Situation with industry

Slides:



Advertisements
Similar presentations
Resistive bulks industrialization Status report 2 OCTOBER 2012 Fabien Jeanneau | PAGE 1 RD51 Collaboration meeting | Stony Brook University | October 2012.
Advertisements

Recent achievements and projects in Large MPGDs Rui de Oliveira 21/01/2009 RD51 WG1 workshop.
1 Short update Itzhak Tserruya HBD meeting BNL, April 11, 2006.
Status of the ATLAS MM project
13/04/2011Rui De Oliveira1 Resistors in Cern PCB worshop.
General needs at CERN for special PCB’s Philippe Farthouat CERN.
Atsuhiko Ochi 1, Yasuhiro Homma 1, Tsuyoshi Takemoto 1, Fumiya Yamane 1, Yousuke Kataoka 2, Tatsuya Masubuchi 2, Yuki Kawanishi 2, Shingo Terao 2 Kobe.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
Atsuhiko Ochi 1, Yasuhiro Homma 1, Tsuyoshi Takemoto 1, Fumiya Yamane 1, Satoru Yamauchi 1, Tatsuo Kawamoto 2, Yousuke Kataoka 2, Tatsuya Masubuchi 2,
Large-size micromegas for ATLAS (MAMMA) Status and prospects RD51 mini week, 17/01/2011Joerg Wotschack (CERN)1.
Read-out boards Rui de Oliveira 16/02/2009 RD51 WG1 workshop Geneva.
TE/MPE/EM/PMT activity Rui de Oliveira on behalf of PCB workshop team 29/11/20121.
Industrial Production of MPGDs Rui de Oliveira Workshop on neutron detection with MPGD CERN October
Atsuhiko Ochi Kobe University / MAMMA collaboration 24/04/2013 RD51 mini week, WG6.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
Atsuhiko Ochi, Kobe University 18/03/2015 RD51 CERN.
Atsuhiko Ochi Kobe University 28 August 2012 ATLAS muon chambers R&D on micromegas meeting.
CERN PCB workshop activities
Fabrication techniques and industrialization of MPGDs.
PCB issues requirements & procurement MMM Würzburg, 30/01/2014J. Wotschack1.
1 Fulvio TESSAROTTO RD51 meeting, Paris, 14/10/2008 THGEM production at ELTOS Production of THGEM at ELTOS S.p.A. Company profile Production procedures.
Atsuhiko Ochi Kobe University 25/06/2013 New Small Wheel MicroMegas Mechanics and layout Workshop.
Atsuhiko Ochi, Yuki Edo, Yousuke Kataoka ATLAS MicroMEGAS meeting, 11/12/12.
Resistive Strips Preparation - with carbon sputtering -
20/04/2012Rui De Oliveira1 20/04/2012. Rui De Oliveira2 30 cm x 30 cm example.
Situation with industry Rui de Oliveira RD51 CERN October
Quality Control and Quality Assurance for PCB production Fabian Kuger on behalf of the MAMMA Collaboration Julius-Maximilians Universität Würzburg, Germany.
MM construction organization Some thoughts MMM Saclay, 18/04/2013J. Wotschack1.
CERN Rui de OliveiraTS-DEM TS-DEM Development of Electronic Modules Rui de Oliveira CERN CERN hybrid production experience (or how to stay out of trouble)
CERN Rui de OliveiraTS-DEM Rui de Oliveira TS-DEM Large size detectors CERN TS-DEM-PMT Capabilities.
CERN workshop upgrade Aida fund Transfer to industry Rui De Oliveira 4/13/20111Rui De Oliveira.
PCB procurement WG Status report PCB WG status, 25/03/2014Joerg Wotschack.
EST-DEM R. De Oliveira 20 Dec., ‘04 Production of Gaseous Detector Elements  History of Gas Detectors in Workshop  Fabrication of GEM Detectors  Fabrication.
