Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.

Slides:



Advertisements
Similar presentations
Little Canyon Creek Subwatershed Steelhead Trout Habitat Improvement Project Sponsored by: Lewis Soil Conservation District.
Advertisements

Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
Flood the Sugar Cane Farms Now to Save the Estuaries: Is This Feasible ? Water Resources Advisory Commission January 5, 2006 Meeting.
Metropolitan Council Environmental Services A Clean Water Agency Presented to the Environment Committee November 9, 2010 Information Item Master Water.
Revised FY 2007 & Proposed FY 2008 Operating & Capital Budgets Retail Rates Committee January 4, 2007.
Florida Water Forum Everglades Restoration June 3, 2011.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Comprehensive Everglades Restoration Plan Picayune Strand Restoration Project Janet Starnes, Principal Project Manager Office of Everglades Policy and.
Expedited Projects + Innovative Teamwork = Measurable Improvements to the Health of Lake Okeechobee and the St. Lucie and Caloosahatchee Estuaries.
Chesapeake Bay Program Habitat Goals Implementation Team June 26, 2013.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
. Topographic map of the Refuge marsh (figure provided by Dr. E.A. Meselhe based on USGS topography data). Elevations are in feet, NGVD29.Form USGS data;
Chapter 8: Implementation of the Long-Term Plan for Achieving Water Quality Goals in the Everglades Protection Area 2006 South Florida Environmental Report.
Everglades Protection Area Tributary Basins January 15, 2004 Tracey Piccone, P.E.
Framework Agreement Principals Meeting #5 March 23, 2015 Everglades Water Quality Restoration.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Interim Update: Preliminary Analyses of Excursions in the A.R.M. Loxahatchee National Wildlife Refuge August 18, 2009 Prepared by SFWMD and FDEP as part.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Steve Harrison, Environmental Manager Bureau of Entomology and Pest Control -Mosquito Control Section.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Everglades Protection Area Tributary Basins February 26, 2004 First Annual Public Meeting on Implementation Progress.
Sunshine Coast Regional District Development Cost Charges July 3, 2014 Infrastructure Services Committee Bob Twerdoff.
Los Osos Community Services District Basin Management Planning and Proposed Work Program June 5, 2008.
WRAC Issues Workshop EAA/STA-2 Expansion Cell 4 April 11, 2005 Acceler8 Overview.
Tracey Piccone, P.E. August 10, 2004 Tracey Piccone, P.E. August 10, 2004 STA-1W Cell 5 Limerock Berm 2003 Outstanding Project of the Year Palm Beach County.
Basin-Specific Feasibility Studies STA and Reservoir Alternatives Basin-Specific Feasibility Studies STA and Reservoir Alternatives November 21, 2002 Presentation.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Integrated Ecological Assessment February 28, 2006 Long-Term Plan Annual Update Carl Fitz Recovery Model Development and.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives August.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
Basin Specific Feasibility Studies Everglades Stormwater Program Basins Preliminary Findings Contract C-E024 HSA Engineers & Scientists DB Environmental.
STA Performance Update February 28, 2006 Long-Term Plan Annual Update Tracey Piccone, P.E. February 28, 2006 Long-Term Plan Annual Update Tracey Piccone,
WRAC Acme Basin B Discharge Project February 2, 2006.
Millbrook Dam Environmental Assessment Study Dan Marinigh CAO/Secretary-Treasurer Otonabee Region Conservation Authority October 20, 2015 Otonabee Conservation.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Northeast Corridor Greenway Acquisition Project – Design and Permitting Status Update City Council Workshop August 25, 2015.
Everglades Protection Area Tributary Basins February 28, 2006 Third Annual Public Meeting on Implementation Progress.
Central & Southern Florida Project George Horne Deputy Executive Director Operations & Maintenance Resource Area.
Revisions to the Long-Term Plan for Achieving Everglades Water Quality Goals November 18, 2004 Gary Goforth Chief Consulting Engineer South Florida Water.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Proposed Revisions to the Long-Term Plan Long-Term Plan Communications Meeting August 25, 2004 Gary Goforth Chief Consulting Engineer South Florida Water.
Pasadena Water and Power Public Hearing Date Water Capital Improvement Charge Pasadena City Council Meeting November 16, 2015 Agenda Item #13.
Central Valley Flood Protection Board Meeting – Agenda Item No. 9A CVFPB MEETING – October 25, 2013.
Pasadena Water and Power Public Hearing Water Capital Improvement Charge Pasadena City Council Meeting January 11, 2016 Item #12.
Everglades Protection Area Tributary Basins February 23, 2005 Second Annual Public Meeting on Implementation Progress.
Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives August.
Water Management Options Analysis Sonoma Valley Model Results Sonoma Valley Technical Work Group October 8, /08/2007.
Susan Sylvester Department Director Operations Control Department Mechanics of the Primary Water Management System.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives August.
Watershed Monitoring *Background Watershed Stewardship Plan-2004 Gap Projects IRWMP-Dec Policies SFEI study-2007 Joint TC/WC meeting-June 2010 *Proposed.
FIMS FY16 Year-End Schedule FIMS Annual Training May 10-12, 2016 PREPARED BY: GAYLE SMITH.
Beth Kacvinsky - Lead Project Manager Office of Everglades Policy and Coordination March 1, 2016 IRL-S / C-44 Overview.
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
1 EASTERN MUNICIPAL WATER DISTRICT Water Use Efficiency Master Plan Elizabeth Lovsted, PE Senior Civil Engineer January 16, 2016.
STA 2 Expansion Project Conceptual Plan for Cell 4 STA 2 Expansion Project Conceptual Plan for Cell 4 Long-term Plan Communications Meeting November 18,
Approval of FY-2016 Capital Budget and the 10-Year Capital Plan February 11, 2015.
MRBB Technical Committee Update to the MRBB
FY Proposed Budget and Rates
STA-1E Structures, Flow, & Long Term Enhancements*
Joshua Basin Water District Draft Findings & Rate Scenarios
City of Forest Lake MS4 Program
Joshua Basin Water District Revised Rate Recommendations
NATURAL RESOURCES CONSERVATION SERVICE
Space Coast TPO State Road (S.R.) 528 Update
Presentation transcript:

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Proposed Revisions to Plan Options for Accelerating Recovery Project Jamie Serino June 1, 2006

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Proposed Revisions to Plan Options for Accelerating Recovery Project  In anticipation that the probable pace of natural recovery of previously impacted areas would result in an undesirably long recovery period, the funding of analysis and research on options for accelerating recovery was proposed  At that time there were no specific management activities that had been demonstrated to accelerated recovery from dense cattail to sawgrass dominated wetlands at a large scale  It was anticipated that research would require expenditures (FY 2003 dollars) of $500,000 per year for a 3-year period encompassing Fiscal Years , inclusive

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Proposed Revisions to Plan Options for Accelerating Recovery Project (cont.)  Accelerated Recovery Projects were developed by District scientists, presented at a public workshop, and peer reviewed by a panel of external scientists. A comprehensive research plan was developed. The research was initiated in Fiscal Year  Two projects are underway, Fire and Cattail Habitat Improvement Project (CHIP). The Fire project is being implemented under the Long-Term Plan. The CHIP is a separate but related project.

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Proposed Revisions to Plan Options for Accelerating Recovery Project (cont.)  Fire is a project that will utilize repeated controlled burns at highly and moderately enriched sites (in Water Conservation Area-2A) to test the hypothesis that these treatments will accelerate the recovery of ecological function in these areas, as the nutrient loading from the Everglades Agricultural Area is reduced.  It is proposed that the Options for Accelerating Recovery Fire project be extended by four years to FY2010 with a revised total budget of $3,767,282.

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Proposed Revisions to Plan STA-1W Enhancements Project Tracey Piccone June 1, 2006

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Proposed Revisions to Plan STA-1W Northern Flow-way (Cell 5) Enhancements As a direct result of the September 2004 hurricanes, the SAV in the eastern portion of Cell 5B was uprooted and a severe decline of the vegetation in the western portion of the cell was set in motion, ultimately resulting in virtually a complete loss of SAV in Cell 5B

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Proposed Revisions to Plan STA-1W Northern Flow-way (Cell 5) Enhancements (cont.) Deterioration of SAV was likely due to combination of the following factors: ØUnconsolidated sediment was easily suspended resulting in: excessive turbidity, and the inability to adequately secure vegetative roots ØNon-uniform depths, with north-eastern portions of the system much deeper than others, resulting in water depths higher than optimal for SAV growth in these areas ØDue to the dark tannic water, the deeper areas resulted in poor light penetration and played a part in the poor SAV growth ØSevere hurricane winds in September 2004 and October 2005 resulting in uprooted vegetation and re-suspension of sediment into the water column

