ELENA Support system 6/11/2014 Antti Kolehmainen on behalf of WP Support system

Slides:



Advertisements
Similar presentations
SPL Intercavity support Conceptual design review 04/11/ A. Vande Craen TE/MSC-CMI.
Advertisements

Excel Environ Racks Simon Robinson. Ranges Sizes Features Environ v. formal surround; enclose.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
, CLIC Test Module Meeting Status of the DB Quad adjustable support design Mateusz Sosin CLIC Module WG Meeting, 22-May-2013.
Vacuum System Elements for BESSY II Vacuum Equipment All vacuum elements are produced at BINP in accordance to the European standards and satisfy the.
MERIT Beam Collimator Design Nicholas Olesen 9 August 2006.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
1 Installation of Delphi Frame  ITS Installation.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
Initial deformation of the PETRA3 slab IWAA2010, Markus Schlösser introduction temperature analytical models measure- ments result Initial Deformation.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team with 3D views and data from Hubert Gerwig, Richard Rosing and Juha Kemppinen Pre-alignment.
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
CIEMAT ACTIVITIES ON STRIPLINE KICKERS I. Rodríguez.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
MUON_EDR-06 (Alignment) Enrique Calvo Alamillo February 28-March 1, 2002 Link Mechanics: Status.
SPS scrubbing experience: electron cloud observables L. Mether on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, September 8, 2015.
CLASSE prototype: mechanical concepts G. De Michele, EPFL-PSI-CERN on behalf of CERN team SLAC, 16 th April, 2012.
ELENA – Electron Cooler Vacuum design Benjamin Moles March 26 th 2015 on behalf of Electron Cooler team : Gerard Tranquille Jean Cenede Lars Soby Lars.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
Argonne National Laboratory is managed by The University of Chicago for the U.S. Department of Energy LCLS Girder Support Concept Design Sushil Sharma.
Permanent Magnet Quadrupoles for the CLIC Drive Beam Jim Clarke, Norbert Collomb, Neil Marks, James Richmond, and Ben Shepherd STFC Daresbury Laboratory,
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
10/28/2015Pierre Moyret1 Production of SQXF Magnet Components: Return on experience P.MOYRET EN-MME-FS.
ELENA Vacuum System R. Kersevan, TE-VSC-IVM R. Kersevan, “ELENA Vacuum System”, - ELENA Project Review, Oct14-15, 2013, CERN.
Dmitry Gudkov BE-RF-PM CLIC Module Working Group Engineering design of the adjustable supporting system for DBQ.
Preliminary calculations for the vacuum system of ELENA R. Kersevan TE/VSC-IVM – 21/6/2012 The vacuum sectors, the position of vacuum pumps, flanges, and.
Lav meeting F. Raffaelli INFN – Sezione di Pisa C. Capoccia LNF, A. Cecchetti INFN – Sezione di Frascati CERN, Dec13 th, Feet friction studies. -Installation.
Status of MAMI C Hans-Jürgen Arends CB-Meeting, Basel October 4-6, 2006.
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
ELENA EXTRACTION LINES W. Bartmann, D. Barna, M. Fraser, J. Jentzsch, R. Ostojic ELENA Commissioning discussion, 23th November, 2015.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Beam Wire Scanner for PS/SPS/PSB Current status and Schedule Dmitry Gudkov BE-BI-ML.
L. Sermeus TE-ABT-FPSELENA IIC meeting 3 th April Review of ELENA Injection kicker Luc Sermeus on behalf of WP 2.8 (with informations from EN-MME)
SPS movable table Joanna Swieszek, Kurt Artoos (EN-MME) 14/04/2016.
1 BROOKHAVEN SCIENCE ASSOCIATES 12th International Workshop on Accelerator Alignment September 10-14, 2012 Fermilab, Batavia, Illinois, U.S.A NSLS-II Girder.
Status Report of the Realignment for J-PARC 3GeV RCS N. Tani, H. Hotchi, M. Yamamoto, J. Kamiya, K. Horino, M. Kinsho J-PARC Center, JAEA 1 Outline 1.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
ELENA installation progress F. Butin / ELENA collaboration.
TPC Support Installation 26 Apr 2016Dan Wenman Mechanical Engineer1 Overview Installation of the support rails Details of the rail from the SAS to the.
Girder-Magnets Installation
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Some Design Considerations and R &D of CEPCB Dipole Magnet
Page Headline CBETA Splitter.
ELENA installation and commissioning status
The design schemes of the low field dipole magnets
CLIC Common RF-girder study
Components for the Machine-Interface Regions
Concepts and Requirements for GIMM Structures
FRESCA2 Update on the dipole design and new calculations
Pierre-Alexandre Thonet
The SPEAR3 Upgrade Project at SLAC
The SPEAR3 Upgrade Project at SLAC
BASEPLATES SLIDE SHOW.
Arch205 building construction floor & Roof systems
XFEL Collimation and Beam Switchyard Vacuum Issues
ESS Concrete Pit Lids.
Extraction Michael Bevins May 17, 2007
Neutron guide Shielding Concept
Bunker Wall Design Wall ESS
Progress and plans, Mechanics system of CEPC
Work Unit AIK 11.2 CDR of the CDS-SL Mechanics
Status of QQXF cryostat
Presentation transcript:

