Electric wireline logging

Slides:



Advertisements
Similar presentations
SPE Getting the Most out of Networked Drillstring Petersen, Sui, Frøyen, Nybø Center for Integrated Operations in the Petroleum Industry & SINTEF.
Advertisements

MDT JOB PLANNING AND INTERPRETATION
Broadband Networked Drill String Unlocks Operational Performance Potential by Transmitting Downhole Measurements in Real Time Authors: Daan Veeningen,
PETE 411 Well Drilling Lesson 17 Casing Design.
Permanent Head Gasket & Block Repair w/Nanotechnology, 32 Fl Oz
The first total drilling fluid in a single sack..
Innovations in drilling DAP 2015
© Blue Graphics Concept Sauer-Danfoss START-UP PROCEDURE PROPEL PUMP Instruction Sauer-Danfoss Belgium – T. Van Mossevelde.
Lesson 20 Abnormal Pressure
Lesson 14 Jet Bit Nozzle Size Selection
Well logging course for fourth year
Should Horizontal Wellbores be Logged? An analytical approach to hydraulic fracturing entry positioning and completion equipment selection.
PETE 411 Well Drilling Lesson 5 Hole Problems.
ATMATM PETE 406 UBD ATMATM ATMATMATMATM PETE Underbalanced Drilling, UBD Lesson 9 Benefits of Underbalanced Drilling UDM - Chapter 3.
Inflatable DST Equipment An Overview Presentation.
INFLATABLE DST EQUIPMENT
Integrated Drilling and Logging Program Approach in HPHT Environment: Successful Drilling of Deepwater Oberan Field, Nigeria, ENI Deepest Well in Deep.
RIG PROCESSES  Drilling, Coring, Directional Drilling & Survey.  Tripping, Wash & Ream, Fishing.  E- Logging.  Casing & Cementing.  Perforating &Testing.
INNOVATIONS IN DRILLING DAP 2015 MAARTEN MIDDELBURG FEBRUARY 25, 2015 DELFT.
Rock Coring Obtain undisturbed samples of solid, fractured, or weathered rock formations.
Lesson 4 Drilling Cost & Drilling Rate
Enhanced Oil Recovery using Computerized Hydraulic Lift Systems
Lesson 25 Well Control, cont’d
SPD Cooling workshop: PLC item details. ups upgrade: 10-12' after trigger 24V - what to do in 10 minutes Present situation: In case of “normal power”
ABS(Antilock braking system)
+ -. Methode Connector  This is the standard USGS connection for the DCP.  Some manufacturers do not recommend using a methode connector. However, we.
It’s About Time Sanjaya Sood May, Initials Key Industry Drivers The Emergence of Three Main Trends Introduction of new enabling technology, bringing.
Lecture items - Logging Up? - Wireline Log Services. - What Logs can measure? - The role of the Well Log Analyst - Creating the Well Log “Logging Operation”
Optimum Performance in Dual Gas-Lift Wells ASME/API/ISO Spring 2004 Gas-Lift Workshop February 10-11, 2004.
Well Design PE 413.
Economic benefits from using formate brines - Latest paper.
Unconventional Rod Nelson Schlumberger IPAA 75 th Annual Meeting Oct 28, 2004.
Drilling Operations History Drake’s Well was the first commercial oil well drilled in 1859 in Pennsylvania. Cable Tool Drilling technique was used to drill.
John N. Dougherty, PG Lisa Campbell, PG EPA Region 2, New York City
NFSI Super System Our Mission Is to provide our customers the best new technologies and select existing technologies with honesty and integrity. NFSI.
Silicate/Polymer Mud System
Dual Gradient Drilling Basic Technology
Petroleum Engineering 406 Lesson 4 Well Control. Read Well Control Manual –Chapter 9 Homework 2 Due Feb. 3, 1999.
First Sildril-K trial in Russia. Background. Region:Western Siberia, Russia Oil field:Samotlor Operator:TNK-Nizhnevartovsk Drilling contractor:NBN Drilling.
Downhole Drilling PRODUCTS Bio-Stable Drilling Fluid Fuel Maximizer.
1 Overview Preamble Status pre-abandonment
MUD LOGGING DEFINITION, THEORY & LAG CALCULATIONS
SHELL Well Summary Garn Central North. Cuttings samples: Norske Shell well 3/7 - 6.
Lecture items - Compositions of the Uphole- Downhole Instruments. - Field Operation (Data Acquisition, Processing and Transmission) - Log Runs - Borehole.
Typical modern down-hole wireline equipment
Purpose Probe construction Field and laboratory measurements Data processing, applicational example Conclusions, outlook A NEW METHOD TO DETERMINE in.
Modern Slickline Perforating Applications in the North Sea
2015 International Petroleum Environmental Conference
Kick Submited to :- Submitted by:- Er Akash Rana Devahish Yadav B.Tech IIIrd Year Petroleum Technology 1.
Bacha Khan University Charsadda
Challenges of Borehole Communication in Oil Wells
Experiment #1: Centrifugal Pumps Alberto J.Pérez #79737.
Petrophysical evaluation of the Rotliegend in K15-FB-107
The BioTector B7000i TOC analyzer with integrated oxygen concentrator
Applications of wireline geophysics
Drilling & Measurements (D&M)
LubeWatch® Oil Analysis Program
Cementing How it is Done
OBJECTIVES Describe the operation of a pressure-differential switch and a brake fluid level sensor switch. Describe the operation of a residual check valve.
Oil-Based Mud Contamination in Gas-Condensate Samples
ADVANTAGE BRIDGE/FRAC PLUG S
Tasks Collecting samples. Which PVT lab tests to use.
QC checks on composition
Presented by: Richard Hathcoat & Alexander Millan
Petrophysical evaluation of Rotliegend Formation in K15-FA-104A
How Well is Your Well? UIC Class I Well Construction Standards
Coal Bed Methane Cementing Best Practices
QC checks on composition
Fluid samples from gas condensate wells are needed for two main reasons: To provide PVT data for developing a fluid model such as an EOS and/or black-oil.
QC checks on composition
Presentation transcript:

