Time-Cost Trade-Off (Time Reduction = Time Compression) (Time Shortening) Time-Cost Trade-Off (Time Reduction = Time Compression) (Time Shortening)

Slides:



Advertisements
Similar presentations
WOOD 492 MODELLING FOR DECISION SUPPORT
Advertisements

Spring 2008, King Saud University Time-Cost-Trade-off Dr. Khalid Al-Gahtani 1 Reasons to Reduce Project Durations: 1.To realize incentive pay 2.To fit.
OPSM 301 Operations Management Class 27: Project Management: project crashing Koç University Zeynep Aksin
1 Project Planning BA Project Planning and Control Definition of Project Management Work Breakdown Structure Critical Path Scheduling Ideal Completion.
© 2006 Prentice Hall, Inc.3 – 1 Operations Management Chapter 3 – Project Management Chapter 3 – Project Management © 2006 Prentice Hall, Inc. PowerPoint.
Network Analysis and Duration Estimating Kathy S. Schwaig.
إدارة المشروعات Projects Management
18-1Project Management Chapter 18 Project Management.
Project Scheduling: Networks, Duration estimation, and Critical Path.
6. Project Management.
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 15 Supplement Advanced Methods for Project Scheduling McGraw-Hill/Irwin.
Chapter 9: Reducing Project Duration
Reducing Project Duration
SCHEDULE COMPRESSION In real practice – how would you compress your Schedule?
Chapter 7 Networks and Scheduling Project Management for Business, Engineering, and Technology.
Reducing Project Duration: Project Crashing
Reducing Project Duration
■ Project duration can be reduced by assigning more resources to project activities. ■ However, doing this increases project cost. ■ Decision is based.
Scheduling & Resource Planning CTC-415. Schedule Compression Used to decrease schedule time –At what price? Does cost of compression outweigh liquidated.
Time-Cost Trade-Off (Time Reduction = Time Compression = Time Shortening) 4/17/ :55 AM.
OPER 576 Project Management Reducing Project Duration or Project Crashing Greg Magnan, Ph.D. May 20, 2004.
Analyzing Cost-Time Trade-Offs There are always cost-time trade-offs in project management. – You can completing a project early by hiring more workers.
Construction Scheduling and Estimating.  Someone gets an IDEA  The IDEA inspires a PLAN to be created  The PLAN is used to build the SCHEDULE  The.
MANAGING PROJECT RESOURCES
MANA 705 DL © Sistema Universitario Ana G. Méndez, All rights reserved. W6 6.2 Operation Management Operation Management Managing Projects Techniques.
ECCS5209 Project Planning & Control Faculty of Applied Engineering and Urban Planning Civil Engineering Department Example 2 nd Semester 2010/2011 Eng:
MANAGING PROJECT RESOURCES
Time/Cost Trade-off Analysis
3 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall  Complex and temporary task of many related activities. (not ‘business as usual’)  May.
Chapter 9: Reducing Project Duration
Presented by: Meysam rahimi
Project Management - CPM/PERT
3 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry Render.
Reducing Project Duration CHAPTER NINE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Reducing Project Duration CHAPTER NINE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
CPM – Critical Path Method Can normal task times be reduced? Is there an increase in direct costs? Additional manpower Additional machines Overtime, etc…
Lags in Precedence Relationships
Strategic Project Management1SPM PERT/CPM Technical Issues - Part 2 PERT/CPM Technical Issues zPERT & CPM Technical Issues: yResource Loading & Leveling.
1 6. T IME -C OST O PTIMIZATION Objective: The optimization of project duration and cost by an appropriate crashing of activities. Summary: 6.1 Finding.
 Delay in project implementation invariably results in cost- overrun.  Delayed project implementation means delay in getting return on investments made.
PLANNING ENGINEERING AND PROJECT MANAGEMENT
ENGM 631 Optimization Ch. 10: PERT/CPM. Great Pyriamid of Cheops (2,500 B.C.) 42,300,000 Stone Blocks 440 Stories 4Accuracy of 0.04 inch 413 acres level.
TOPIC-6- TIME-COST TRADE OFF
Chapter 7 Schedule Control. 22 Learning Objectives  Perform the steps in the project control process  Determine the effects of actual schedule performance.
Fundamentals of Project Control Chapter 11 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project.
Project Planning & Scheduling What is a “project”? Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time Networks.
3/18/ :47 AM 1 Time-Cost Trade-Off (Time Reduction = Time Compression = Time Shortening)
CONSTRUCTION MANAGEMENT AND ADMINISTRATION UNIT - III.
Chapter 8 - Project Management1 Lecture 2 Today’s lecture covers the followings: 1.To study “project crashing” concept 2.LP formulation for project management.
Time-Cost Trade-off Models
PERT / CPM – Time-Cost Tradeoffs BSAD 30 Dave Novak Source: Anderson et al., 2015 Quantitative Methods for Business 13 th edition – some slides are directly.
Project Management 6e..
Reducing Project Duration
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
TOPIC-8B- PROJECT COST CONTROL
Project Planning & Scheduling
Class 27: Project Management Part II
Reducing Project Duration
Project Planning & Scheduling
Magister Sistem Informasi Universitas Komputer Indonesia
PROJECT MANAGEMENT WITH CPM/PERT.
Probabilistic Time Estimates
ENM448-Project Planning and Management
Lecture 6: Time-Cost Trade-Offs
CONSTRUCTION MANAGEMENT AND ADMINISTRATION
Reducing Project Duration
Where We Are Now. Where We Are Now Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity.
Where We Are Now. Where We Are Now Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity.
Where We Are Now. Where We Are Now Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity.
Presentation transcript:

Time-Cost Trade-Off (Time Reduction = Time Compression) (Time Shortening) Time-Cost Trade-Off (Time Reduction = Time Compression) (Time Shortening)

Reasons to Reduce Project Durations: Shortening the duration is called project crashing  To avoid late penalties (or avoid damaging the company’s relationship),  To realize incentive pay, (monetary incentives for timely or early competition of a project,  To beat the competition to the market, to fit within the contractually required time (influences Bid price)  To free resources for use on other projects. (complete a project early & move on to another project)  To reduce the indirect costs associated with running the project.  To complete a project when weather conditions make it less expensive (Avoid temporary Heating, avoid completing site work during raining season).  Many things make crashing a way of life on some projects (i.e. last minutes changes in client specification, without permission to extend the project deadline by an appropriate increment)

Methods to reduce durations 1.Overtime: Have the existing crew work overtime. This increase the labor costs due to increase pay rate and decrease productivity. 2.Hiring and/or Subcontracting: a)Bring in additional workers to enlarge crew size. This increases labor costs due to overcrowding and poor learning curve. b)Add subcontracted labor to the activity. This almost always increases the cost of an activity unless the subcontracted labor is for more efficient. 3.Use of advanced technology: Use better/more advanced equipment. This will usually increase costs due to rental and transport fees. If labor costs (per unit) are reduced, this could reduce costs.

How project cost is estimated? Practices to Estimate the Project cost  Some company assigns Overhead office as % of direct cost.  Most companies don’t consider profit as a cost of the job.  Cost analysis are completed by using: o [Direct costs + Indirect costs + Company overhead] vs. Budgeted (estimated costs).  Similar to each activity, the project as a whole has an ideal (Lease expensive) Duration.

How project cost is estimated?

How project is crashed? Specify 2 activity times and 2 costs o 1 st time/cost combination (D, C D )- called normal [Normal – usual ‘average’ time, resources] o 2 nd time/cost combination (d, C d )- called Crash [expedite by applying additional resources]

Steps in Project Crashing 1.Compute the crash cost per time period. If crash costs are linear over time: 2.Using current activity times, find the critical path and identify the critical activities Basic Steps

Steps in Project Crashing 3.If there is only one critical path, then select the activity on this critical path that (a) can still be crashed, and (b) has the smallest crash cost per period. If there is more than one critical path, then select one activity from each critical path such that (a) each selected activity can still be crashed, and (b) the total crash cost of all selected activities is the smallest. Note that the same activity may be common to more than one critical path. 4.Update all activity times. If the desired due date has been reached, stop. If not, return to Step 2.

Example1: Crashing The Project Critical Path for Milwaukee Paper (A, C, E, G, H) Start 0 A 2 B 3 C 2 F 3 D 4 E 4 G 5 H

Example1: Crashing The Project Table 3.16 (Frome Heizer/Render; Operation Management) CALCULATION OF CRAH COST/PERIOD Crash and Normal Times and Costs for Activity B ||| 123Time (Weeks) $34,000 — $33,000 — $32,000 — $31,000 — $30,000 — — Activity Cost Crash Normal Crash Time, dNormal Time, D Crash Cost, C d Normal Cost, C D Crash Cost/Wk = Crash Cost – Normal Cost Normal Time – Crash Time = $34,000 – $30,000 3 – 1 = = $2,000/Wk $4,000 2 Wks

Example1: Crashing The Project Time (Wks)Cost ($) Crash CostCritical ActivityNormalCrashNormalCrashPer Wk ($)Path? A2122,00022,750750Yes B3130,00034,0002,000No C2126,00027,0001,000Yes D4248,00049,0001,000No E4256,00058,0001,000Yes F3230,00030,500500No G5280,00084,5001,500Yes H2116,00019,0003,000Yes Table 3.5 (Frome Heizer/Render; Operation Management)

Example2: Crashing Project (123) ActivityPrecedence NormalCrash Time, dayCost, $Time, dayCost, $ A B CA DA EB,C FC GE31503 HD,F Σ For the small project shown in the table, it is required reduce the project duration. A)Reduce by 2 periods. B)Reduce by 5 periods.

