Compositing Assays To The Chosen Bench Height ©2007 Dr. B.C. Paul {Note – The Name MineSight® and the Program described are property of Mintec Inc – Tucson,

Slides:



Advertisements
Similar presentations
EZ Grade Pro Becky Koss French & Spanish Teacher Lake-Lehman Sr. High School.
Advertisements

Computer terms you should know at the end of Kindergarten,
Introduction to Formatting VistaPHw Charts Brought to you by: The Vista Partnership February 2007.
Mouse Tutorial for Win XP In this tutorial you will learn to: Move the mouse Click and double click Make selections Manage windows Use menus Click the.
Running MSOPIT for Assignment #6 These Slides are Base on MS3D version 4.6 which was current in Sept. of 2009 Note – These slides contain concepts also.
Log into the portal and go to the Web Advisor Menu at the bottom right.
Sequencing Mining Operations with MineSight® ©2007 Dr. B. C. Paul {Note – The Name MineSight® and the Program described are property of Mintec Inc – Tucson,
DEVELOPING ICT SKILLS PART -TWO
®® Microsoft Windows 7 for Power Users Tutorial 2 Customizing Microsoft Windows 7.
An Example of Drawing Hard Rock Room and Pillar in MineSight ©2012 Dr. B. C. Paul Note – The screen shots in these slides come from the program MineSight.
Qualtrics Survey Kenyon A Beginner’s Guide.
An Introduction to MS Reserve
Dealing With Surfaces in MineSight ©2012 Dr. B. C. Paul Note – This presentation contains many screenshots from the program MineSight by Mintec. Credit.
This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation. All.
Using the File Manager WebCT 6. Understanding File Manager The File Manager is the area where all course files are stored. Whenever you link a file in.
Pumps for Slurry © 2012 Dr. B. C. Paul Note – These slide illustrate a solution approach using Sysel, a program developed by GIW and contain screen shots.
Inventory Throughout this slide show there will be hyperlinks (highlighted in blue) follow the hyperlinks to navigate to the specified Topic or Figure.
 When you receive a new you will be shown a highlighted in yellow box where your can be found  To open your new just double click.
{ Etiquette Handbook. Feature Creating an Font, colour and sizes etc Sending an Sending using Cc Sending using Bcc Creating a signature.
Conversational Computers
USSF North Carolina Arbiter Referee Assignment Site An Introduction & Guide for Use by Referees © Copyright June 2005 by Paul James, all rights reserved.
Graphing with Excel: Graphing Made Easy Mac 2008 Version.
GAME:IT Junior Bouncing Ball Objectives: Create Sprites Create Sounds Create Objects Create Room Program simple game.
Introduction to VBA. This is not Introduction to Excel We’re going to assume you have a basic level of familiarity with Excel If you don’t, or you need.
System Resources INFO1119 (Fall 2012).
Quick Start Guide: Filters Advanced Learn about: 1.What filters are and their functionality 2.How to create a filter using Samples, Equipment & Labels.
GPS Surveying ©2010 Dr. B. C. Paul Note – The techniques shown in these slides are considered common knowledge to surveyors. Figures in the slides may.
Working with Numbers in Alice - Converting to integers and to strings - Rounding numbers. - Truncating Numbers Samantha Huerta under the direction of Professor.
Adding Roads and Benches To A Pit Design ©2007 Dr. B. C. Paul {Note – The Name MineSight® and the Program described are property of Mintec Inc – Tucson,
by Chris Brown under Prof. Susan Rodger Duke University June 2012
Using Statistical Interpolation to Build Block Models – Part I (Introduction to MineSight® and importing and creating surfaces) Using MineSight® ©2007.