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Proposed Revisions to Plan STA-1W Northern Flow-way (Cell 5) Enhancements (cont.) After the 2004 hurricanes, steps were taken to improve Cell 5 vegetation growth ØWater depths were lowered ØLoads were reduced

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Proposed Revisions to Plan STA-1W Northern Flow-way (Cell 5) Enhancements (cont.) After the 2005 hurricane, sediment and vegetation were severely disrupted and additional action was proposed: ØExtensive dry-out of Cell 5B to consolidate the sediment ØPlanting of rice to assist with Sediment stabilization Anchoring of SAV Attachment area for epiphytic periphyton ØPlanting of vegetated berms in Cell 5B to serve as windbreaks ØRe-distribution of cell material from high areas to low areas

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Proposed Revisions to Plan STA-1W Eastern Flow-way (Cells 1 & 3) Enhancements Construction of G-248 levee scheduled for winter 2006 (FY07) (previously approved revision) ØWill divide Cell 1, resulting in Cells 1A and 1B Construction to be completed in the wet ØInflow to eastern flow-way may be reduced, not halted ØEstimated completion by July 2007 (FY07) If needed, G-253 culvert maintenance will be included ØO&M activity

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Proposed Revisions to Plan STA-1W, Eastern Flow-way (Cells 1 & 3) Enhancements (cont.) Vegetation conversion to SAV in Cells 1B and 3 ØBased on lessons learned with STA-1W Cell 4 conversion, District will avoid taking the cell completely off-line for vegetation conversion ØMay occur concurrently with construction beginning February or March 2007 (FY07) ØSelective spraying of herbicide will be employed to open areas for SAV growth and encourage vegetated berms as wind breaks ØEstimated completion by January 2008, with grow-in over the summer of 2008

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Proposed Revisions to Plan STA-2 Enhancements Project Hydrologic and Hydraulic Assessment Project Internal Measurements Project Comparative Analysis Project Tracey Piccone June 1, 2006

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Proposed Revisions to Plan Long-Term Plan Enhanced and Expanded STA-2

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Proposed Revisions to Plan STA-2 Cell 3 Enhancements Long-Term Plan assumed improvement in TP removal resulting from improved flow distribution from new levee and structures ØCell 3 capital cost for levees/structures: $2.37 million (FY2003 $) ØWould require Cell 3 to be taken off-line for months Tracer study demonstrated efficient hydraulics in STA-2 Cell 3 without the levee (DB Environmental, Inc. 2004) Ø5.5 tanks in series Evaluated performance with & without Cell 3 compartmentalization ØDMSTA2 model runs indicate no improved TP removal performance with levee compared to without levee

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Proposed Revisions to Plan Comparison of TP Removal Performance 2003 Long-Term Plan (WY ) ØSTA-2 Discharge: 222,655 AF/yr 4,568-6,420 kg/yr ppb ØCells 3A/3B: 77,782 AF/yr 1,387 kg/yr 14 ppb 2005 EAA Regional Feasibility Study Data ØEnhancements deferred; not simulated in RFS ØFor comparison, used WY Data set & DMSTA2 ØWith compartments: STA-2 Discharge: 346,275 AF/yr 10,159 kg/yr 24 ppb Cells 3A/3B: 169,267 AF/yr 6,150 kg/yr30 ppb ØWithout Cell 3 compartment (5.5 tanks in series): STA-2 Discharge: 346,275 AF/yr 10,159 kg/yr 24 ppb Cell 3: 169,267 AF/yr 6,120 kg/yr 30 ppb

