1 st October 2009 2009 Linear Collider workshop The CLIC/ILC common work plan progress J. Clarke and L. Rinolfi.

Slides:



Advertisements
Similar presentations
30/10/09 Positron Workshop 1 Future Work Plan, Action Items, Future Meetings Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
Advertisements

A Capture Section Design for the CLIC Positron Source A. VIVOLI* Thanks to: L. RINOLFI (CERN) R. CHEHAB (IPNL & LAL / IN2P3-CNRS) O. DADOUN, P. LEPERCQ,
Friday 28 th April Review of the aims and recommendations from the workshop L. Rinolfi.
Applications of a high finesse Fabry Perot Cavity for the ILC ► Introduction ► Status of the cavity R&D – at ATF – at LAL/Orsay Japanese Labs. : KEK, ATF.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
1 st October 2008 Réunion sur la contribution exceptionnelle de la FrancePositron generation L. Rinolfi (CERN) Contribution exceptionnelle de la France.
16 th June 2008 POSIPOL 2008L. Rinolfi / CERN CLIC e + sources status L. Rinolfi with contributions from F. Antoniou, H. Braun, A. Latina, Y. Papaphilippou,
Summary of the Working Groups - Polarization -  Technical Aspects Conveners: Gudrid Moortgat-Pick,Louis Rinolfi, Sabine Riemann, Valery Telnov International.
Linac e+ source for ILC, CLIC, SuperB, … Vitaly Yakimenko, Igor Pogorelsky November 17, 2008 BNL.
J.P.DelahayeE-GDE meeting 10/05/061 CERN non EU contribution to ILC J.P.Delahaye.
Polarimetry at the LC Source Which type of polarimetry, at which energies for LC ? Sabine Riemann (DESY), LEPOL Group International Workshop on Linear.
Compton/Linac based Polarized Positrons Source V. Yakimenko BNL IWLC2010, Geneva, October 18-22, 2010.
Compton based Polarized Positrons Source for ILC V. Yakimenko Brookhaven National Laboratory September 12, 2006 RuPAC 2006, Novosibirsk.
11/18/2008 Global Design Effort 1 Summary for Gamma-Gamma Mayda M. Velasco Northwestern University November 20, 2008 LCWS08 -- UIC, Chicago.
WG3a Sources Summary Jim Clarke on behalf of John Sheppard, Masao Kuriki, Philippe Piot and all the contributors to WG3a.
Study of High Intensity Multi-Bunch  -ray Generation by Compton Scattering ATF TB 28/May/2006 presented by Tsunehiko OMORI (KEK) on behalf.
A.Variola Motivations…from D.Hitlin Talk The polarized positron source.
15 th October CLIC workshop The CLIC/ILC common issues for the sources Jim Clarke and Louis Rinolfi.
Global Design Effort 1 Sources Parallel Session Summary Jim Clarke STFC Daresbury Laboratory.
Summary of Gamma-Gamma session Tohru Takahashi Hiroshima University Mar LCWS10/ILC10.
Alessandro Variola MAY 23 rd 2007 POSIPOL WELCOME WELCOME POSIPOL 2007 Goals Alessandro Variola MAY 23 rd 2007 Posipol Welcome.
Welcome and Introduction to the Workshop Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory ILC Positron Source Collaboration Meeting 29 – 31.
ILC/CLIC e + generation working group Jim Clarke, STFC Daresbury Laboratory and Louis Rinolfi, CERN.
Discussion, Action Items, & Future Work Plan Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory ILC Positron Source Collaboration Meeting 29 –
2nd ECFA LHeC Workshop; 1-3 September 2009, Divonne L. Rinolfi Possible e - and e + sources for LHeC 1 Thanks to O. Brüning, A. Vivoli and F. Zimmermann.
10/9/2007 Global Design Effort 1 Optical Matching Device Jeff Gronberg / LLNL October 9, 2007 Positron source KOM - Daresbury This work performed under.
R.Chehab/ R&D on positron sources for ILC/ Beijing, GENERATION AND TRANSPORT OF A POSITRON BEAM CREATED BY PHOTONS FROM COMPTON PROCESS R.CHEHAB.
1 Scope of PosiPol2008 WS LC related positron source issues (ILC and CLIC) General Capture Section Targets Polarized Particle Physics Laser Applications.
23 th July 2010 CLIC meeting L. Rinolfi POSIPOL workshop 2010 L. Rinolfi A brief overview.
Status of the CLIC main beam injectors LCWS, Arlington, Texas, October 22 th -26 th, 2012Steffen Döbert, BE-RF Overview of the CLIC main beam injectors.
