas9:30 a.m. 3.Market Data Transparency.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
The Texas Nodal Market Trip Doggett ERCOT Interim President and Chief Executive Officer Mike Cleary ERCOT Chief Technology Officer Executive Briefing 28.
August 11, 2008 TPTF EDS Sequence and Durations Discussion Daryl Cote.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
Market Trials Update NATF March 2,
Presentation transcript:

Wholesale Market Subcommittee April 12, 2012 ERCOT Dynamic Ratings Application

2 Background Transmission companies have the option to provide a table of ambient temperature-adjusted line ratings in the ERCOT Network Operations Model ERCOT systems utilize these tables, along with the Weather Forecast to generate ratings for Real-Time and future studies, including –Congestion Revenue Rights (CRR) –Day-Ahead Market (DAM) –Reliability Unit Commitment (RUC) –Real-Time (SCED) Note that not all transmission lines are, or have to be, dynamically rated

3 How Are Dynamic Ratings Implemented? CRR –Monthly Auction: Forecasted maximum on-peak temperature –Long-Term Auction Sequence: 10-Year historical on-peak average maximum temperature DAM/DRUC/Operational Studies –Weather Forecast HRUC –Real-Time ratings for first hour; Weather Forecast for future hours SCED –Real-Time temperatures (by Load Area), or –Telemetry (Amps, MVA, local temperature)

4 How Are Dynamic Ratings Implemented? How often do the ratings change? –Telemetry Can be updated in Real-Time Ratings can change with each State Estimator execution –Typically once every five minutes –Weather Forecast The Weather Forecast updates automatically every hour With every State Estimator execution, the Weather Forecast is queried to ensure the proper ratings are considered

5 Dynamic Rating Example