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Recommended Enhanced and Expanded STA-2 N G-335 Cell 3B Cell 2B Cell 1B P G-337A G-332 G-334 S-6 G-337 G-328 G-339 ~2.7 miles S-7 New Cell 4 Compartment B Build-out Additional Treatment Area (approx. 3,300 acres) New Cell 4 inflow canal & structures STA-3/4 Compartment B Build-out Additional Treatment Area (approx. 4,275 acres) 4 1,900 STA-2 North New River Canal New Cell 4 discharge canal & structure Existing STA-2 Cell 2A Cell 3 Cell 1A Effective Cell Area (ac) 1 1, , ,220 Total 8,330 ac G-331 A-G G-336 A-F G-329 A-D G-333 A-E G-330 A-E G-336G WCA-2A G-338 N G-335 Cell 2B Cell 1B P G-337A G-332 G-334 S-6 G-337 G-328 G-339 ~2.7 miles G-339 ~2.7 miles S-7 New Cell 4 Compartment B Build-out Additional Treatment Area (approx. 2,536 acres) New Cell 4 inflow canal & structures STA-3/4 Compartment B Build-out Additional Treatment Area (approx. 4,275 acres) Proposed Revisions to Plan

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Proposed Revisions to Plan Hydrologic and Hydraulic Assessment & Internal Measurements Pre-levee tracer performed in STA-2 Cell 3 per original Long-Term Plan recommendation As a result of proposal to delete proposed STA-2 Cell 3 internal levee ØLocation of the tracer and synoptic internal measurements is proposed to be moved to STA-1W eastern flow-way (Cells 1A, 1B, and 3) where a pre-levee tracer was performed Estimated tracer start date of Fall 2008 (FY09) Estimated tracer completion by December 2008 (FY09)

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Proposed Revisions to Plan Comparative Analysis Move comparative analysis report from FY08 to FY09 to reflect results of STA-1W eastern flow- way tracer (with levee) Use results to determine whether or not to proceed with the STA-2 Cells 1 and 2 internal levees

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Proposed Revisions to Plan STA-2 Enhancements (Cells 1 and 2) If the with-levee tracer project confirms improved performance, proceed with the STA-2 Cells 1 and 2 internal levees Construction would occur within the current approved schedule for this work as follows: ØCell 2 levee: Start construction Dec – Dec ØCell 1 levee: Start construction Dec – Dec. 2011

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Proposed Revisions to Plan STA-6 Sections 1 & 2 Enhancements Tracey Piccone June 1, 2006

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Inflow Treatment Flow Outflow Diversion Flow L-4 Canal Cell 3 Manual Structure Passive Structure G-603 G-607 G-354A G-354B G-354C G-393B G-393A G-393C Canal L-3 G-600 N *Not to Scale G-396A G-396B G-396C G-352A G-352B G-352C G-353A G-353B G-353C G-407 L-3 Extension Canal Cell 2 Cell 4 Cell 5A Cell 5B Long-Term Plan Enhanced and Expanded STA-6 Proposed Revisions to Plan

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Proposed Revisions to Plan STA-6 Sections 1 and 2 Enhancements Long-Term Plan assumed improvement in TP removal resulting from improved flow distribution from new levee and structures & SAV in Cell 5B ØCell 5 capital cost for enhancements: $2.92 million (FY2003 $) ØSection 2 capital cost for levees/structures: $2.94 million (FY2003 $) ØWould require Cell 5 to be taken off-line for months URS evaluated performance without compartmentalization as part of STA-6 Section 2 Basis of Design Report (BODR)

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Proposed Revisions to Plan Comparison of TP Removal Performance 2003 Long-Term Plan (WY ) ØDischarge: 35,100 AF/yr 750-1,040 kg/yr ppb 2005 STA-6 Expansion BODR (URS 2005) ØDischarge: 44,000 AF/yr kg/yr ppb ØBasis of Design Report Stormwater Treatment Area 6 Section 2. June 2005 (Updated January 2006, page 5-9)

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Inflow Treatment Flow Outflow Diversion Flow L-4 Canal Cell 5 Cell 3 Manual Structure Passive Structure G-603 G-607 G-354A G-354B G-354C G-393B G-393A G-393C Canal L-3 G-600 N *Not to Scale G-396A G-396B G-396C G-352A G-352B G-352C Section 2 G-353A G-353B G-353C G-407 L-3 Extension Canal Recommended Enhanced and Expanded STA-6 Proposed Revisions to Plan

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Elimination of enhancements to STA-2 Cell 3 and STA-6 Sections 1 and 2: ØPotential capital cost savings of $8.23 million (FY2003 $) ØNo impact to TP removal performance based on DMSTA2 evaluations STA-2 Cell 3: Goforth STA-6: URS Proposed Revisions to Plan