Comprehensive Update on Indian Trail Infrastructure Plan September 8, 2015.

Slides:



Advertisements
Similar presentations
County of Fairfax, Virginia Department of Transportation 1 Transportation Funding and Improving Roadway Services Delivery Transportation Advisory Commission.
Advertisements

Prince William County Government Prince William County Department of Transportation Road Program DATA June 23, 2010.
Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.
Bob Vasek Cooperative Agreements Engineer Mn/DOT Metro State Aid Overview and Planning and Programming Tom Leibli Cooperative Agreements Project Manager.
Downtown Access Improvements Plan Town of Hillsborough 2014.
Making Moore Connections Roxanne Leopper, MS FirstHealth of the Carolinas Community Health Services.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Titusville to Edgewater Bike Loop PD&E Study
Georgia DOT Local Maintenance Improvement Grant Program Todd Long, P.E., Deputy Commissioner.
State of Morrisville Mayor Mark Stohlman July 17, 2014.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Comparative Traffic Study Morrisville-Carpenter Road versus Crabtree Crossing Extension Presentation to: Morrisville Town Council Prepared by: Parsons.
Background Why Plan For Transportation? Facts You Should Know Expectations Projects and Costs Conclusions/ Next Steps.
OLD KINGS ROAD Special Assessment District. Overview History Phased Project Current Status.
Friends of the Fox River November 9, 2014 Longmeadow Parkway Fox River Bridge Corridor.
Sidewalk Strategic Plan City of Peterborough. About Peterborough  Pop. 75,000  Surrounding land is agricultural with Canadian Shield just to the north.
SAN PABLO DAM ROAD DOWNTOWN ULTIMATE STREETSCAPE.
Transportation Alternatives Program FY 2015 Proposed Projects for Funding in Northern Virginia Transportation Planning Board May 21, 2014 Sarah Crawford.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
NTTA Expansion Program ASCE January Luncheon Meeting Delivering Mobility Gerry Carrigan Assistant Executive Director of Project Delivery North Texas Tollway.
Georgia Transportation Infrastructure Bank (GTIB) Bert Brantley Deputy Executive Director State Road and Tollway Authority MAY 2013 STATE ROAD AND TOLLWAY.
Proposed State Highway Projects: Kendall County September 20, 2007 Region 2/District 3 Illinois Department of Transportation.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
DEPARTMENT OF TRANSPORTATION. Mission Statement Plan, Design, Construct, Operate and Maintain the roadway system under the jurisdiction of Lee County.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.
CITY OF MERIDIAN FY07 BUDGET HEARING Mayor – Tammy de Weerd Council President – Shaun Wardle Council Vice President – Joe Borton Council – Keith Bird Council.
Transportation Planning Organization(TPO) City Council Workshop November 12, 2013.
CITY COUNCIL GOALS & OBJECTIVES. TOP PRIORITY Street Valley Gutters 33 installed by Public Works 35 installed by contractor Pipe Replacement Program.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
Interstate 95 Corridor Improvement Program June 20, 2012.
INTRODUCTION THIS IS AN EXHIBITION OF THE “CAMBORNE POOL REDRUTH TRANSPORT STRATEGY STAGE 1” PLANNING CONSENTS WERE GRANTED IN NOVEMBER 2008 AND JANUARY.
Community Development Department Construction Phase.
Southern Bridge Project Brown County Executive
Phase 2: 30% Design Plans September 4 th, 2012.
Tom Norton, Executive Director Colorado Department of Transportation American Association of State Highway and Transportation Officials September 9, 2003.
Regional Transportation Committee (RTC) 10-Year Project Milestone Policy Transportation and Trinity River Project Committee October 26, 2015.
County of Fairfax, Virginia Department of Transportation VDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next Steps Board Transportation.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Transportation Projects City Council Workshop May 14, 2013.
JOHNSON STREET BRIDGE PROJECT COUNCIL WORKSHOP MAY 21, 2009.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2013/14 – 2017/18 Presentation to Board of County.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2015 – 2019 Presentation to Board of County.
HB 277 Regional Transportation Sales Tax Preliminary Project List Presentation Mayor and City Council Work Session March 1, 2011.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
April 26, 2016 PRESENTER: Doug Green, Vice President.
Chapel Hill Parks and Recreation. “Networks of natural spaces which provide corridors connecting areas such as neighborhoods, parks, and schools.
Public Works Capital Projects FY Projects Completed FY 2014.
Budget Workshop Capital Improvement Plan Presentation on Public Private Partnership and Strategy for Municipal Complex, HWY 50, and Coast to Coast Trail.
1 City Council Work Session September 24, 2012 State of Transportation in San Leandro.
Transportation Program (Infrastructure) Presentation Board of Aldermen Work Session February 29, 2012.
2009 Sales Tax Extension Project Status Update. 2 Background Sales Tax was extended via August 26, 2008 referendum. Sales Tax was extended for an additional.
Council for Quality Growth North Fulton Advisory Meeting
The Central Avenue Connector Trail
City Council Meeting November 7, 2016
Chapin Town Hall Meeting
June 5, 2017.
UTILITY DESIGN SERVICES
River to Sea TPO Meeting US 92/International Speedway Boulevard
Kerr Tar Project Update – June 2016
State of the Streets 2018 Presented by:
Maricopa County Transportation Improvement Program
Early Voting Starts Oct. 20 | Election Day Nov
September 25, 2018 District 5 SUN Trail Update
Southern Bridge Project Brown County Executive
Major Initiatives in Hampton Roads
Presentation transcript:

Comprehensive Update on Indian Trail Infrastructure Plan September 8, 2015

Transportation Background & History Town incorporated in 1907 Only known Town initiated transportation projects from 1907 to 2007: 1) Couple small resurfacing projects 2) Faith Church Rd Extension (State & Local Funding)

Transportation Background & History Town incorporated in Since 1990, population grew from 1,500 to approx 38,000. In 2007, Town had under 7 miles of Town maintained streets.

Transportation Background & History In 2010, the Town had no Public Works Department. Started and completed first large local street construction/maintenance contract. In 2011, started Public Works Department.

Transportation Background & History In 2010, the Town did very little street maintenance. In 2010, the Town did very little sidewalk maintenance. In 2010, no equipment to repair streets.

Transportation Background & History In 2011, Council started Pathways 2 Progress (P2P) initiative for traffic congestion. P2P is a 3/4 lane loop that surrounds the Town. In 2011, Town completed first widening partnership project to widen IT-Fairview Rd for future Bypass construction.

Transportation Background & History In 2011, Town passed first Transportation Bond package. In 2012, Town completed partnership project with NCDOT to widen Sun Valley intersection. In 2012, Town secures widening of Old Monroe Rd project for 2018 construction start.

Transportation Background & History In 2013, Town begins construction on first segment of Chestnut Parkway. In 2013, Town completes widening of Indian Trail- Matthews Rd. In 2013, constructs first new public street in Chestnut Park/Downtown area.

Transportation Background & History In 2013, Town begins construction on first segment of Chestnut Parkway. In 2013, Town completes widening of Indian Trail- Matthews Rd. In 2013, constructs first new public street in Chestnut Park/Downtown area.

Transportation Background & History In 2013/14, Town completed construction on approximately 2.5 miles of sidewalk. In 2015, Town maintains just under 60 miles of streets. In 2015, Town Council approves 3-Year Strategic Transportation Plan.

FY 15/16 Town Transportation Plan Chestnut Parkway Ph II (Gribble Rd-OMR) Design/Permit/ROW Chestnut Parkway Ph III (Gribble Rd-MIT Rd) Planning (NCDOT) Sardis Church Rd/UIT Rd (Intersection) Design/Apply for Grant IT Rd/Gribble Rd (Intersection) Design/ROW IT Rd/MIT Rd (Intersection) Design/ROW IT Rd Streetscape (Gribble Rd-MIT Rd) Design/Consultant/Public Process Sardis Church Rd Sidewalk (UIT Rd-Brittany Downs) Construction Rogers Rd Sidewalk (WCS Rd-Villas of Sun Valley) Construction Annual Street Maintenance (Town wide) Maintenance/Constn Annual Sidewalk Maintenance(Town wide) Maintenance/constn 11

FY 15/16 DOT Transportation Plan US-74 Intersection Improvements - Design/Construction US-74 Intersection Improvements – Streetscape Design Indian Trail Rd Bridge Replacement/Road Widening Construction Poplin Road Roundabout 12

FY 16/17 Town Transportation Plan Chestnut Parkway Ph II (Gribble Rd-OMR) Construction Chestnut Parkway Ph III (Gribble Rd-MIT Rd) Planning (NCDOT) Sardis Church Rd/UIT Rd (Intersection) Construction/Grant IT Rd/Gribble Rd (Intersection) Construction IT Rd/MIT Rd (Intersection) Construction IT Rd Streetscape (Gribble Rd-MIT Rd) Construction Annual Street Maintenance (Town wide) Maintenance/Constn Annual Sidewalk Maintenance(Town wide) Maintenance/constn 13

FY 16/17 Town Transportation Plan Chestnut Parkway Ph II (Gribble Rd-OMR) Construction Chestnut Parkway Ph III (Gribble Rd-MIT Rd) Planning (NCDOT) Sardis Church Rd/UIT Rd (Intersection) Construction/Grant IT Rd/Gribble Rd (Intersection) Construction IT Rd/MIT Rd (Intersection) Construction IT Rd Streetscape (Gribble Rd-MIT Rd) Construction Annual Street Maintenance (Town wide) Maintenance/Constn Annual Sidewalk Maintenance(Town wide) Maintenance/constn 14

Monroe Expressway Chestnut Pkwy Phase 1-3 Downtown Infrastructure Old Monroe Rd

Town Infrastructure Implementation These are projections that have not been approved by the Council. However, it sets up guidelines for future infrastructure development strategies. At the end of the presentation staff will ask Council to discuss option 1,2,3,4.