Electric wireline logging 8 The master plan Lessons learnt It is possible to avoid MDT tool plugging in silicate muds – a good flushing procedure needs to be used. CMR tools have a higher risk of diff sticking than MDT's (Schlumberger experience). Overbalance confirmed as 72 bar with the Rogn depleted to 0.98 sg. Silicates are excellent for logging due to negligible invasion, very low diff sticking risk and long open hole times. Can be used when invasion/unstable hole causes problems in getting good logs or cores MDT pump times should be based on data from similar reservoir/mud systems (e.g. can use shorter pump times in this situation) Do not need to run existing fluid analysers (LFA/OFA) for WBM/water sampling. Commercial considerations should be involved in decisions for the logging programme (e.g. SLB recommend filling all possible sample bottles... 2 for each depth, but only one ea was used). The log witness should be aware of these issues. Experienced ex-logging engineer consultant log witness very valuable. Toolstrings Three runs planned (PEX – minimum success criterion, MDT, CMR). Run in decreasing order of value & increasing order of sticking risk. Perceived high diff sticking risk Detailed decision tree for contingency formulated. Fusible weak point run for max possible pull. (note CaCO3 added to mud prior to drilling reservoir) Risk of MDT tool plugging due to silicate precipitation Experimental flushing procedure used involving surface and downhole flushing with water filled bottles. PEX MDT flow diagram CMR Run in OFA mode… and not used at all For internal flushing Note entire tool eccentralised against borehole… including stationary times when tuning or taking MRF stations Points to ponder Excessive pumping time for MDT? Time for MDT was about 4 hr each… even though resistivity logs showed practically NO invasion into reservoir. Water samples in WBM meant no clear parameter could be used to differentiate the two – pump time chosen was a “safe” value. Sensors to distinguish water samples in WBM are under development (based e.g. on pH) Until then, time will depend qualitatively on data value, level of invasion & mobility Replace PEX run with LWD? If the quad combo is run on LWD, the PEX run may be eliminated (sonic run on CMR run). Depth correct with wireline GR. Advantages – reduce risk in case not able to run wireline, less chance of sticking sources, eliminate one wireline run. Huge upside if only quad data reqd & wireline can be eliminated entirely. Issues – resolution of LWD, “software incompatibilities” with LWD and Shell software. Downtime report… Unable to pass 1130 m on first run with logging string #1. Wiper tripped… see 8 ½" section. Schlumberger QAQC of cables Separate failures on three successive cables sent out! 1. Short circuit; 2. Corroded – not checked before sending; 3. Short circuit (had to cut off length). If the 8 ½" section had been drilled in the normal time, this would have caused substantial down time. See logging AAR minutes for further actions from Schlumberger re better tracking of cables Hung up at 1130 m first run in the hole. After wiper trip, ran logs as per plan (wireline TD 1802 m). EMS caliper did not close after up log across reservoir. Used down log as repeat. Took 12 pressure readings & 3 sample depths (2 bottles each). Pump time 4 + 4 + 2.5 hr. No overpulls after sampling. No sample contamination at all. Overbalance confirmed as 72 bar, Rogn depleted to 0.98 sg. Performed bound volume and full polarisation passes. Took 4 MRF station points (using faster CMR "Plus") No indications of diff sticking.