Computer Aided Design of an Open Pit ©2007 Dr. B. C. Paul.
Sequencing Mining Operations with MineSight®
Introduction to the WebBoard Terry Dennis. The WebBoard - Our Connection The WebBoard URL is
OPL MRR Viewer Tutorial David Stark North Carolina State University 31 Jan 2008.
CARLSON SOFTWARE CONFERENCE DANIEL V. SYPERSMA VICTOR GRAPHICS.
CREATE A NEW PROJECT Click on the NEW icon. Click on OK.
Obtaining Information From the Geologic Block Model
Using Statistical Interpolation to Build Block Models – Part III (Using Pintrp.dat to project sample values to blocks) Using MineSight® ©2007 Dr. B. C.
Downloading and Installing Autodesk Revit 2016
Lecture 10 Design of Rough Draft Stage Pits ©2010 Dr. B. C. Paul Note – These Slides contain numerous screen shots from the program MineSight® developed.
 When you receive a new you will be shown a highlighted in yellow box where your can be found  To open your new just double click.
Your First Lab (No its not a variety of Dog) ©Jan 2008 Dr. B. C. Paul The ideas and techniques given in these slides are considered common knowledge to.
Game Maker – Getting Started What is Game Maker?.
Make a Great Map of Your Engineering Building Traverse ©Mar Dr. B. C. Paul Note – This presentation contains screen shots from the Mine Sight and.
Using Statistical Interpolation to Build Block Models – Part II (Setting up Files and Coding Air Blocks) Using MineSight® ©2007 Dr. B. C. Paul revisions.
Fall 2003Sylnovie Merchant, Ph.D. ACCESS Tutorial Note: The purpose of this tutorial is to provide an introduction to some of the functions of ACCESS in.
Entering Your Traverse Data In MineSight ©Feb 2009 Dr. B. C. Paul Note – the following presentation includes screen shots an operating suggestions for.
Links take you to…  Different slides in your presentation  A different PowerPoint presentation  Any program - (Word can be used for example to complete.
CPS-Student Response System Dottie Betts ITRT June 2009.
OPAC OPAC stands for: Online Public Access Catalog Look for this icon in the Students folder. Double-click on it to open.
Pit Reserves and Resources in a GSM ©2012 Dr. B. C. Paul This presentation involves the program MineSight created by Mintec and contains screen shots taken.
Starting Up MineSight for Your Coal Mine Project.
Slopes in MSOPT Calculations ©2012 Dr B. C. Paul Note – These Slides are based on and include screen shots from the program MineSight by Mintec. Credit.
COMPUTER PROGRAMMING I 3.01 Apply Controls Associated With Visual Studio Form.
screen shots Emma Jarman. Adding attachments What is an attachment? An attachment is an that has a file attached to it. The file could be.
COMPUTER PROGRAMMING I 3.01 Apply Controls Associated With Visual Studio Form.
The 2007 Class Project ©2007 Dr. B. C. Paul. The 2007 Project A copper/moly porphyry deposit located near Eureka Utah –Ie (hard rock deposit) Deposit.
This is what we want to produce Import sketch dimensions Label angles Set the scale Add linear dimensions.
Today We Will Review: Operating Systems (Windows) (week 3 & 4) Starting up MS Windows Desktop and its contents Functions of the desktop components Brain.
INTRO to PIXLR.com.
Weebly Elements, Continued
Chapter 1: An Introduction to Visual Basic 2015
Single Sample Registration
Using Statistical Interpolation to Build Block Models – Part I (Introduction to MineSight® and importing and creating surfaces) Using MineSight® ©2007.
3.01 Apply Controls Associated With Visual Studio Form
3.01 Apply Controls Associated With Visual Studio Form
Tips and tools for managing the new interface
The Smarter Balanced Assessment Consortium
Navigating NEIU Blackboard 417 – 418a
Presentation transcript:

Compositing Assays To The Chosen Bench Height ©2007 Dr. B.C. Paul {Note – The Name MineSight® and the Program described are property of Mintec Inc – Tucson, Arizona}

Where Does This All Fit With Raw Assay Data and Topography we represent our deposit as a series of blocks We use Interpolation Techniques to Predict Block Grades and Properties from Drill Hole Data A Model that gives average geologic properties for blocks of earth is a geologic block model

What Will We Do With It We use our economic data to assign a $ value to each block of ground We then have a computer routine dig us the biggest set of blocks that makes us the largest profit  This set of blocks is our ultimate pit  For planning purposes we will decide how to expand the pit out to those limits

What Do We Have We have a digital representation of our surface We have a file that contains all our core hole assays and their locations

What Will We Do First? We need to composite our drill hole assays over our bench heights  Typical open pit techniques have little ability to selectively mine over a bench height  Need our interpolatable data in a similar form to what we will need (ie our geologic block model) A File 9 stores drill holes that have been composited to the height of our mining bench – We will create that File 9

Go to the MineSight Heading and Left Click to Pull Down the Menu Left click on Compass

We Will Go to MineSight® Compass to Create a Sample Composites File Left click the projects Tab Left Click on Project File Editor Icon (the opening yellow Folder)

Under File / New I Will Pick a File 9 which is an unsorted composite file

Add Our Grade Storage Request Purple Fields show Reference items that Minesight will include By default. To these I want to add Cu and Mo (Note it is also important To set the minimum And maximum range A precision of the data We will composite)

Now Save It To The Project File

Send it to Eurk9.dat (Or what ever else you name it – 4 characters the number 9 and a.dat)

Our Program Proclaims Its Success

A Quick Check of the Files Confirms it is There!

Now We Have Created a File we will put something in it with a compositing routine On the menu tab we Will ask it to show us Compositing programs We will look down the List and pick bench compositing

It Asks About Areas to Composite (I can default on most things cause I want to composite everything) Click the forward Arrow to move on

It Needs to Know What Grades to Composite I can use pull Down menus And pick off What I want (obviously Cu and Mo in This case)

Enter and Tell it to Move On I did tell it to put Its reports in an Rpt file (which is What it did with Other reports)

Get a Page of Compositing Options That don’t apply to me right now Move on

Gives Me a Compositing Options Screen The default is by Bench height but Using bench Height for the Composite interval Only works for Vertical holes (has a bunch of Options for handling Non-vertical holes) Since our holes are all vertical we will default and move on

Asks if we want to use any special weighting system for our assay averages (the default is to just weight by length of the sample) That’s good for us (since we have no special weight differences)

If it Finds Anything that Seemed Irregular it will warn you so you can look at the reports

Lets Admire Our Drill Hole Data (Ok your probably dying to know what kinds of grades you have) We will start by Creating a drill hole View Go to File to pull down A menu Select new to pop out A side menu Select Drillhole View A menu with one Choice pops out Take it

It Wants You To Give It A Name

It Needs a File to Tell it What Area to Draw a Picture Of (The natural choice is to pick the project control file that has our view limits)

Now I Get A Choice of Project Control Files (of which I only have one) Note that it is very Handy to know what Kind of data is stored In different file types a file 10 is a project Control file

I Can Choose Either to Look at My Original Assay File or My Composite File A file 9 is a composite A file 11 is an assay (the selection is Made by left clicking The appropriate Radio button)

You Need to Left Click on the Assay and Survey Files to Use Once selected They will turn Blue and the Ok button Turns dark – Meaning it can Be selected (when its grayed Out it is not Selectable) Selected ok

It Wants to Know Where to Get It’s Coordinates The Survey File Seems a fine choice To me. Left Click Ok to Move on.

It Wants to Know If I Want to Limit What Can be Displayed You can make Things run more Lean+mean by Keeping down Which variables Can be displayed But this also limits Choices. I’m going to pick No.

It Wants Me to Select the Holes to Display I do believe I will pick An All option

Lets Load Them Up to View After making my Selection I will Direct it to load The holes I will then ok or Apply the Selection.

Now I Can See My Drill Holes!! I’d be even more Excited if I could See more than Gray lines.

Lets Enhance that Ugly Gray Display On the drillhole View properties Click Cut-off This brings up Some ranges I Can set color Graphics for.

Lets Put in Our Cut-Off Grades Start at the top and Type in the top of each Grade range Use the down arrow On your keyboard to Move down to the next I used 0 to 0.15 waste.15 to.31 Leach.31 to.9 Regular Mill.9 to 5.2 High Grade

Now Highlight Our Grade Range Click on Properties

Now Pick “Set Color by Range” We are going to pick separate colors for each grade interval

Set it to go from Blue for Low Grade to Red for High

Note We Now See Each Grade of Ore With A Separate Color We can Explore Around in Our view to See what The drillholes Have. (We could also Use our Procedures To label holes And grades)