Example2: Crashing Project (123) 1- develop network A 4 C 6 B 8 E 4 G 3 F 5 H 7 START FINISH D 9 ActivityPrecedence NormalCrash Time, dayCost, $Time, dayCost, $ A B CA DA EB,C FC GE31503 HD,F Σ

Example2: Crashing Project (123) A C B E G F H START FINISH D ActivityABCDEFGH Total float Free float  Project completion time = 22 working days  Critical Path: A, C, F, H. 2- calculate times, find critical path

Example2: Crashing Project (123) ActivityPrecedence NormalCrash Time, dayCost, $Time, dayCost, $ A B CA DA EB,C FC GE31503 HD,F Σ Cost Slope, $/day ** 150 Remarks 1- [G can not expedite] 2- lowest slope and can be expedited on critical path is activity (C) WITH 2 periods 3- calculate cost slope

Example2: Crashing Project (123) A C B E G F H START FINISH D ActivityABCDEFGH Total float Free float  Project completion time = 20 working days  Critical Path: A, C, F, H. & A, D, H Reduce 2 periods of activity (C) with increase of cost (2*50) =100 ActivityPrecedence NormalCrashCost Slope, Time, dayCost, $Time, dayCost, $$/day A B CA DA EB,C FC GE31503 ** HD,F Σ ESLS EFTFLF Activity Crash limit cost)

Example2: Crashing Project (123) A C B E G F H START FINISH D ActivityABCDEFGH Total float Free float  Project completion time = 19 working days  Critical Path: A, C, F, H. & A, D, H Reduce 1 period of activity (A) with increase of cost =70 ActivityPrecedence NormalCrashCost Slope, Time, dayCost, $Time, dayCost, $$/day A B CA DA EB,C FC GE31503 ** HD,F Σ

Example2: Crashing Project (123) ActivityABCDEFGH Total float Free float  Project completion time = 19 working days  Critical Path: A, C, F, H. & A, D, H Reduce farther 1 period of 2 activities (D,F) with increase of cost (30+90) =120 ActivityPrecedence NormalCrashCost Slope, Time, dayCost, $Time, dayCost, $$/day A B CA DA EB,C FC GE31503 ** HD,F Σ A C B E G F H START FINISH D

Example2: Crashing Project (123) ActivityABCDEFGH Total float Free float  Project completion time = 19 working days  Critical Path: A, C, F, H. & A, D, H Reduce farther 1 period of activity (H) with increase of cost =150 ActivityPrecedence NormalCrashCost Slope, Time, dayCost, $Time, dayCost, $$/day A B CA DA EB,C FC GE31503 ** HD,F Σ A C B E G F H START FINISH D

Example2: Crashing Project (123) Reduction from 22 to 17 increase to 3490 ActivityPrecedence NormalCrashCost Slope, Time, dayCost, $Time, dayCost, $$/day A B CA DA EB,C FC GE31503 ** HD,F Σ CycleActivityTimecost Total cost Duration C A D,F H

Example2: Crashing Project (123) Accelerating the Critical and Noncritical path ActivityPrecedence NormalCrash Cost Slope, Time, day Cost, $ Time, day Cost, $ $/day A B CA DA EB,C FC GE31503 ** HD,F Σ

 Determine Normal project duration, and cost. How project is crashed? Network Compression Algorithm  Identify Normal duration Critical Path.  For large network, using CRITICALITY THEORM to eliminate the noncritical paths that do not need to be crashed.  Compute the cost slop

How project is crashed? Network Compression Algorithm  shortening the CRITICAL ACTIVITIES beginning with the activity having the lowest cost-slope  Organize the data as in the following table:  Determine the compression limit (Nil)

How project is crashed? Network Compression Algorithm  Update the project network  When a new Critical path is formed: -Shorten the combination of activity which Falls on Both Critical Paths, OR -Shorten one activity from each of the critical paths. Use the combined cost of shortening both activities when determining if it is cost effective to shorten the project.  At each shortening cycle, compute the new project duration and project cost  Continue until no further shortening is possible

How project is crashed? Network Compression Algorithm  Use the total project cost-time curve to find the optimum time.  Tabulate and Plot the Indirect project Cost on the same time- cost graph  Add direct and indirect cost to find the project cost at each duration.

Example

Example 3

Project Optimal Duration Example 3

CASE WORK