Status of VIRGO Francesco Fidecaro (after Lisa Barsotti) - University and INFN Pisa – on behalf of the VIRGO collaboration Aspen - January 19 th, 2005.

Slides:



Advertisements
Similar presentations
19. October 2004 A. Freise Automatic Alignment using the Anderson Technique A. Freise European Gravitational Observatory Roma
Advertisements

Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration.
September 21, 2005Virgo Status – ESF Workshop1 Status of Virgo B. Mours.
Cascina, January 25th, Coupling of the IMC length noise into the recombined ITF output Raffaele Flaminio EGO and CNRS/IN2P3 Summary - Recombined.
Locking improvements after the end of VSR1 Gabriele Vajente for the Locking Group 14 th ILIAS WG1 meeting Cascina – March 6 th 2008.
1 Virgo commissioning status M.Barsuglia LAL Orsay.
F. Frasconi I.N.F.N. Pisa for the Virgo Collaboration TAUP2007 Sendai, September 11-15, 2007 VIRGO EXPERIMENT VIRGO: a large interferometer for Gravitational.
1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.
VSR1 summary - post VSR1 Commissioning plans E. Tournefier (LAPP-CNRS) LSC-Virgo meeting Oct 22 nd, 2007.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
Use ofSiesta in VIRGO commissioning Lisa Barsotti University of Pisa – INFN Pisa For the Virgo collaboration Caltech, December 19th 2003.
SIESTA for Virgo locking experience L. Barsotti University of Pisa – INFN Pisa on behalf of the Virgo Locking Group Cascina, March 16th 2004 Simulation.
COMMISSIONING PROGRESS G.LOSURDO – INFN Firenze for the Virgo Collaboration.
1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008.
Virgo Control Noise Reduction
Status of Virgo Gabriele Vajente INFN Pisa and Scuola Normale Superiore di Pisa On behalf of the Virgo Collaboration 11 th Gravitational Wave Data Analysis.
Interferometric detector for GW: status and perspectives Giovanni Losurdo INFN Firenze-Urbino
Joshua Smith December 2003 Detector Characterization of Dual-Recycled GEO600 Joshua Smith for the GEO600 team.
The GEO 600 Detector Andreas Freise for the GEO 600 Team Max-Planck-Institute for Gravitational Physics University of Hannover May 20, 2002.
Interferometer Control Matt Evans …talk mostly taken from…
March 17, 2008LSC-Virgo meeting1/12 Virgo Status B. Mours.
1 1.ISC scope and activities 2.Initial Virgo status 3.Design requirements 4.Reference solution and design status 5.Plans toward completion 6.Technical.
The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005.
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
1 Noise sources at high frequency in Virgo E. Tournefier (LAPP-CNRS) ILAS WG1 meeting, Hannover December 12 th,2005 Recycled ITF sensitivities Noise sources.
LIGO-G D Enhanced LIGO Kate Dooley University of Florida On behalf of the LIGO Scientific Collaboration SESAPS Nov. 1, 2008.
Paolo La Penna The New Virgo Injection BenchN5-WP1 4 TH MEETING, Hannover, 7/04/2005 The New VIRGO Injection Bench Paolo La Penna European Gravitational.
Gabriele Vajente ILIAS WG1 meeting - Perugia Couplings of angular noises into dark fringe Diffused light studies.
07. July 2004 Andreas Freise Status of VIRGO A. Freise For the Virgo Collaboration European Gravitational Observatory.
Environmental noise studies at VIRGO Environmental contributions to Virgo readout noise (C-runs) many sources identified through coherency analyses with.
04. November 2004 A. Freise A. Freise, M. Loupias Collaboration Meeting November 04, 2004 Alignment Status.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
Paolo La Penna Injection optics for Advanced VirgoLSC/VIRGO joint meeting, Cascina, 25/05/ Advanced VIRGO Input optics LIGO-G Z.