ELENA Support system 6/11/2014 Antti Kolehmainen on behalf of WP Support system

OVERVIEW FUNCTION / REQUIREMENTS ADJUSTABILITY CONCEPT ‘SMALL’ EQUIPMENT CONCEPT ‘HEAVY’ EQUIPMENT SEPTA SCHEDULE

FUNCTION To keep your equipment where required, as long as required

REQUIREMENTS To detail and to add to the previous: To allow alignment to required position with required accuracy To retain in this position as long as required To allow removal of smaller magnets without breaking the vacuum To allow thermal expansion due to bake-out, where applicable No effect to magnetic elements > non-magnetic materials

ADJUSTABILITY TABLES: X = ±15 mm; Y = ±15 mm; Z = +15 mm / - 52 mm  Z-down by 52 mm allows to remove magnets without breaking vacuum HIGHEST REQUIRED POSITIONING TOLERANCE:  X = ±0.2 mm(±0.1 Scrapers)  Y = ± 1 mm(Scrapers ?) PLEASE COMMENT!  Z = ±0.2 mm(±0.1 Scrapers) REGULATION:  MOST COARSE REGULATION = 1.5 mm / TURN ON THREAD BASED ALIGNMENT -> ~ 45 DEGREES FOR 0.2 mm

CONCEPT OVERVIEW XYZ ALIGNMENT TABLE RIGID SUPPORT FOR A GROUP OF EQUIPMENT CONCRETE RESIN TO COUNTER FLOOR VARIATION

CONCEPT DETAILS EQUIPMENT HEIGHT WITH +52 / -15 mm ADJUSTMENT HORIZONTAL ADJUSTMENT OF ±15 mm RIGID ALUMINIUM SUPPORT WITH HEIGHT OF 630 mm NOMINAL SUPPORT SYSTEM HEIGHT TO ALLOW FLOOR VARIATION CONCRETE RESIN PAD TO FILL BETWEEN SUPPORTS AND FLOOR

TRANSFER LINE CONCEPT AS FOR RING

XYZ-TABLES TWO VERSIONS LONGITUDINAL ADJUSTMENT CAN BE MOUNTED ON EITHER SIDE FOR INTEGRATION ALUMINIUM PLATES AND BLOCKS, BRONZE BEARINGS, STAINLESS STEEL HARDWARE

RING GIRDERS TWO VERSION FOR RING, 4 OR 5 PCS FOR SECTIONS 2, 3, 5 AND 6 DEFORMATION WITH HIGHEST LOAD ~0.07 mm TENDER OUT CURRENTLY PROFILE TO BE SELECTED PROFILE CROSS SECTION AND GIRDER LOADS DEFINED

TRANSFER LINE GIRDERS THREE VERSIONS FOR 2015/16 INSTALLATION SMALLER PROFILES AS LOADS ON TL EQUIPMENT GROUPS ARE SMALLER TENDER OUT AS FOR RING GIRDERS

COLUMN FOR FREE STANDING EQUIPMENT < 500 kg COULD BE BASED ON THE ALUMINIUM PROFILE FOR GIRDERS OR BE A WELDED DESIGN REQUIRED FOR RING SECTIONS 1 AND 4(POSSIBLY 5 ALSO) AND TLs

DIPOLE & ECOOLER JACK FOR SUPPORTING EQUIPMENT WITH m > 1000 kg ADJUSTMENT: X & Y = ±10 mm Z = ±15 mm DEVELOPED FOR LINAC4 TO BE USED IN TRIPOD CONFIGURATION -> COMBINATION OF FREE AND ADJUSTABLE MOVEMENTS TOGETHER WITH CORRECT ORIENTATION CREATES ISOSTATIC, ADJUSTABLE CONFIGURATION CONTRIBUTION FROM UNIVERSITY OF MAINZ

SMALL JACK FOR EQUIPMENT WITH 400 kg < m < 1500 kg ADJUSTMENT: X & Y = ±14 mm Z = + 15 / -25 mm BASED ON JACK USED IN SPS USED FOR INJECTION KICKER AND TL DIPOLE THREE CONFIGURATIONS WITH REGULATIONS, DEFINED PROCEDURE FOR REGULATION

SEPTA SUPPORT FOLLOWS THE BASIC CONCEPT SPECIAL FEATURE A POSSIBILITY FOR A RAPID REMOVAL AND RETURN TO FINAL POSITION WITHOUT SURVEY INTERVENTION TO PROTECT THE COILS DURING BAKE-OUT

HIE-ISOLDE

SCHEDULE & COST

OPEN POINTS SECTION 5 LAY- OUT SOURCE DETAILS FOR SUPPORTING NEG STRIP CHAMBER AT LNE EXTRACTION SEM DETAILS

ELENA is on its way… ? / ! THANK YOU FOR YOUR ATTENTION!