Undulator based polarized positron source for Circular electron-positron colliders Wei Gai Tsinghua University/ANL a seminar for IHEP, 4/8/2015.
17 th November2008 ILC 08 workshopL. Rinolfi CLIC e - and e + sources and ILC/CLIC common studies L. Rinolfi On behalf of the ILC/CLIC e + working group.
22 th October 2010 IWLC Sources working group J. Clarke, T. Omori, L. Rinolfi, A. Variola Summary of Sources working group WG1 with contributions from.
Status of the Compton Experiment at the ATF TILC09 18-April-2009 T.Takahashi Hiroshima University for collaborators.
27 th May 2009 CLIC ACE meetingL. Rinolfi CLIC Main Beam generation Baseline configuration only L. Rinolfi for the CLIC Injector complex team.
WG3a Sources Update Jim Clarke on behalf of WG3a GDE Meeting, Frascati, December 2005.
CLIC polarized e+ source based on laser Compton scattering Frank Zimmermann CLIC Meeting, 16. December 2005 Thanks to Eugene Bulyak, Masao Kuriki, Klaus.
T.Takahashi Hiroshima /11/5 Tohru Takahashi Hiroshima University 高橋 徹 広島大学.
CERN 14 October 08 Injectors and Damping Rings working group S. Guiducci, L. Rinolfi CLIC08 Workshop.
CLIC-ILC accelerator collaboration Ph. Lebrun* CERN IWLC 2010 CERN Geneva 22 October 2010 * With the help of E. Elsen, M. Harrison, J. Osborne, Y. Papahilippou,
POSIPOL Berlin ILC/CLIC e + generation working group Wei Gai, ANL Louis Rinolfi, CERN Thanks to Omori-san for the coordination of the Webex meetings.
November 20, 2008 A. Brachmann Slide 1 Sources Session Summary LCWS 2008 A. Brachmann, J. Clarke.
Summary of the workshop on polarized positron source based on Compton back scattering L. Rinolfi CERN POSIPOL Workshop CERN April 2006 POSITONS.
김 귀년 CHEP, KNU Accelerator Activities in Korea for ILC.
Conventional source developments (300Hz Linac scheme and the cost, Part-II) Junji Urakawa, KEK PosiPol-2012 at DESY Zeuthen Contents : 0. Short review.
TILC Electron Source Update A. Brachmann, J. Sheppard, F. Zhou -SLAC – M. Poelker - Jlab - TILC, Tsukuba, April 2009.
28 th August 2011 POSIPOL Workshop – IHEP-Beijing- ChinaL. Rinolfi Louis Rinolfi CLIC e + status.
GDE FRANCE Why High brillance gun is good for the ERL scheme? And SC GUN? Alessandro Variola For the L.A.L. Orsay group.
Oct. 6, ILC Positron Source Group Meeting Short report by S. Riemann September 2006, RAL.
Compton Gamma-ray Generation Experiment by Using an Optical Cavity in ATF POSIPOL 2007 Workshop at LAL Hirotaka Shimizu Hiroshima University.
Update of R&D Optical Cvities at KEK-ATF ►Introduction ►Status of the cavity R&D ►Recent activities ►Out Look KEK, Hiroshima University LAL (Orsay) in.
11/18/2008 Global Design Effort 1 Summary for Gamma-Gamma Mayda M. Velasco Northwestern University November 20, 2008 LCWS08 -- UIC, Chicago.
R.Chehab/FCPPL2010/Lyon1 AN HYBRID POSITRON SOURCE FOR ILC -Collaboration IN2P3-IHEP, with BINP, KEK, Hiroshima-U, CERN- X.Artru, R.Chehab, M.Chevallier.
20 th October 2010 IWLC Sources working groupL. Rinolfi Louis Rinolfi CLIC e - and e + sources overview for the CLIC Sources collaboration.
High Gain Compton Free Electron Laser
A.Variola LCWS07 DESY-Hambourg Posipol A.Variola LCWS07 DESY-Hambourg Some Posipol 2007 numbers ~ 55 inscriptions 3 days workshop 8 sponsors Different.
Progress with Zeuthen Meeting Actions Jim Clarke ASTeC, STFC Daresbury Laboratory.
LHeC Sources Rinolfi CERN Thanks to:
R&D description Schedule
Recent developments of optical cavity systems for advanced photon sources based on Compton backscattering A. Martens, F. Zomer, P. Favier, K. Cassou,
Status of the CLIC main beam injectors
CLIC e+ status Louis Rinolfi.
CLIC Main Beam Sources and their transfer lines
REVIEW OF POSITRON SOURCE R&D FOR LINEAR COLLIDERS
CLIC Undulator Option for Polarised Positrons
ILC/CLIC e+ generation working group
Summary for the Sources working group
Polarized Positrons at Jefferson Lab
Summary of Gamma-Gamma session
with contributions from
Presentation transcript:

1 st October Linear Collider workshop The CLIC/ILC common work plan progress J. Clarke and L. Rinolfi

1 st October Linear Collider workshop "ILC/CLIC e + generation" working group ILC convener: J. Clarke (Daresbury) Officially set-up at University of Illinois Chicago - UIC during ILC08 workshop: 15 th - 20 th November 2008 CLIC convener: L. Rinolfi (CERN) Monthly regular Webex meetings, called “ILC/CLIC e + studies” managed by T. Omori / KEK Distribution list managed by G. Moortgat-Pick at:

1 st October Linear Collider workshop The ILC study considers the Undulator option as the base line while the Compton schemes are alternative options. The CLIC study considers the Compton schemes as the base lines while the Undulator is an alternative option. Additionally, both projects are interested in the development of conventional sources (ILC as an auxiliary source and CLIC as an alternative baseline). The working group should:  Develop the synergy between the ILC and CLIC e + studies.  Evaluate the common technical issues related to both options for the production of polarized positrons.  Prioritize R&D.  Review the existing technical and tests facilities where further tests could be performed.  Evaluate where cost savings could be obtained.  Promote common meetings and workshops. Mandate of the working group

1 st October Linear Collider workshop For polarized electron sources, ILC and CLIC studies are based on photo-injectors using a DC gun with different parameters. For polarized positron sources, the ILC study considers the Undulator option as the base line while the Compton schemes are alternative options. The CLIC study considers the Compton schemes as the base line while the Undulator is an alternative option. Additionally, both projects are interested in the development of conventional sources (ILC as an auxiliary source and CLIC as the baseline for the CDR). The working group should:  Develop the synergy between the ILC and CLIC e + and e - studies.  Evaluate the common technical issues related to production of unpolarized and polarized positrons.  Prioritize R&D.  Review the existing tests facilities where further tests could be performed.  Invite experts from different institutes to contribute to the studies.  Evaluate where cost savings could be obtained.  Promote common meetings and workshops. Updated mandate of the working group

1 st October Linear Collider workshop CLIC/ILC work plan (1) a) Undulator-based source Develop Geant4 model of collimator, target, capture optics, and capture RF assembly. Optimise parameters wrt yield, polarisation and cost (Collaboration with ANL). Consider timing constraints issues and upgrade paths. Consider electron beam quality issues. b) Compton source Design of the Compton ring (Collaboration with NSC KIPT). Optical stacking cavity (Collaboration with LAL and KEK). High power lasers. Stacking simulations. c) Lithium lens capture optics Evaluate suitability for Undulator and Compton schemes (Wide collaboration needed). d) Conventional sources (Conventional targets and hybrid targets) Simulations to optimize the unpolarized e+ yield (Collaboration with LAL). Evaluate the applicability of the Li lens. e) Electron source Set-up the CERN, CI, JLAB, SLAC collaboration for tracking studies. Preliminary tests at HV for the DC gun. Short-term plan mid-2009

1 st October Linear Collider workshop Undulator-based source Consider optimal target technology: thermal load, shock waves, activation (Collaboration with LLNL). Compton source Extend Geant4 model to Compton source (Collaboration with LAL) Stacking simulations studied in 6D. Lithium lens tests Participate to the BINP tests and CesrTA tests. Conventional sources Channelling measurements on NA63 experiment at CERN Perform experiments at KEKB positron source. Electron source Perform tracking studies (Collaboration with JLAB and SLAC). Hardware tests at JLAB and SLAC for the DC gun at very HV. CLIC/ILC work plan (2) Long-term plan mid mid-2010