CERN Workshop upgrade Rui De Oliveira KOBE WG6 WG6 9/1/20111Rui De Oliveira.
Large area detectors Aida WP 9.2 RD51 WG6
5 th RD51 meeting (WG1) 25 May 2009 Atsuhiko Ochi ( Kobe University )
MM detector construction One or several modules per sector considerations.
Atsuhiko Ochi Kobe University
M. Bianco On behalf of the ATLAS Collaboration
Low Mass Rui de Oliveira (CERN) July
24/05/2010Rui De Oliveira1 Resistive protections for Bulk Micromegas Rui de oliveira, Joerg Wotschack Venetios Polychronakos.
Resistive protections Rui de Oliveira 09/12/15
30/09/2010Rui De Oliveira1.  GEM Single mask process  Micromegas  Bulk  Classical  resistive 30/09/2010Rui De Oliveira2.
Micromegas for the ATLAS upgrade (MAMMA) Status report
The Development of the Fabrication Process of Low Mass circuits Rui de Oliveira TS-DEM.
CERN Rui de OliveiraTS-DEM Rui de Oliveira TS-DEM Large size detectors practical limits based on present knowledge.
CERN Workshop upgrade status Rui De Oliveira RD51 22/11/2011 WG6 WG6 9/1/20111Rui De Oliveira.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
1 Fulvio TESSAROTTO THGEM discussion, 02/11/2009 THGEM production at ELTOS Production of THGEM at ELTOS S.p.A. Company profile Production procedures Small.
 Large GEM  CMS RE1-1  Kloe  Ns2 ( No stretch No stress)  Large Micromegas  Atlas MAMA project  Large THGEM  Double phase pure argon project 
WP7&8 Progress Report ITS Plenary meeting, 10 June 2014 LG, PK, VM, JR.
1 Fulvio TESSAROTTO CERN, 13/11/ COMPASS THGEM meeting Construction of the large size Hybrid Prototype The bulk Micromegas technology Examples of.
Atsuhiko Ochi (Kobe University) Yousuke Kataoka (ICEPP) ATLAS MicroMEGAS meeting, 19/01/13.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
Suggestions for a MPGD Workshop in Frascati Rui de Oliveira 1.
GEM, Resistive M-Bulk, ThGEM detector production. Rui De Oliveira, Cosimo Cantini, Antonio Teixeira, Olivier Pizzirusso, Julien Burnens Annecy 26/04/2012.
MPGD TECHNOLOGIES AND PRODUCTION GEMMicromegas Resistive MSGC (NEW!) Rui De Oliveira 7/12/20111Rui De Oliveira.
GEM, Micromegas detector production. detector’s dynamic range detector’s dynamic range Rui De Oliveira Catania 24/11/ /11/20111Rui De Oliveira.
Large GEM prototype production NS2 technique. Reminder NS2 technic 10 to 15mm Readout connector O-ring Drift electrode Free to slide External screws to.
1 RD51 Kolimpari June 2009 Stéphan AUNE, BULK lab at Saclay.
Rui De Oliveira Vienna March 2014 Industrialisation of Micromegas detector for ATLAS Muon spectrometer upgrade 1.
Rev:A ( check-->19 pages document)
The principle of operation of a micromegas chamber
New MPGDs at CERN PCB Workshop
Update on Pavia MM mechanical prototype
GEM and MicroMegas R&D Xiaomei Li Science and Technology
Gaseous detectors Task Resistive anode Micromegas
An improved design of R-MSGC
MicroMegas Mechanical Meeting --- Cern April 2014
Industrialization of the DLC deposition process
Presentation transcript:

Situation with industry Rui de Oliveira

Let me remind you the last process for mass production Micromegas Let me remind you the last process for mass production

Read/out PCB: 50um Kapton + resistive strips PCB + readout strips Crete june 2009 Rui De Oliveira

Read/out PCB: 50um Kapton + resistive strips PCB + readout strips 25um Glue Crete june 2009 Rui De Oliveira

Read/out PCB: 50um Kapton + resistive strips PCB + readout strips 25um Glue Isostatic Gluing Crete june 2009 Rui De Oliveira

Read/out PCB: 50um Kapton + resistive strips PCB + readout strips 25um solid Glue High temp Gluing Pillars creation Crete june 2009 Rui De Oliveira

Read/out PCB: 50um Kapton + resistive strips PCB + readout strips 25um solid Glue High temp Gluing Pillars creation Fiducial creation Crete june 2009 Rui De Oliveira

Read-out PCB with Pillars Micromegas final assembly: Drift electrode PCB Read-out PCB with Pillars

PCB ELTOS Boards of 2m x 0.5m have been already produced Quote request for 1200m2 (2.25m x 0.5m) on going 1.2m x 0.5m in production for MSW test ELVIA 2 Boards LSBB project 1.2m x 0.5m in production (2D read-out) Quote request for large volume soon Triangle labs:

Resistive deposition Charbonney Swiss company near CERN doing screen printing Printing 1m x 0.5m resistive strips  OK Max possible size: 1.5m x 0.9m Mass Production  OK MSW in production ATLAS MAMMA , LSBB and many small detectors have been produced Waiting for large volume quote ELVIA 1.2m x 0.5m LSBB in production (Screen printing) ELTOS 1.2 x 0.5m MSW in production (Screen printing) 2.3m x 0.5m possible We are waiting for large volume quote --------------------------------------------------------------------------------------------------------------------------------------------------- Raytech Japanese company (Ochi Atsuhiko contact) Vacuum deposited resistive layers (lift off technique) Wikipedia PECVD

Large size gluing MDT Italian company having an extra large Isostatic press (similar process used at CERN) Press gluing capability 4.2m x 1.6m  to be tested Mass production  seems OK Quotes for large volume not yet asked We should organize a visit and probably make the MSW prototypes ELVIA They have an Autoclave with the correct dimension.

Pillar creation ELTOS 1.2m x 0.5m MSW Micromegas in production Quote for 1200m2 requested ELVIA LSBB 1.2m x 0.5m real BULK in production Quote for large volume still to be sent. Triangle Labs No request submitted up to now

Mesh stretching Seritec Swiss company near CERN stretching meshes Stretching 2m x 1m mesh  OK Max possible size: 3.2m x 2.2m Mass production  OK We are studying the received quotes for 1200m2

Registration Optical fiducial (ultimate precision) RASMASKs directly on the boards A few um error due to the photolithographic mask. Mechanical fiducial (less precise due to assembly steps) Precise CCD or X-ray drilling machine Drill perfectly in the middle of a pattern. Triangle Labs have such machine (+/-15um error claimed by the machine producer : PLURITEC) This machine can drill and mill on 2.5m x 0.6m

PCB production considerations PCB size: 0.5 x 2.4 m2, the same for all boards Combine two small boards into one PCB; reduces # of PCB layouts 24 different PCB layouts Number of PCBs (w/o) spares: 1536 Production could be split between two or three producers PCB production in four steps Etching of readout pattern Gluing of KAPTON foil with resistive strips (produced in Japan) Making of pillars Cutting and drilling All steps could be done by different industries or some by the same Three or four different call for offers

PCB production time line MM construction start: 2015 PCB production contracts should be signed in fall 2014 First boards to be delivered in Feb 2015 Typical output: 8 boards/day 3 – 4 months if split b/w three producers 6 months if two producers

PCB production - open questions What about spares? What about the drift electrodes? Cu-clad PCBs – if so, who does them? Conducting paint (spray ?) Cu foil ? Other …

PCB production – Module 0 Use PCBs for Module 0 to qualify potential production sites & procedures Split orders into small orders in different companies (if possible) Contracts for full production will not yet be signed Module 0 orders have to be placed in April 2014 to have PCBs for Module 0 construction in June/July PCB layout/design has to be frozen in March Qualification of Kapton glueing and pillar deposition on full-size PCBs to be done b/w now and February 2014

Thank you