1 The Virgo noise budget Romain Gouaty For the Virgo collaboration GWADW 2006, Isola d’Elba.
Paolo La Penna ILIAS N5-WP1 meeting Noise analysis in Virgo Cascina, 7-8 July 2004 Analysis of noise in VIRGO.
Lisa Barsotti - University and INFN Pisa – on behalf of the Virgo Collaboration CASCINA - January 24 th, 2005 ILIAS  Locking of Full Virgo Status of VIRGO.
Status of VIRGO Lisa Barsotti - University and INFN Pisa – on behalf of the VIRGO collaboration ANNECY - December 15 th, 2004  Status of the Commissioning.
Nov 3, 2008 Detection System for AdV 1/8 Detection (DET) Subsystem for AdV  Main tasks and requirements for the subsystem  DC readout  Design for: the.
LIGO-G Z The Status of VIRGO E. Tournefier for the Virgo Collaboration GWADW 2004, Aspen From the CITF to VIRGO Commissioning of the Fabry-Perot.
Virgo+ Commissioning Status. Main upgrades and activities Laser system: from 10  25 watt output power at the IMC TCS: ring + Central Heating Electronics:
M. Mantovani, ILIAS Meeting 7 April 2005 Hannover Linear Alignment System for the VIRGO Interferometer M. Mantovani, A. Freise, J. Marque, G. Vajente.
The status of VIRGO Edwige Tournefier (LAPP-Annecy ) for the VIRGO Collaboration HEP2005, 21st- 27th July 2005 The VIRGO experiment and detection of.
Analysis of the Virgo runs sensitivities Raffaele Flaminio, Romain Gouaty, Edwige Tournefier Summary : - Introduction : goal of the study / Overview on.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
The VIRGO Suspensions Control System Alberto Gennai The VIRGO Collaboration.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
LIGO-G M LIGO Status Gary Sanders GWIC Meeting Perth July 2001.
Gabriele Vajente ILIAS WG1 meeting - Frascati Noise Analysis Tools at Virgo.
Status of Virgo GWDAW12 Status of Virgo GWDAW Dec Leone B. Bosi INFN and University of Perugia (Italy) On behalf of the Virgo Collaboration.
1 Locking in Virgo Matteo Barsuglia ILIAS, Cascina, July 7 th 2004.
Status of Virgo a short update Michele Punturo. A bit of History July 29 – August –C6 run Duty cycle: Locking 89%, Science Mode 86% September.
LIGO-G D Commissioning at Hanford Stan Whitcomb Program Advisory Committee 12 December 2000 LIGO Livingston Observatory.
Caltech, February 12th1 Virgo central interferometer: commissioning and engineering runs Matteo Barsuglia Laboratoire de l’Accelerateur Lineaire, Orsay.
1 DC readout for Virgo+? E. Tournefier WG1 meeting, Hannover January 23 rd,2007 DC vs AC readout: technical noises Output mode cleaner for DC readout.
Monica VarvellaIEEE - GW Workshop Roma, October 21, M.Varvella Virgo LAL Orsay / LIGO CalTech Time-domain model for AdvLIGO Interferometer Gravitational.
The VIRGO detection system
L’Interferometro Virgo Michele Punturo INFN Perugia a nome della Collaborazione Virgo.
MG 11 - Berlin Virgo status Marie-Anne Bizouard (LAL-Orsay) on behalf of the Virgo Collaboration.
1 The status of VIRGO E. Tournefier LAPP(Annecy)-IN2P3-CNRS Journées SF2A, Strasbourg 27 juin – 1er juillet 2005 The VIRGO experiment The commissioning.
Automation of the Lock Acquisition of the 3 km Arm Virgo Interferometer F. Carbognani for The Virgo Collaboration ICALEPCS - Geneva 14 October, 2005.
Interferometer configurations for Gravitational Wave Detectors
Present Status of the Virgo Experiment
Virgo Status Detector Status Computing Data Analysis status and Plans
Status of Virgo GWDAW Dec 13-16
GEO – VIRGO joint noise hunting project
Virgo – Injection SYStem
Virgo Update – LSC meeting
Squeezed Light Techniques for Gravitational Wave Detection
Status at the Prague meeting
Presentation transcript:

Status of VIRGO Francesco Fidecaro (after Lisa Barsotti) - University and INFN Pisa – on behalf of the VIRGO collaboration Aspen - January 19 th, 2005  Status of the Commissioning Activity LIGO-G Z

VIRGO Optical Scheme BS NI WI PR 3-km Fabry Perot cavities in the arms

Commissioning Plan Steps of increasing complexity: Oct 2003 – Feb 2004 Oct 2003 – Feb 2004 A SINGLE FABRY-PEROT CAVITY PR misaligned

Commissioning Plan Steps of increasing complexity: Oct 2003 – Feb 2004 Oct 2003 – Feb 2004 A SINGLE FABRY-PEROT CAVITY PR misaligned

Commissioning Plan Steps of increasing complexity: Oct 2003 – Feb 2004 Oct 2003 – Feb 2004 A SINGLE FABRY-PEROT CAVITY Feb 2004 – Dec 2004 Feb 2004 – Dec 2004 ITF in RECOMBINED MODE PR misaligned

Commissioning Plan Steps of increasing complexity: Oct 2003 – Feb 2004 Oct 2003 – Feb 2004 A SINGLE FABRY-PEROT CAVITY Feb 2004 – Dec 2004 Feb 2004 – Dec 2004 ITF in RECOMBINED MODE Sept 2004 Sept 2004 ITF in RECYCLED MODE  Final configuration PR aligned

Sensitivity Progress  From a single arm to the recombined mode C3: Automatic alignment and frequency servo tested in a single arm configuration C4: Automatic alignment and frequency servo tested in recombined configuration C1 – November 2003 C4 – June 2004

SSFS: OFF vs ON

Commissioning Run C4 - June 2004 ITF controlled with the reflected and the asymmetric beams Automatic alignment of the cavities Laser frequency stabilized to cavities common mode Cavities common mode locked to reference cavity Output Mode Cleaner locked on the dark fringe Tidal control on both arms  Recombined Data Taking Mode

Commissioning Run C4 - June 2004  5 days of run  Lock losses understood  Longest lock ~ 28 h  h reconstruction on line

Commissioning Run C4 : Noise Characterization Coupling of IB resonances into the michelson controller signal due to a mismatch between modulation frequency and input mode-cleaner length (~ 70 Hz) C4 After frequency modulation tuning Michelson controller signal Problem understood -> not final solution yet

Michelson control noise (I) B2 quad (C4) Input bench resonances (Feb 04) Due to input bench resonances

Michelson control noise (II) Input bench resonances + input bench local control noise Input bench vibrates Spurious signal on Spurious signal laser frequency on B2 quad stabilization Spurious signal in Michelson control Spurious signal on dark fringe

Input bench resonances - Driven by local control noise - Coherence between coil driver outputs and B2_ACq during C4 confirms this hypothesis - Better results when driving has been moved from the ground coils to the marionetta Coils - Large improvement still needed - The elimination of these resonance’s should be part of the input bench upgrade 26/06 C4: control from the ground coils 07/09 DT: control from the marionetta

After C4  July – August Upgrade of the terminal benches -> Re-tuning and improvement of the linear automatic alignment Suspension full hierarchical control started Commissioning of the Recycled ITF started Effect of the backscattered light in the IMC -> attenuator installed between the IMC and the ITF  Mid September: Re-Start  October – November: -> Recombined ITF locked with the full hierarchical control of the suspensions -> ITF locked in recycled mode

Suspension Hierarchical Control  10 3  Locking acquired and maintained acting at the level of the mirror z z x y marionette reference mass mirror  Reduce the strength of the mirror actuators by a few 10 3 to reach Virgo design sensitivity

Suspension Hierarchical Control DC-0.01 Hz Hz 8-50 Hz Corrections sent to the marionette Corrections sent to the mirror Force on the mirror reduced of a factor 20  Switch to low noise coil drivers TIDAL CONTROL RE-ALLOCATION OF THE FORCE

Suspension Hierarchical Control  Single arm locked with the hierarchical control for the first time in July -> controllability of the superattenuator demonstrated  Last main result: hierarchical control of the recombined ITF in the C4 configuration, with automatic alignment and frequency servo engaged  Stable lock -> tested in the last commissioning run (C5, 2-6 December 2004)  SUMMARY

Effect of light backscattered in the IMC Input laser beam ITF reflected beam Solution - Short term: insert attenuator between the IMC and the ITF - Mean term: insert Faraday isolator (input bench upgrade) Laser Frequency (Hz)

Attenuator between ITF and IMC Insert attenuator between the IMC and the ITF Change last mirror of the input telescope (R=100%  R=10%) First trial at the beginning of August: …bad mirror Second trial on September 9 th : OK Figura di Matteo Laser frequency (Hz) PR misalignedPR aligned

The Variable Finesse Locking Strategy “A recycled ITF with a low recycling factor is similar to a recombined ITF “ NINE WE WI BS PR Low Recycling Factor Half Fringe  Lock immediately the 4 degrees of freedom of the ITF on the half fringe:  end photodiodes to acquire the lock of the long cavities  simple michelson locked on the half fringe with the asymmetric DC signal  3f demodulated reflected signal to control the recycling cavity length

POWER IN THE RECYCLING CAVITY  With the ITF in a stable state, bring it adiabatically on the dark fringe evolving the control scheme Recombined interferometer (~ 60 mW) Recycled interferometer (~ 17 W) T PR=8% -> Recycling factor ~ 25  frequency servo (SSFS) engaged to control the common mode of the arms  from DC to demodulated signal to control the simple michelson length The Variable Finesse Locking Strategy

