Understanding Facilities & Administrative (F&A) Costs.

Slides:



Advertisements
Similar presentations
Indirect Costs CALS RESEARCH DIVISION April 24, 2008 Website: Meredith Luschen,
Advertisements

Rules Governing Sponsored Projects (aka OMB Circulars) Presented by Beverly Blakeney, Diane Cummings and Julie Macy.
OMB Circular A-21 General Overview – F&A OSP Brown Bag Norm Hebert, Director December 8, 2005.
Research Administration 101 Beth Ridenour Office of the Comptroller Facilities & Administrative Cost Rate Proposal.
The University of Texas at Arlington Office of Research and Office of Accounting and Business Services Brown Bag Training Session Two: Indirect Costs.
JULY12, 2011 SESSION 7 OF AAPLS – BUDGETING FOR PROPOSALS WITH SUBCONTRACTS: ESTABLISHING RELATIONSHIPS APPLICANTS & ADMINISTRATORS PREAWARD LUNCHEON SERIES.
KUMC Research Institute How to Think Through a Grant Budget Sponsored Programs Administration (SPA) Presented by.
Monthly Reconciliation. Why do we need to reconcile? NIH policy requires it: see Grants Policy Statement on financial management standards (section IIA,
Presented by Ginger Baker Eileen Campbell. Cost Principles for Educational Institutions found in 2 CFR Part 220  The Federal Government guidelines for.
Grants and Contracts Changes, Changes, and more Changes... What would this University be without Changes? Heather L. Paulsen.
The University of Texas at Arlington Office of Research and Office of Accounting and Business Services Brown Bag Training Session Three: The 1,2,3’s of.
Facilities and Administrative Costs (Indirect or Overhead) Michael J. Warnock, Ph.D. Director, Office of Sponsored Program Administration.
Facilities and Administrative Rates- What does this really mean? Louis Guin, Manager, Bearing Point Anne Feuerborn, Manager, Arizona State University April.
OFFICE OF SPONSORED PROGRAMS Sponsored Program Activity Types -and related eGC1 changes Presented by: OSP June 2015 MRAM.
Facilities & Administrative Cost Space Survey. Agenda  Discuss why a sponsored program space survey is required.  Terminology and Examples of Facilities.
Overview of Rate Calculation TWO COST GROUPS: DIRECT COSTS INDIRECT COSTS FACILITIES ADMINISTRATION.
Facilities & Administrative Costs and Sponsored Programs at Chico State March 27, 2012.
INDIRECT COSTS Aka: General Operating Funds, Administrative Overhead, F&A (Facilities and Administrative), Overhead Costs.
If the funder provides specific guidelines related to format or contents of your budget… FOLLOW THEM! Otherwise, your proposal may not make it out of.
Presented by the Office of Research Development & Services and Sponsored Programs Administration.
9/25/2013. AGENDA  Introduction & General Overview  F&A Definition and Category Application  Application of F&A Cost Rates  The Distribution Basis.
Budgets & Financial Management. Financial Management 2 Two components: – Demonstrating overall Viability, Capability, and Accountability (VCA) – Showing.
1 Facilities and Administrative (Indirect) Costs at The Ohio State University Administrative Research Council April 15, 2008 Tom Ewing, Associate University.
“Grants Boot Camp” Workshop Series January 9, 2014 Creighton University Sponsored Programs Administration 2500 California Plaza, Omaha, NE  Phone:
Enhancements to FSR Reconciliation Process New Award Reconciliation & Review Tool (ARRT)
Post-Award UCLA Department of Medicine Office of Research Administration.
1 Sponsored Programs AdditionalReviewSteps. 2 Sponsored Program Section Content How to Identify a Sponsored Program Types of Costs Review Budget to Actual.
Sponsored Programs Services (SPS) PROPOSALS. What is the PI’s role in the proposal?  Contact the central pre-award center,
Cost Sharing on Contracts and Grants October 16, 2001.
Cost Principles provide guidance for determining eligible costs and whether those costs are direct or indirect. Outlined in detail in OMB Circular A-21.
Cost Policy Training Sponsored Project Training Program April 30, 2012 Beverly Blakeney & Jennifer Gagnon April 30, 2012Sponsored Project Training Program1.
Understanding F&A Costs Facilities and Administrative Costs 1 Revised April 2015.
Proposal Budget Building Part II of II CALS Research Division Julene Gaspard Meredith Luschen Becky Bound September 16, 2008 Website:
 The Facilities and Administrative Rate (F&A Rate) is the mechanism used to reimburse the University for the infrastructure support costs associated.
EAST CAROLINA UNIVERSITY OFFICE OF GRANTS AND CONTRACTS Updated 11/24/2010 FACILITIES AND ADMINISTRATION COSTS (F&A, INDIRECT, OVERHEAD.
Grant Budgets: Calculating F&A May 21, What is F&A? Facilities and Administrative Costs – aka indirect costs. F&A covers institutional costs that.
Application of On-Campus and Off-Campus F&A Rates – Policy Change July RARA July 21, 2015 July RARA July 21, 2015.
Budgets & Financial Management. Financial Management 2 Two components: – Demonstrating overall Viability, Capability, and Accountability (VCA) – Showing.
Office of Sponsored Programs All rights reserved GTRC Budgets & submitting your proposal –To give an overview of the guidelines and fundamentals of a proposal.
DGA Community Meeting March 13, DGA Community Meeting: Agenda March 13, 2012 Agenda ItemDiscussion Leader Welcome and IntroductionsMoira Kiltie.
UCLA Department of Medicine Office of Research Administration.
Alex Galea Assistant Director ORA Review. Grant Instructions: RFA or PA Read through the guidelines carefully Make notes on specifications in the announcement,
Prepared by the Office of Grants and Contracts1 The Basics of Grants Administration.
Universal Budget Spreadsheet Kimberly Fahey Senior Grants and Contracts Specialist Sponsored Programs Office 1.
Kuali Financial Systems – Financial Administrator Development Series - October, 2006 Indirect Cost Facilities and Administrative (F&A) Costs.
Slide 1 FastFacts Feature Presentation November 19, 2015 To dial in, use this phone number and participant code… Phone number: Participant.
Indirect Cost Accounting: Principles and Policies The California Institute for Climate Solutions Public Workshop on UC’s Proposal December 12, 2007 Arthur.
Indirect Cost Rates 101 CNCS Uniform Guidance § Indirect Costs.
“SPEAR” W ORKSHOP P RESENTED BY : J OSIE C AUSSEAUX B UDGET D EVELOPMENT.
1 February 23, 2015 Teresa A. Costantinidis Budget and Resource Management UCSF Facilities & Administration Presentation.
What’s MTDC Mean To Me? Alexia Lewis Office of Research & Sponsored Programs September, 2006.
Office of Sponsored Programs All rights reserved GTRC Budgeting, Budget Justification, & Templates Jonathon Jeffries Grants & Contracts Accounting Candice.
12/11/20071 Indirect Cost Study Facilities and Administrative (F&A) Costs Indiana University Sally Link Cost Accounting Manager Financial Management Services.
Understanding Facilities and Administration Charges in NIH Grants
Budget Development Sponsored Programs Administration
Building A Budget Jenn Garye, Office of the VP for Research
Understanding Facilities & Administrative (F&A) Costs
Budget Development “SPEAR” Workshop.
Project Budgeting.
Understanding Facilities & Administrative (F&A) Costs
Introduction to Indirect Costs
Sponsored Programs at Penn
F&A Rate Practices, Concepts and Calculations
Overview of a typical grant budget
Introduction to Indirect Costs Claiming Your “Fair Share”
Overview of a typical grant budget
Participant Support Costs
Project Budgeting.
Budgets.
Introduction to Indirect Costs
Presentation transcript:

Understanding Facilities & Administrative (F&A) Costs

What is F&A? Direct Cost: Any cost that can be specifically identified with a particular project, program, or activity or that can be directly assigned to such activities relatively easily and with a high degree of accuracy. F&A Costs: Costs for common or joint objectives that cannot be readily identified with an individual project, program, or organizational activity.

F&A Costs – Otherwise Know As… Overhead Costs Indirect Costs At UCLA – Sub Code 9H

Modified Total Direct Cost (MTDC) MTDC component is the base against which the federally negotiated rates are applied, and is derived by excluding certain costs from the Direct Cost total. MTDC exclusions include: –Equipment –Patient Care –Alterations/Renovations –Space Rental –Tuition Remission/Fees –For Non-UC subawards, any amount beyond the first $25,000 TC of each subaward. –The total cost (TC) of subawards to other UC campuses

F&A Fun Facts Most non-federal F&A rates are based on Total Direct Cost (TDC), not MTDC. –e.g. Pharm sponsored Clinical Trials (26% TDC), Non-profit Foundations, etc. What is the “Current F&A Base Code”? –How do I find it? Summary-By-Sub/Overhead Rate field –What do the letters mean (i.e. J, B, C)? Base & Object code Table for Indirect costs COP/Approp&Financial tab Annual Indirect Cost Return –What is it based on?

UCLA’s Current F&A Rates On Campus - 54% MTDC Off Campus – 26% MTDC Instruction (on campus) – 37% MTDC Clinical Trials – 26% TDC Federal Teaching – 8% MTDC –NIH Training Grants and Ks

Why Does F&A Need to be Reconciled? Unbudgeted changes can occur: –PI spent the $ on an item that is excluded from F&A, but was not originally budgeted. EXAMPLE: Unbudgeted equipment. See Scenario 1 –PI did NOT spend the $ allocated to an excluded item, but rather, spent it on an item NOT excluded from F&A. Example: Budgeted equipment. See Scenario 2 –F&A rate changed during the project period, but may not have been changed in the UCLA financial system. Use F&A Reconciliation Tool –PI moved from on-campus to off-campus space, or vice- versa. Use F&A Reconciliation Tool –Item was not correctly Object Coded in the UCLA financial system. Use F&A Reconciliation Tool

F&A Tools Two F&A tools available: 1)FPM/QDB F&A Reconciliation Tool This report is also run automatically in the Smart Closeout Tool 2)9H Reconciliation Adjustment note located at the bottom of the FPM/QDB Summary By Sub Report Run both reports frequently throughout the life of the award. Do NOT assume the reports are correct. Do some research to determine WHY, before making any adjustments.