1 st October Linear Collider workshop CLIC/ILC work plan (a) a)Undulator-based source Develop Geant4 model of collimator, target, capture optics, and capture RF assembly. Studies performed by L. Zang for his phd for CLIC Loss studies remain to be done. Comparison with ANL results should be done. Optimise parameters wrt yield, polarisation and cost (Collaboration with ANL). Simulations and optimization performed by ANL for ILC and CLIC. Report by W. Gai to this workshop. The cost is not yet evaluated. Consider timing constraints issues and upgrade paths. No progress Consider electron beam quality issues. Report “Emittance change in the main ILC electron beam due to interaction with the positron source undulator: A review of the studies” by J. Clarke

1 st October Linear Collider workshop b) Compton source Design of the Compton ring (Collaboration with NSC KIPT). Design advanced for a CLIC Compton Ring at 1.06 GeV and double chicane. Report under preparation with E. Bulyak and P. Gladkikh. CLIC/ILC work plan (b) Optical stacking cavity (Collaboration with LAL and KEK). Cavity tested at KEK with 2 mirrors. Report by T. Takahashi. “Photon Generation by Laser-Compton Scattering Using an Optical Resonant Cavity at the KEK- ATF Electron Ring” by H. Shimizu et al., Journal of the Physical Society of Japan, Vol. 78, No. 7, July, 2009, Cavity under development at LAL with 4 mirrors (present issue is related to the laser noise) “High finesse Fabry–Perot cavities in picosecond regime” by V. Brisson et al., NIM A 608 (2009) High power lasers. Important progress obtained by CELIA on a laser providing 200 W of average power with 178 MHz repetition frequency “ 200 W picosecond fiber laser for external cavity enhancement: toward 1 MW average power” by L. Meignien et al.

1 st October Linear Collider workshop CLIC/ILC work plan (b) Stacking simulations. Simulations performed for the longitudinal plane by F. Zimmermann. No progress for stacking in the transversal plane. A new proposal for a CLIC scheme using 2 storage rings (T. Omori & L.R.) Presented at POSIPOL 2009 workshop. b) Compton source

1 st October Linear Collider workshop CLIC/ILC work plan (c) c) Lithium lens capture optics Evaluate suitability for Undulator and Compton schemes (Wide collaboration needed). Report about capture efficiency by W. Gai /ANL for the undulator and about feasibility of the lens by A. Mikhailichenko to this workshop. No progress for Compton schemes.

1 st October Linear Collider workshop d) Conventional sources (Conventional targets and hybrid targets) Simulations to optimize the unpolarized e+ yield (Collaboration with LAL). Evaluate the applicability of the Li lens. Important progress made by LAL and CERN for the simulations. A CLIC Note, written by O. Dadoun / LAL, proposing an optimized configuration for CLIC parameters, is under approval. Simulations being performed up to the CLIC Pre-Damping (2.8 GeV) by A. Vivoli. CLIC/ILC work plan (d) No progress for the applicability of the Li lens

1 st October Linear Collider workshop CLIC/ILC work plan (e) e) Electron source Set-up the CERN, CI, JLAB, SLAC collaboration for tracking studies. Preliminary tests at HV for the DC gun. Several official agreements signed but the complete collaboration is not yet completed. Report at this workshop by A. Brachmann for the electron sources. Important progress have been made at JLAB for HV tests. Report at the CLIC workshop. Report at this workshop by F. Zhou on photocathodes Report at this workshop by J. Sheppard for the preliminary tests for CLIC.

1 st October Linear Collider workshop Undulator-based source Consider optimal target technology: thermal load, shock waves, activation (Collaboration with LLNL). Compton source Extend Geant4 model to Compton source (Collaboration with LAL) Stacking simulations studied in 6D. Lithium lens tests Participate to the BINP tests and CesrTA tests. Conventional sources Channelling measurements on NA63 experiment at CERN Perform experiments at KEKB positron source. Electron source Perform tracking studies (Collaboration with JLAB and SLAC). Hardware tests at JLAB and SLAC for the DC gun at very HV. CLIC/ILC work plan (2) Long-term plan mid mid-2010 Under study Not yet started Under discussion Not yet started Preparation well advanced Report at this workshop by J. Sheppard / SLAC

1 st October Linear Collider workshop Summary a) Major milestones have been achieved for the short-term plan 2008 – mid-2009 b) For the long-term plan, also important results have been obtained regarding the conventional targets and the DC gun for the electron sources. c) Nevertheless some milestones remain to be demonstrated for the short-term plan. d) Do we need to revise (update/complete) the present work plan ?