 First lock of the recycled ITF on the end of last October  Stable lock of the recycled interferometer ~ minutes  no linear automatic alignment yet  next step  Locking procedure tested several times  lock acquired in few minutes  New original lock acquisition procedure established, combining end photodiodes, frequency servo, 3f-demod signal, slightly misalignement of PR mirror, and lock on the half fringe  M. Evans (LIGO) and K. Arai (TAMA) present on Virgo site  1 day and half of test in the last commissioning run C5  SUMMARY

Commissioning Run C5 - December 2004 Best VIRGO Sensitivity  Injection of bursts and inspiral events during the run -> Analysis in progress 10 times more power than C5

Coupling to the environment Laser lab –Vibrations and drifts –Acoustic coupling –Pressure waves –Temperature Det lab and end benches –Vibrations and drifts –Temperature

C1 AC switches to “high power regime” from Monday thr Friday 8:00 – 18:00 RMS acoustic noise in laser lab. microphone Broadband acoustic noise in laser lab. Dark fringe “breaths” at 11. and 14. Hz Air Conditioning low/high cycle

IB tower pump: sweep 600Hz  400Hz VIRGO – C Hz Amplitude [Watts/sqrt(Hz)] 2 x 10^-7 1 x 10^-6 4 x 10^-8 8 x 10^-8 3 x 10^-9 2 x 10^-9 6 x 10^-9 2 x 10^-9 8 x 10^-10  fundamental and harmonics sweep coherently in dark fringe and seismometer Dark fringe photodiode Seismometer near IB tower 1 pump per SA tower (UHV < mbar in tower lower section) magnetically levitated, rotation speed 400 Hz or 600 Hz Turbo-molecular vacuum pumps: sweep test

 noise increase in dark fringe up to  10 times at [150, 1500] Hz  acoustic noise increase in laser lab. up to  50 times the standard noise floor at Hz Broadband white signal sent to a loudspeaker in laser laboratory, with 5 levels of increasing intensity Acoustic test during C4 run

LASER LAB. loudspeaker microphone Dark Fringe VIRGO C4: IMC North arm West arm Acoustic noise RC Injection SYS: - Laser clean room: laser, beam forming optics, photodiodes&piezos on non suspended benches, in air - Input Mode Cleaner: plane concave triangular FP, 144m, reference cavity, suspended, under vacuum - Alignement: laser on RC (<1Hz), IMC optical axis (<10Hz) Effects of acoustic noise: signals layout

 Misalignements of IMC ( a,  )  Power fluctuations of MC transmitted beam IMC rotation (  ) IMC translation ( a ) IMC trans. power ITF trans. power Dark Fringe LASER LAB. RC microphone Acoustic noise loudspeaker Effects of acoustic noise: signals layout

A look at coherences: Microphone vs. IMC (a,  ) IMC (a,  ) vs. IMC out Power IMC Out Power vs. Dark Fringe Microphone vs. Dark Fringe Microphone IMC a,  Fluctuations of IMC trasmitted Power Dark Fringe Dark Fringe vs. microphone is low  non linear path Jitter of laser beam is non compensated by IMC alignement control Misaligned MC gives power fluctuations of transmitted beam Power fluctuations converts into ITF readout noise Which path to dark fringe ?

Power noise contribution to Sensitivity :  S = displacement from the dark fringe S pn (t) =  S PP P 1) Naïve model:  S  S RMS C4 sensitivity ( S ) during acoustic noise injection Power noise estimate (  S) (Naïve model ) Power noise estimate (  S) (more accurate model) PP P = relative power fluctuations S(t) = sensitivity [m] 2) More accurate model  S  low freq. part (<50Hz) of S Power noise propagation model

Data Analysis Activity  h reconstruction (F. Marion - LAPP )  Physics group activity: Burst (P. Hello - LAL ) Coalescent Binary (A. Vicerè – INFN Urbino) Pulsar Source Software (S. Frasca – Roma University ) Stochastic Background (G. Cella – INFN Pisa) Noise Analysis (J. Y. Vinet – NICE)  Network analysis

Conclusions  Well advanced status of the commissioning activity -> Suspension hierarchical control in recombined mode -> Lock of the recycled ITF  Next steps: -> Linear automatic alignment of the recycled ITF -> Frequency servo optimization  Last Commissioning Run Data -> analysis in progress