V5 p.1 Consultation Period Offshore Electricity Transmission – milestones (1) Apr - JuneJuly - SeptOct - DecJan - Mar KEY: 2006/7 Initial Framework Oct/Nov.

Slides:



Advertisements
Similar presentations
RIIO – ED1 timetable Robert Friel Regulatory Strategy and
Advertisements

Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
DEC JAN FEB MAR APR MAY JUNE JULY AUG SEP OCT NOV DEC JAN 2006 Antenna Design updating Antenna Detailed Design PPDR K.O. PPDR Data Pack. Reflector Panels.
A regulatory framework for gas quality treatment facilities: recap and update.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Text CCWG – Enhance ICANN Accountability CCWG – Enhancing ICANN Accountability Project Timeline December 2014.
KEY CONSULTATIONS an overview Louise Masters InnogyOne, Innogy UK Offshore Wind 2003.
BWEA OFFSHORE CONFERENCE 17 – 18 APRIL 2002 Offshore Consents Planning for the Future Nigel Peace Director, Energy Regulation Department of Trade & Industry.
State Milestones Subsidized Insurance Workgroup High Level Timeline 2011 Jan 2011 Feb 2011 Mar 2011 Apr 2011 May 2011 Jun 2011 Jul 2011 Aug 2011 Sept 2011.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003.
LCC -Proposal for Next Steps August 28, Discussion Points Recap of Whitepaper Recommendations Critical milestones and activities driving LCC activities.
15 January 2010 energynetworks.org 1 PRESENTED BY SIMON BROOKE Revised DCMF Terms of Reference Distribution Charging Methodology Forum.
CREATION OF AN OFFSHORE GRID INFRASTRUCTURE Presentation to BWEA Offshore Wind Conference, 4 March 2004 Richard Mellish, DTI.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 05 Mar 2012 Doc: Source: ETSI.
OTEG Adoption group 2 August Agenda 1.Adoption group 2.Importance of issue 3.Issues to be advanced 4.Alternative Solutions 5.Process 6.TO perspectives.
Northern Lincolnshire Healthy Lives Healthy Futures Programme NEL CCG Partnership Board Update September 2014.
Initial view on changes to Codes OTEG, 3 rd July 2006.
Requirement Development Feb 11Mar 11Apr 11May 11Jun 11Jul 11Aug11Sep 11Oct 11Nov 11Dec 11 [30/04/11] URS Sign-Off [29/07/11] Design Sign-Off 2011 [27/04/12]
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
MINISTRY OF FINANCE, PLANNING AND ECONOMIC DEVELOPMENT August 2015 Budget Process Consolidating intergovernmental transfers to local government 1.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
Regulation of Lobbying Act 2015: Presentation to members of the media Sherry Perreault Head of Lobbying Regulation Standards in Public Office Commission.
Energy Networks Association RIIO-ED1 Update for Suppliers December 2012.
CEQA and the Delta Plan Presentation to Delta Stewardship Council February 24, 2011.
Doc.: IEEE /1394r0 Submission November 2008 Jose Puthenkulam (Intel)Slide 1 Summary of m Development Process Date: Authors:
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 14 Mar 2012 Doc: Source: [ETSI]
Gas SO Incentives For 1 April 09 Transmission Workstream 3 July 2008.
Initial Thoughts on Timeline for Entry Capacity Substitution Draft for discussion purposes only.
Design and buildTestShadowGo live Oct 15Nov 15Dec 15Jan 16Feb 16Mar 16Apr 16May 16Jun 16Jul 16Aug 16Sep 16Oct 16Nov 16Dec 16Jan 17Feb 17Mar 17Apr 17 Oct.
European Developments Transmission Workgroup 3 rd May 2012.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Exit Capacity User Commitment – Transmission Workstream update
PROGRAM CONSULTATIVE FORUM Meeting pack
Transmission Planning Code
Transmission Workgroup 4th October 2012
PARCA Timeline Transmission Workgroup 4th July 2013 Rhys Ashman.
Update on European Network Codes
Eagle Programme : 4 Box Summary

How To Use 1 Delete the lines and text you don’t need 2
SOCIAL DIALOGUE TIMELINE
Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16
NTS Entry Charging Review Update
Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – OPEN LETTER Review Group August th November 2010.
Exit Capacity Substitution and Revision
DSC ChMC CSS update 6th July 2018
Capacity Methodologies Review 2019
Transmission Planning Code Review
PARCA Timeline.
Draft Mod: Update of default System Marginal Prices
Revised Tender Timescale for DN Interruption Arrangements
EU Developments.
Gas Customer Forum DN Interruption Update - Introduction
Mark Freeman 29th January 2007
Omnibus IV Contract Overview Elieen Emond Contract Specialist
Generic Revenue Driver Methodology
Transmission Workstream DN Interruption Update - Introduction
Open Letter - Summary of Responses
Drafting Group: Final Meeting Drafting Group: 1st Meeting

Modification 0043 – Limitation on offering for sale unsold capacity
Revised Tender Timescale for DN Interruption Arrangements
Code change proposals completed – Sep 16
EACH HOME COUNTS IMPLEMENTATION MILESTONES
Group of Experts on Population and Housing Censuses
How To Use 1 Delete the lines and text you don’t need 2
Proposed core price & service spec L1 product milestone 31 Dec 2019
Presentation transcript:

v5 p.1 Consultation Period Offshore Electricity Transmission – milestones (1) Apr - JuneJuly - SeptOct - DecJan - Mar KEY: 2006/7 Initial Framework Oct/Nov Geographic scope Workstream Technical standards Project Management Allocation method Codes Licences Plan May Develop principles Assess options Prepare discussion papers OTEG ToR Apr Assess options Prepare Exec papers Draft Initial Framework Authority sign-off Prepare discussion papers Prepare Exec papers Draft Initial Framework Authority sign-off Review Responses Prep Exec Papers Draft Conclusions Authority sign-off Response Period Develop principles Prepare tender spec Price Control Regime Update Milestone Workstream ActivityOTEG / Board Mth Steering C’tee S/C Draft for discussion Open Sep GBSO Open Letter Jun Consult Period Conclusions: Detailed model & price control principles Jan/Feb

v5 p.2 Review Responses Prep Exec Papers Draft Proposals Authority sign-off Consultation Period Offshore Electricity Transmission – milestones (2) Apr - JunJuly - SeptOct - DecJan - Mar KEY: 2007/8 Geographic scope Workstream Technical standards Project Management Allocation method Codes Licences Draft Legislative Texts July Expressions of Interest 3-month DTI Consultation Period Enact Energy Act powers Review responses Prepare Exec papers Draft Final Consultation Exec sign-off Auth sign-off Consultation Period Detailed Framework Apr Price Control Regime Bid preparationInitial Tender Period Milestone Workstream ActivityOTEG / Board Mth Steering C’tee S/C Final Framework Published Dec Draft for discussion Detailed Price Control Design

v5 p.3 Price Control rates of return agreed Offshore Electricity Transmission – milestones (3) Apr - JuneJuly - SeptOct - DecJan - Mar KEY: 2008/9 Geographic scope Workstream Technical standards Project Management Allocation method Codes Licences Review Sept Licence Mods Licence Granted July Price Control Regime Tender Award July Final tender negotiations Regulatory regime in operation Ofgem Milestone Workstream ActivityOTEG / Board Mth Steering C’tee S/C Draft for discussion