Operational Experience Metrics Task Team August 7, 2009.

Slides:



Advertisements
Similar presentations
Accident Investigation vs. First Report of Injury.
Advertisements

Elements of an Effective Safety and Health Program
Quality Management System Corrective and Preventive Actions Argenis Osorio – Manager, Quality Assurance 19 September 2013 FACULTY MANAGEMENT.
Safety Committee Orientation Environmental Energy Technologies Division November 18, 2011.
OSHA’s Voluntary Protection Program (VPP) Job Hazard Analysis Mishap reporting 1 This class is only intended to familiarize you with the programs in place.
OSHA Injury Reporting.
A A A N C N U I N F O R M A T I O N T E C H N O L O G Y : IT OPERATIONS 1 Problem Management Jim Heronime, Manager, ITSM Program Tanya Friehauf-Dungca,
BUSINESS PROCESS IMPROVEMENT INITIATIVES Chad Cleveland June 18, 2014 BAAF Meeting.
Developing GIS for Scottish Canals
Idaho National Engineering and Environmental Laboratory EFCOG – Feedback & Improvement Subgroup Extent of Conditions Extent of conditions (EOC) are generally.
Determining the True Root Cause(s) of Accidents and Safety Incidents Incident Investigation and Analysis.
Medical Equipment. Safe Medical Devices Act (SMDA) Hospitals must report to the FDA an event, when it is suspected that a defective product and/or malfunctioning.
1 FIMS Data Validation Improvements And Lessons Learned Phil Dalby, PE, LEED AP Office of Engineering and Construction Management Facilities and Infrastructure.
Safety and Health Programs
Occupational Health and Safety Program Management Based on OSHA’s Four Point Workplace Safety Program Management Guidelines.
Safety and Health Programs
Monitoring Contractor Performance – Maintenance Services Aldo Gangi Manager Maintenance & Minor Works 11 th July 2013.
Welcome to College of Engineering February 2015 Health and Safety Briefing.
Presented by: Insert Name Safety Management Consultant
Safety & Health Programs.
© 2012 ISACA. All Rights Reserved. Topic Leader Training 2012.
Establishing an Effective Maintenance Program The Mechanics Need Your Help.
Unit #4 Establishing Committee Expectations – Safety & Health Programs 1.
1 CMBG 2009 PSEG Nuclear Vendor Technical Document Program Deficiencies, Successes, and Cost Savings Presented By: Paul Davis PSEG Nuclear, Engineering.
Safety and Health Programs 1. Benefits of Effective Safety and Health Programs Reduce work related injuries and illnesses Improve morale and productivity.
Wood shredder | Fall 2012 Eric Champagne, Horticultural Supervisor Building Services, Grounds and Event support, University services Building Services,
OSHAX.org - The Unofficial Guide To the OSHA1. Benefits of Effective Safety and Health Programs Reduce work related injuries and illnesses Improve morale.
ISM at the Savannah River Site Department of Energy Best Practices Workshop Lesson Learned Program Bill Luce, Manager Regulatory Services Washington Savannah.
Chinook’s Edge School Division No. 73 General Safety Orientation.
Cultivating a Safety Culture within a Creative Environment Frances Alston Manager, Environmental, Safety & Waste Management.
SacProNet An Overview of Project Management Techniques.
Brookhaven National Laboratory Lessons Learned (LL)Program.
This PowerPoint has been produced for the public and is made available for non-commercial use (e.g. toolbox meetings,
“Safety Self-Inspection of the Workplace – An Integral Element of Integrated Safety Management” Prepared by: M. E. “Rick” Du Bose Mgr, Safety & Occupational.
Y-12 Lessons Learned Program Methods & Strategies DOE 2010 ISM Champions Workshop Operating Experience Program September 14, 2010 Susan Gilliam.
Introduction Research indicates benefits to companies who establish effective worker safety and health programs: –Reduction in the extent and severity.
1 RMS Training RMS BASICS April Before you start RMS Six basic steps to success: 1.Establish offices (enter descriptions of offices) 2.Enter staff.
Material Handling Events Performance Analysis Group June 30, 2014.
Integrating EM QA Performance Metrics with Performance Analysis Processes August 26, 2009 Robert Hinds, Manager, Quality Assurance Engineering & Greg Peterson,
Ensuring Effective Communication Across the Enterprise Created by David R. Barnes Jr. National Director, Student Support Services.
ISM WORKSHOP April 24-27, 2006 Albuquerque, NM Feedback and Improvement Assessment Results and Path Forward Michael N. Worley Office of Nuclear Energy.
Fast Read Employee Experience (FREE) Teresa Cochran Operational Experience/Lessons Learned Program Manager UT-Battelle, LLC / Oak Ridge National Laboratory.
MTA New York City Transit 2011 Safety Initiatives Transit Riders Council Meeting December 22, 2011.
Legal Holds Department of State Division of Records Management Kevin Callaghan, Director.
Cho Nai Cheung Accidental Release Prevention Engineer, Supervisor Hazardous Materials Programs June 14 th, 2012.
Monitoring the Long-Term Effectiveness of Integrated Safety Management System (ISMS) Implementation Through Use of a Performance Dash Board Process Mike.
User Training Renewed focus on the issue of user safety and training Recent instances have highlighted the need for Users to have job specific safety training.
Operational Awareness Program at ORNL DOE ISM Conference Feedback and Improvement Becky Webb August 27, 2009.
0 Software Quality Assurance Implementation Plan Briefing to the Board June 20, 2003.
DEVELOPMENT OF UNIFORM CONTRACTING AND PROCUREMENT POLICIES  Procurement Reform Task Force Recommendation #7  Approach  Key Initiatives  “Go Forward”
Click to edit Master title 1 1 Raymond W. Blowitski, Office of Analysis, HS-32 Phone: (301) Strategy for Implementing DOE O 210.2, DOE Corporate.
Retrofitting and Maintenance. Regular Maintenance is Necessary Failure to Perform Maintenance Leads to….. Diminished Performance Deterioration Failure.
ACCIDENT / INCIDENT REPORTING (Employee Version).
- 1 - FINAL_NOScript_JDVerificationTraining pptx Job Titles Examples Used for HISD Nonexempt Jobs Assistant: Using knowledge of a functional area(s),
IIPP An Overview of the Injury and Illness Prevention Program.
BUS OPERATOR WORKSTATION PROCUREMENT PROCESS ORGANIZATIONAL GUIDANCE TOOL 1 Version: February 19, 2016 TCRP Report 185.
1 CMBG 2009 Planning for Obsolescence June 27, 2009 John Parler South Carolina Electric & Gas.
1 OPEXSHARE Implementing and Effective Operating Experience Program DOE OEC Workshop October 29, 2015 Las Vegas, NV.
- HEMIC Facility Inspections. Common Losses A fire breaks out in a 16 story office building An employee had the tips of two fingers amputated Could these.
1 Implementation Strategies Gail Jernigan Westinghouse Savannah River Company
Version 1.0, May 2015 BASIC PROFESSIONAL TRAINING COURSE Module X Operational safety including operational feedback Case studies This material was prepared.
Root Cause Analysis Roger Brauninger
Fix it or Forget it? Dealing with Troubled Projects
Elements of an Effective Safety and Health Program
Elements of an Effective Safety and Health Program
Trending Requirements and Results
BASIC PROFESSIONAL TRAINING COURSE Module X Operational safety including operational feedback Case studies Version 1.0, May 2015 This material.
Creating a Corporate Safety Program
Presentation transcript:

Operational Experience Metrics Task Team August 7, 2009

2U.S. Department of Energy Operational Experience Metrics Task Team Goals: Identify key performance indicators (metrics) that can demonstrate effectiveness of Operating Experience/ Lessons Learned Programs Determine what organizational culture approaches might assist in establishing a “learning” organization. Determine usefulness across sites

3U.S. Department of Energy Recommended Metrics Effectiv e OE Program Feedback/ Utilization TimelinessLL Searches Preventable Events OE/LL Origins Success Stories/ Continuous Improvements

4U.S. Department of Energy Level of utilization of the OE/LL Program UsersLL viewed Staff feedback SurveysComments Feedback / Utilization

5U.S. Department of Energy Feedback / Utilization (cont.)

6U.S. Department of Energy Feedback / Utilization (cont.)

7U.S. Department of Energy Feedback / Utilization (cont.)

8U.S. Department of Energy Feedback / Utilization (cont.)

9U.S. Department of Energy. OE/LL incorporated into a work process or research with documented evidence of continuous improvements. Success Stories / Continuous Improvements

10U.S. Department of Energy SANDIA DAILY NEWS for Tuesday, June 9, 2009 ES&H Lesson Learned applied: The Sandia ES&H Lessons Learned program really works. The Lessons Learned program recently sent a notice on a lesson learned concerning a severe employee injury potential related to a truck hydraulic lift-gate “pinch point.” After reviewing the lessons learned, the ES&H Safety Engineering organization forwarded it to Jane Doe (Fleet services), who took immediate action. Fleet Services notified all Sandia users of trucks with lift gates and asked that they be brought in for immediate inspection and repair. To date, Fleet Services has found this issue on two lift gates. The brackets were removed, which eliminated the pinch points making these lift gates safer to use.lesson learned

11U.S. Department of Energy January 2009 An ORNL Heavy Equipment Maintenance Supervisor reviews a Brookhaven National Lab LL titled “Inspect E-Ride Vehicles for Maintenance Defects” and immediately contacts the manufacturer. Both the supervisor, procurement, and LL Coordinator work in tangent to identify all E-ride vehicles on the ORNL campus. The Supervisor contacts all ORNL vehicle owners and schedules in-house maintenance to correct the defect. All four vehicles repaired by February Success Story

12U.S. Department of Energy Success Story / Continuous Improvements BJC has successfully shared Operating Experiences and Lessons Learned with the DOE Complex for over a decade. In the past 8 years, BJC has annually contributed an average of 25% of the lessons in the DOE LL Program.

13U.S. Department of Energy Lessons Learned and Operational Experiences

14U.S. Department of Energy Origins OE/LL sources including significant day-to-day operating experiences

15U.S. Department of Energy Operating Experience “Origins”

16U.S. Department of Energy Operating Experience “Origins”

17U.S. Department of Energy Timeliness LL feedback received within a site specific time period LL from internal events issued within site specific time period Subject Matter Expert (SME) review of LL or external events for applicability LL corrective actions completed timely

18U.S. Department of Energy SME Feedback Timeliness

19U.S. Department of Energy Preventable Events Occurrence Reports Lessons Learned Trending Corrective Action Tracking

20U.S. Department of Energy Lesson Learned Searches LL Coordinator Searches LL Webpage Hits

21U.S. Department of Energy Learning Organizations Overall Program Performance

22U.S. Department of Energy Lessons Learned Effectiveness Performance Indicators

23U.S. Department of Energy Questions