5 yr- P2P Loop Implementation 1)Complete and begin construction on sections 2 and 3 of Chestnut Parkway.  Town begin design and permitting in 2015 of section B.  Town begin construction on section B in  NCDOT funding 2020 for section C.  Discussing options with NCDOT to move forward project.

Monroe Expressway Chestnut Pkwy Phase 1-3 Downtown Infrastructure Old Monroe Rd

5 yr- P2P Loop Implementation 2) Begin construction on Old Monroe Road by  Currently, Old Monroe Rd project scheduled for  CRTTPO Rep has discussed option with NCDOT high level officials to advance this project and will either move forward entire project or allow Town begin construction and then reimburse the Town before  Town officials have continuously focused on this project.

Monroe Expressway Chestnut Pkwy Phase 1-3 Downtown Infrastructure Old Monroe Rd

5 yr- P2P Loop Implementation 3)Completion of Monroe Expressway and access roads and two Indian Trail interchanges before  Could relieve much of north side of Indian Trail traffic issues.  Substantial economic benefit to Indian Trail.

Monroe Expressway Chestnut Pkwy Phase 1-3 Downtown Infrastructure Old Monroe Rd

5 yr- P2P Loop Implementation 4 ) Widening Indian Trail Road to 3 lanes from Old Monroe Rd to US-74 before  Widening 3 lanes completed from OMR to IT Elementary (part of state bridge project)  Widening 3 lanes from Elementary to US-74. Combination of private, state, local, grants, and special districts before  Streetscape Gribble Rd to MIT Rd.  Union County infrastructure  Connection to South Fork Road  Future Intersection at Gribble & MIT

` Label Here

Monroe Expressway Chestnut Pkwy Phase 1-3 Downtown Infrastructure Old Monroe Rd

5 yr- P2P Loop Implementation 5) Widening Unionville-Indian Trail Road from Faith Church Rd in  Private sources pay for widening.

Monroe Expressway Chestnut Pkwy Phase 1-3 Downtown Infrastructure Old Monroe Rd

5 yr- P2P Loop Implementation 6) Construction of Faith Church Rd to Old Monroe Rd  Private development.

Monroe Expressway Chestnut Pkwy Phase 1-3 Downtown Infrastructure Old Monroe Rd

5 yr- P2P Loop Implementation 7) Roundabout at Rocky River Road:  Combination of private, state, local, and grant funding.  Strategic infrastructure development  Future development will enhance this road.  Completed 2016.

Monroe Expressway Chestnut Pkwy Phase 1-3 Downtown Infrastructure Old Monroe Rd

5 yr- P2P Loop Implementation 8) Intersection at Sardis Elementary School:  Combination of private, state, local, and grant funding.  Strategic infrastructure development  Future development will enhance this road.

Monroe Expressway Chestnut Pkwy Phase 1-3 Downtown Infrastructure Old Monroe Rd

5 yr- P2P Loop Implementation 9) Construction of new intersections at four intersections at US-74.  Construction to begin 2016.

Monroe Expressway Chestnut Pkwy Phase 1-3 Downtown Infrastructure Old Monroe Rd

5 yr- P2P Loop Implementation 10) Widening Rogers Road Intersection:  Completed before  Grant funding and state funding.

Monroe Expressway Chestnut Pkwy Phase 1-3 Downtown Infrastructure Old Monroe Rd

10 yr- P2P Loop Implementation 11) Widening of Sardis Church Road to 3 lanes:  Combination of private, state, local, and grant funding.  Strategic infrastructure development  Future development will enhance this road.

Monroe Expressway Chestnut Pkwy Phase 1-3 Downtown Infrastructure Old Monroe Rd

10 yr- P2P Loop Implementation 12) Widening of Younts Road to 3 lanes:  Combination of private, state, local, and grant funding.  Strategic infrastructure development  Future development will enhance this road.

Monroe Expressway Chestnut Pkwy Phase 1-3 Downtown Infrastructure Old Monroe Rd

Next Steps Council approval of having staff RFQ for a design, permitting, and ROW consultants for Chestnut Parkway? Council Discussion?

Next Steps Council approval of staff beginning RFQ process for consultant for Indian Trail Road widening and streetscape? Council Discussion?

Next Steps Council approval of staff beginning implementation process to develop cross Town Greenway System? Council Discussion?